# IMWO Organization Profiles Public organization index for ports, dredging, coastal infrastructure, marine utilities, specialist contractors, consultants, suppliers and infrastructure owners covered by IMWO. Governed groups support consistent filtering; precise types preserve each organization's evidenced role. > Public inventory reviewed 2026-08-16: 213 organization profiles. Roles describe evidenced operating or owner-side interfaces; they are not endorsements, rankings or proof of a current award. - 2026-08-16 — [Chennai Port Authority](https://imwo.org/companies/profile-chennai-port-authority) — group: Port and waterway authorities; type: Indian major-port authority and east-coast public port owner; regions: Asia Pacific, India, Tamil Nadu, Chennai, Bay of Bengal; roles: Statutory major-port authority; Chennai port owner and public infrastructure client; Navigation channel, berthing and marine traffic administrator; Bharathi, Dr Ambedkar and Jawahar dock asset owner; Berth reconstruction and civil engineering sponsor; Passenger, container, automobile and multi-cargo gateway. - 2026-08-16 — [Syama Prasad Mookerjee Port, Kolkata](https://imwo.org/companies/profile-syama-prasad-mookerjee-port-kolkata) — group: Port and waterway authorities; type: Indian riverine major-port authority, dock-system owner and navigation-channel client; regions: Asia Pacific, India, West Bengal, Hooghly River, Kolkata, Haldia, Sagar; roles: Statutory major-port authority; Kolkata Dock System and Haldia Dock Complex administrator; Riverine navigation-channel and marine-services authority; Capital and maintenance dredging project client; Hydrographic, bathymetric and river-regulatory works body; Port infrastructure, terminal and cargo-handling development sponsor. - 2026-08-16 — [Infrastructure Malta](https://imwo.org/companies/profile-infrastructure-malta) — group: Public delivery and advisory bodies; type: Maltese public infrastructure delivery agency and maritime works client; regions: Europe, Malta, Grand Harbour, Marsaxlokk, Ras Hanzir; roles: Statutory public infrastructure agency; Maritime infrastructure development and maintenance body; Harbour, quay, breakwater and ferry-landing works client; Dredging and coastal-infrastructure project authority; Shore-power and port-electrification delivery body; Public marine works procurer and contract administrator. - 2026-08-16 — [Deendayal Port Authority](https://imwo.org/companies/profile-deendayal-port-authority) — group: Port and waterway authorities; type: Indian major-port authority and Kandla public port owner; regions: Asia Pacific, India, Gujarat, Gulf of Kutch, Kandla, Vadinar; roles: Statutory major-port authority; Kandla port owner and public infrastructure client; Port planning, regulation and operations administrator; Cargo-berth renewal and development sponsor; Dredging, reclamation and shore-protection project authority; Vadinar offshore oil-terminal infrastructure administrator. - 2026-08-16 — [Great Ocean Road Coast and Parks Authority](https://imwo.org/companies/profile-great-ocean-road-coast-parks-authority) — group: Public delivery and advisory bodies; type: Victorian statutory coastal and local-port authority; regions: Asia Pacific, Australia, Victoria, Great Ocean Road, Apollo Bay, Port Campbell, Lorne; roles: Statutory coast-and-parks manager; Port manager for Apollo Bay, Port Campbell and Lorne; Apollo Bay waterway manager and harbour-master function holder; Harbour dredging and navigation-aid maintenance authority; Wharf, marina, mooring, boat-ramp and slipway asset manager; Coastal protection and marine-infrastructure client. - 2026-08-16 — [Government of Cantabria Directorate-General for Water and Ports](https://imwo.org/companies/profile-cantabria-directorate-water-ports) — group: Public delivery and advisory bodies; type: Autonomous-community port administration and marine-infrastructure owner; regions: Europe, Spain, Cantabria, Santoña, Suances estuary, Miengo; roles: Autonomous-port system planner and administrator; Fishing and recreational port infrastructure owner; Port capital-works and maintenance client; Navigation-channel and harbour-basin maintenance authority; Port-domain authorization and concession administrator; Port service, rate and operating-control