Duke Marine Lab western Pivers Island shoreline, historical 2019 aerial photograph in the NOAA site report.
Source: NOAA NCCOS, Site Report: Duke Marine Lab, Figure 1 (p. 1). Aerial photograph, 2019; historical context. Cropped and resized.
Author as credited: NOAA NCCOS (institutional source)
https://cdn.coastalscience.noaa.gov/page-attachments/Restoration-storymap/Duke-Sill-formatted.pdf
Original source: https://cdn.coastalscience.noaa.gov/page-attachments/Restoration-storymap/Duke-Sill-formatted.pdf
NOAA material reuse and credit conditions: NOAA source-use policy
https://oceanservice.noaa.gov/about/faq.html
Changes: Cropped at x=0, y=255 to 1,049 x 590 pixels; resized to 1,200 x 675 pixels and JPEG re-encoded by IMWO.
Retain NOAA and source-report credit with the stated image changes. Reuse must preserve the source context and avoid implying government endorsement or affiliation.
This notice covers this photograph and the stated image changes only; article text and other site content are excluded.
Image: duke-2019-sill-card-source-20261104.jpg
SHA-256: 4754b88665880a760e759875d4a1f3d7021efdad2ef5baf5e0601e8d88afc3a2
Photo credit: https://imwo.org/briefs/brief-duke-living-shoreline-elevation-deficit#photo-credit-card_image
Keep this credit with the photo when sharing or redistributing it.
