Miter-gate sections inside the new Chickamauga lock chamber, photographed 20 February 2026 before contract termination.
Noe Gonzalez / U.S. Army Corps of Engineers, Nashville District, via DVIDS. Chickamauga lock chamber, 20 February 2026; historical construction view. Public domain in the United States; source rendition unchanged.
Author as credited: Noe Gonzalez, U.S. Army Corps of Engineers, Nashville District
https://www.dvidshub.net/image/9534875/look-inside-chickamaugas-new-lock-chamber
Original source: https://www.dvidshub.net/image/9534875/look-inside-chickamaugas-new-lock-chamber
Historical and newsworthy editorial use with credit and non-endorsement conditions: Public domain; DVIDS public-use conditions
https://www.dvidshub.net/about/copyright
Changes: DVIDS source rendition, 1999 x 1333 pixels, full source frame unchanged.
The appearance of U.S. Department of War (DoW) visual information does not imply or constitute DoW endorsement.
This notice covers this photograph and the stated image changes only; article text and other site content are excluded.
Image: miter-gates-source-20261105.jpg
SHA-256: fae231ed28b47fdf74ec3ba470e001f8fa7ab8ad73ffa414b6c0c0a7903bed9c
Photo credit: https://imwo.org/articles/article-chickamauga-termination-revenue-cash-recovery#photo-credit-image
Keep this credit with the photo when sharing or redistributing it.