body; Dredging, quay, pontoon, piling and utility procurement authority. - 2026-08-16 — [Public Transport Authority of Western Australia](https://imwo.org/companies/profile-public-transport-authority-western-australia) — group: Public delivery and advisory bodies; type: State statutory public transport authority, infrastructure owner and ferry-service client; regions: Asia Pacific, Australia, Western Australia, Perth, Swan River, Elizabeth Quay; roles: Statutory public passenger transport authority; Transperth metropolitan ferry-service client and system manager; Public transport infrastructure designer, builder and maintainer; Ferry terminal, landing, platform and gangway works client; Transport asset owner and manager; Works, facilities and passenger-service contract procurer; Ferry network planning and expansion sponsor. - 2026-08-16 — [Region Hauts-de-France - Ports Directorate](https://imwo.org/companies/profile-region-hauts-de-france-ports) — group: Port and waterway authorities; type: French regional-government port authority, asset owner and marine-works client; regions: Europe, France, Hauts-de-France, Boulogne-sur-Mer, Calais, Strait of Dover; roles: Owner and port authority for Boulogne-sur-Mer and Calais; Marine-infrastructure owner and works client; Navigation-channel, basin and dredging client; Hydrographic and sediment-monitoring client; Breakwater, jetty, lock, quay and movable-asset custodian; Non-conceded port-domain operator and maintainer; Commercial port-operation delegation supervisor; Regional maritime, port and coastal-policy authority. - 2026-08-16 — [North Adriatic Sea Port Authority (Ports of Venice and Chioggia)](https://imwo.org/companies/profile-north-adriatic-sea-port-authority) — group: Port and waterway authorities; type: Italian port-system authority and marine-infrastructure owner; regions: Europe, Italy, Veneto, Venice Lagoon; roles: Port-system authority; Marine-infrastructure owner and works client; Navigation-channel and common-area maintainer; Maritime state-property and concession administrator; Port planning and development authority; Port-service and operator supervisor; Road, rail and inland-waterway access coordinator. - 2026-08-16 — [Igoumenitsa Port Authority S.A. (IPA S.A.)](https://imwo.org/companies/profile-igoumenitsa-port-authority) — group: Port and waterway authorities; type: Greek concession port operator and marine-infrastructure owner; regions: Europe, Greece, Epirus, Adriatic-Ionian corridor; roles: Port concession operator; Passenger, vehicle and cargo handler; Vessel-berthing service provider; Port infrastructure developer and operator; Marine and utility works client; CEF programme coordinator; Fishing-shelter and marina concession manager. - 2026-08-16 — [Port of Felixstowe](https://imwo.org/companies/profile-port-of-felixstowe) — group: Operators and concessionaires; type: Private container-port owner-operator and statutory harbour authority; regions: Europe, United Kingdom, England, Suffolk, Harwich Haven; roles: Container and Ro-Ro terminal owner-operator; Statutory and competent harbour authority; Marine services and berth operator; Port equipment and infrastructure client; Intermodal rail-terminal operator. - 2026-08-16 — [Algeciras Bay Port Authority (APBA)](https://imwo.org/companies/profile-algeciras-bay-port-authority) — group: Port and waterway authorities; type: Spanish state-port authority and marine-infrastructure owner; regions: Europe, Spain, Bay of Algeciras, Tarifa; roles: State-port authority; Port infrastructure owner and landlord; Marine and utility works client; Port-domain and concession manager; Port-service and traffic coordinator; Marine-aids and navigation-infrastructure authority; Algeciras and Tarifa electrification programme owner. - 2026-08-16 — [PFCIGL-RDC Project Management Unit (UGP)](https://imwo.org/companies/profile-pfcigl-rdc-project-management-unit) — group: Public delivery and advisory bodies; type: DRC cross-border trade infrastructure project implementation unit; regions: Africa, Democratic Republic of the Congo, South Kivu, Lake Tanganyika, Great Lakes region; roles: P174814 DRC implementing agency; Cross-border infrastructure client; Lake-port improvement programme coordination; Procurement and contract administration; Consultant and works-supervision