West Point Dam spillway operations, Georgia, 11 April 2025. Historical operating context. DVIDS Photo ID 9525176.
Crop of a U.S. Army photograph by Travis England / U.S. Army Corps of Engineers, Mobile District, via DVIDS. Photo ID 9525176.
Author as credited: Travis England
https://www.dvidshub.net/portfolio/1817101/travis-england
Original source: https://www.dvidshub.net/image/9525176/west-point-dam-50th-anniversary-celebration
Source marked PUBLIC DOMAIN; U.S. official-duty basis, subject to use restrictions: DVIDS use restrictions
https://www.dvidshub.net/about/copyright
Changes: Cropped from the 1000 x 667 source-page JPEG at x=380, y=150, width=620, height=400 (top-left origin). Saved as a 620 x 400 JPEG; JPEG re-encoded, with no resizing.
The appearance of U.S. Department of War (DoW) visual information does not imply or constitute DoW endorsement.
This notice covers this photograph and the stated image changes only; article text and other site content are excluded.
Image: west-point-spillway-20250411-dvids9525176-card-r1-20261104.jpg
SHA-256: 3d10207179526cdd94fbfbdf32164559a009fbda6ed468fc0d23ae6cb23a0f3a
Photo credit: https://imwo.org/briefs/brief-west-point-gate-maintenance-release#photo-credit-card_image
Keep this credit with the photo when sharing or redistributing it.