interface; Ministry, interministerial and provincial coordination; Safeguards, monitoring and reporting coordination. - 2026-08-16 — [Mid West Ports Authority](https://imwo.org/companies/profile-mid-west-ports-authority) — group: Port and waterway authorities; type: Western Australian port authority and Government Trading Enterprise; regions: Asia Pacific, Western Australia, Geraldton and the Mid West; roles: Geraldton Port and Fishing Boat Harbour operator; Port-reserve, berth, channel and marine-asset custodian; Geraldton Port Maximisation Project proponent and works client; Harbourmaster, vessel-movement and marine-safety authority; Dredging, breakwater, berth and tug-harbour procurement counterparty; Environmental-management, commissioning and owner-acceptance interface. - 2026-08-16 — [U.S. Army Corps of Engineers, Civil Works](https://imwo.org/companies/profile-usace-civil-works-navigation) — group: Public delivery and advisory bodies; type: Federal water-resources agency and navigation-project owner; regions: Americas, United States, Atlantic Coast, Gulf Coast, Pacific Coast, Great Lakes, Inland waterways; roles: Federal navigation project owner; Coastal and inland navigation asset manager; Planning, design, construction and operations-and-maintenance authority; District contracting, task-order and contract-administration authority; Corps-owned fleet and private dredging programme scheduler; Hydrographic survey and channel-condition publisher; National DQM programme owner and dredging-data steward; Dredged-material management and beneficial-use programme partner; Waterborne-commerce and navigation-infrastructure data publisher; Non-federal sponsor partnership administrator. - 2026-08-16 — [Callan Marine](https://imwo.org/companies/profile-callan-marine-dredging-contractor) — group: Contractors and equipment providers; type: Dredging and marine construction contractor; regions: Americas, United States, U.S. Gulf Coast; roles: Capital and maintenance dredging contractor; Navigation-channel and berth dredging contractor; Beneficial-use and dredged-material placement contractor; Environmental dredging and dewatering contractor; Marine civil and pile-driving contractor; Cutter suction dredge operator. - 2026-08-15 — [Inland Waterways Authority of India (IWAI)](https://imwo.org/companies/profile-inland-waterways-authority-india) — group: Port and waterway authorities; type: Indian statutory national-waterway development and regulatory authority; regions: Asia Pacific, India, Ganga-Bhagirathi-Hooghly river system, National Waterway-1, National Waterways; roles: National-waterway development and statutory regulation; Fairway maintenance, hydrographic surveying and dredging; Multimodal terminals, community jetties and floating pontoons; Navigation locks, aids and river-information services; Public works procurement and contract administration; Inland vessel, dredger and ship-repair infrastructure; Passenger, cargo and last-mile waterway facilities. - 2026-08-15 — [Czech Waterways Directorate (ŘVC ČR)](https://imwo.org/companies/profile-czech-waterways-directorate) — group: Port and waterway authorities; type: Czech state inland-waterway infrastructure and public-port body; regions: Europe, Czechia, Elbe, Vltava, Morava, Baťa Canal; roles: National inland-waterway investment preparation and delivery; Public port, landing-place and mooring infrastructure; Waterway modernization, repair and maintenance; Navigation and river-information services; Public works procurement and contract publication; Vessel service infrastructure and special-vessel operation; Marina and recreational-navigation infrastructure. - 2026-08-15 — [PIC3 Madagascar Project Execution Unit](https://imwo.org/companies/profile-madagascar-pic3-project-execution-unit) — group: Public delivery and advisory bodies; type: Madagascar economic-transformation and regional-infrastructure project implementation unit; regions: Africa, Madagascar, Atsinanana, Toamasina; roles: Government project execution; Regional public-infrastructure programme coordination; River-port and landing-facility procurement; Works and consultant contract administration; Environmental and social safeguards management; National and regional stakeholder coordination; Programme monitoring and procurement reporting. - 2026-08-15 — [Northern Territory Department of Logistics and Infrastructure](https://imwo.org/companies/profile-northern-territory-department-logistics-infrastructure) — group: Public delivery and advisory bodies; type: Northern Territory infrastructure and transport agency; regions: Asia Pacific, Australia, Northern Territory, Top End; roles: Public infrastructure client; Construction procurement; Transport asset management; Marine maintenance oversight. - 2026-08-15 — [Aguas de las Cuencas de España (ACUAES)](https://imwo.org/companies/profile-acuaes) — group: Public delivery and advisory bodies; type: Spanish state-owned hydraulic infrastructure delivery company; regions: Europe, Spain, Spanish river basins, Extremadura, Cáceres, Tagus basin; roles: State hydraulic-infrastructure promoter; Public works contracting authority and client; Water-supply, sanitation and wastewater-treatment delivery; Water-reuse and environmental-compliance infrastructure; Design, construction and contract management; Inter-administration and user-agreement structuring; European-fund and public-investment delivery; Infrastructure operation where specifically commissioned. - 2026-08-15 — [New York City Department of Parks & Recreation (NYC Parks)](https://imwo.org/companies/profile-new-york-city-parks) — group: Public delivery and advisory bodies; type: Municipal parks, waterfront and capital-delivery agency; regions: Americas, United States, New York City, Bronx, New York City waterfront and park system; roles: Municipal waterfront and parkland owner; Capital project design, procurement and construction; Marina and recreational boating-facility stewardship; In-water capital construction coordination; Engineered and natural shoreline infrastructure liaison; Marine vessel-fleet and on-water response management; Waterfront resilience and post-storm reconstruction; Construction permitting and park-asset restoration oversight. - 2026-08-15 — [Transnet National Ports Authority (TNPA)](https://imwo.org/companies/profile-transnet-national-ports-authority) — group: Port and waterway authorities; type: South African national port authority, landlord and marine-services provider; regions: Africa, South Africa, Southern Africa, Port of Durban, South African commercial-port system; roles: National commercial-port landlord and infrastructure owner; Port master planning, capital works and asset maintenance; Navigation control, Harbour Master and vessel-traffic oversight; Pilotage, tug assistance and berthing services; Dredging, hydrographic services and aids to navigation; Port-service and terminal-operator licensing and oversight; Port land, leases and public-domain administration; Marine safety, security and environmental control. - 2026-08-15 — [Ministry of Blue Economy and Fisheries, Zanzibar](https://imwo.org/companies/profile-zanzibar-ministry-blue-economy-fisheries) — group: Public delivery and advisory bodies; type: Zanzibar government ministry and TASFAM implementing agency; regions: Africa, Tanzania, Zanzibar, Western Indian Ocean; roles: Marine conservation area governance; Fisheries and coastal-resource policy; TASFAM project coordination and procurement; Marine infrastructure and conservation-equipment investment. - 2026-08-15 — [Galway County Council](https://imwo.org/companies/profile-galway-county-council-marine) — group: Port and waterway authorities; type: Irish local authority and coastal infrastructure manager; regions: Europe, Ireland, County Galway, Atlantic Islands; roles: Piers, harbours and landing-place management; Island harbour regulation and ferry infrastructure; Marine capital works and dredging procurement; Coastal protection and mooring maintenance. - 2026-08-15 — [Port of San Francisco](https://imwo.org/companies/profile-port-of-san-francisco) — group: Port and waterway authorities; type: City port department and California public-trust waterfront manager; regions: Americas, United States, California, San Francisco Bay; roles: Public-trust port governance; Maritime terminal owner and landlord; Marine engineering and asset maintenance; Construction and dredging procurement. - 2026-08-15 — [Port of Edmonds](https://imwo.org/companies/profile-port-of-edmonds) — group: Port and waterway authorities; type: Washington public port district and marina owner-operator; regions: Americas, United States, Washington, Puget Sound; roles: Public port district governance; Marina owner and operator; Waterfront capital planning; Public works procurement. - 2026-08-15 — [Autoridad Portuaria Nacional (APN), Peru](https://imwo.org/companies/profile-autoridad-portuaria-nacional-peru) — group: Port and waterway authorities; type: Peruvian port authority and dredging client; regions: Americas, Peru, Callao; roles: National port planning; Port investment and technical review; Operations and environmental oversight; Callao dredging client. - 2026-08-15 — [PRTD-Mali Project Management Unit (UGP)](https://imwo.org/companies/profile-prtd-mali-project-management-unit) — group: Public delivery and advisory bodies; type: Mali landscape-restoration and water-infrastructure project implementation unit; regions: Africa, Mali, Mopti Region, Niger River, Inner Niger Delta; roles: Government landscape-restoration project implementation; Riverbank, quay, lateral-canal and dredging programme coordination; Works and consultant procurement; Contract administration and owner-side delivery coordination; Environmental and social safeguards management; Regional implementation-team coordination; Monitoring, evaluation and public reporting; World Bank supervision and fiduciary interface. - 2026-08-15 — [Lesotho Lowlands Water Development Project Phase II](https://imwo.org/companies/profile-lesotho-lowlands-water-development-project-phase-ii) — group: Public delivery and advisory bodies; type: Government of Lesotho water-infrastructure project implementation unit; regions: Africa, Lesotho, Leribe District, Mafeteng District, Mohale's Hoek District, Hlotse and Maputsoe; roles: Government water-infrastructure project implementation; Bulk-water intake, treatment and transmission programme coordination; Procurement and contract administration; Works, consultant and financing-partner coordination; Environmental and social safeguards management; Dam-safety panel and technical-assurance interface; Water-sector institutional strengthening; Programme monitoring, reporting and public procurement records. - 2026-08-15 — [NSW Public Works](https://imwo.org/companies/profile-nsw-public-works) — group: Public delivery and advisory bodies; type: NSW state-government infrastructure advisory, procurement and delivery agency; regions: Asia Pacific, Australia, New South Wales, Regional New South Wales, South Coast and Illawarra; roles: Whole-of-government construction procurement system custodian; Infrastructure advisory and project assurance; Project and programme management; Strategic procurement and contract administration; Coastal and river-structure engineering support; Floodplain, stormwater and bank-protection planning; Dam, water and wastewater infrastructure delivery support; Construction surveillance, technical compliance and closeout. - 2026-08-15 — [Malaga Port Authority (Autoridad Portuaria de Malaga)](https://imwo.org/companies/profile-malaga-port-authority) — group: Port and waterway authorities; type: Spanish state-port authority and maritime-infrastructure owner; regions: Europe, Spain, Andalusia, Western Mediterranean, Port of Malaga; roles: State-port landlord and public-domain manager; Quay, breakwater, harbour and landside-infrastructure owner; Port works planning, design, procurement and conservation; Harbour traffic, berth and marine-service coordination; Navigation-aid and port-safety oversight; Construction acceptance and asset-maintenance client; Intermodal and port-city development planning; Environmental and operational interface management. - 2026-08-15 — [Maritime Danube Ports Administration (CN APDM SA Galati)](https://imwo.org/companies/profile-cn-apdm-galati-maritime-danube-ports) — group: Port and waterway authorities; type: Maritime-Danube port administrator; regions: Europe, Romania, Maritime Danube, Galati, Lower Danube; roles: Port administration and infrastructure concession; Port development client; Maintenance, signalling, dredging and depth-programme owner; Depth-survey publisher; Berth, port-land and access manager; Delegated port and inland-waterway authority functions. - 2026-08-15 — [Gambia Ports Authority](https://imwo.org/companies/profile-gambia-ports-authority) — group: Port and waterway authorities; type: Gambian statutory port authority, harbour regulator and marine-infrastructure owner; regions: Africa, West Africa, The Gambia, Port of Banjul, River Gambia estuary; roles: Statutory Port of Banjul owner and regulator; Harbour Master, marine-safety and pollution authority; Access-channel, pilotage and navigation-aid manager; Maintenance-dredging asset and service oversight; Banjul Fisheries Jetty manager; Banjul Shipyard and ferry-asset oversight; Port infrastructure planning and procurement client; Concession and port-information-system interface. - 2026-08-15 — [Parks Victoria](https://imwo.org/companies/profile-parks-victoria-waterway-manager) — group: Port and waterway authorities; type: Victorian statutory park, local-port and waterway management authority; regions: Asia Pacific, Australia, Victoria, Port Phillip, Western Port, Yarra and Maribyrnong rivers; roles: Local-port manager for Port Phillip and Western Port; Yarra and Maribyrnong statutory waterway manager; Navigation-aid and vessel-activity manager; Dredging and seabed-management client; Marine-works permission authority; Mooring, berth and anchorage asset manager; Safety and Environment Management Plan authority. - 2026-08-14 — [Morocco Ministry of Equipment and Water - Ports Directorate](https://imwo.org/companies/profile-morocco-ministry-equipment-water-ports) — group: Port and waterway authorities; type: National port-infrastructure ministry and maritime public-domain authority; regions: Africa, Morocco, Moroccan Atlantic and Mediterranean coasts; roles: National port policy and infrastructure authority; Port and marine civil-works client; Maritime public-domain administrator; Hydrography and marine-cartography authority; Navigation-marking plan approval authority; Port operating-document approval authority; Port security and compliance authority; Public infrastructure programme publisher. - 2026-08-14 — [Norwegian Coastal Administration (Kystverket)](https://imwo.org/companies/profile-kystverket-norwegian-coastal-administration) — group: Port and waterway authorities; type: National coastal, fairway and fishing-port authority; regions: Europe, Norway, Norwegian coast and fairways; roles: National fairway owner and authority; Fairway development and maintenance; Fishing-port and breakwater infrastructure client; Dredging and sediment-management project owner; Quay and marine civil-works client; Aids-to-navigation infrastructure operator; Vessel traffic, pilotage and maritime information authority; Coastal pollution preparedness authority. - 2026-08-14 — [Plymouth City Council](https://imwo.org/companies/profile-plymouth-city-council) — group: Public delivery and advisory bodies; type: English unitary local authority, waterfront-asset owner and marine-infrastructure client; regions: Europe, United Kingdom, England, Devon, Plymouth Sound, Mount Batten; roles: Local-authority owner and client for public waterfront assets; Mount Batten pontoon and bridgehead programme sponsor; Marine civil and floating-infrastructure procurement authority; Public ferry continuity and accessible-waterfront investment client; Seawall, slipway and waterfront public-realm asset manager; Plymouth Sound National Marine Park programme partner; City port and waterfront investment strategist. - 2026-08-14 — [Birdon](https://imwo.org/companies/profile-birdon-maritime-dredging) — group: Contractors and equipment providers; type: Australian maritime engineering, dredging and marine-equipment contractor; regions: Australia, Port Phillip and Western Port, New South Wales, South Australia, Queensland, Asia Pacific; roles: Maintenance and capital dredging; Cutter-suction and backhoe dredging; Navigation-channel and harbour maintenance; Dredge and sand-transfer-system supply, modification, installation and testing; Beach nourishment and slurry transfer; Hopper, split-hopper, work-barge, tug and workboat operations; Mine-tailings dredging and remediation; Equipment establishment and maintenance. - 2026-08-14 — [Fisheries and Oceans Canada - Small Craft Harbours](https://imwo.org/companies/profile-fisheries-oceans-canada-small-craft-harbours) — group: Port and waterway authorities; type: Canadian federal fishing-harbour owner, asset programme and harbour-authority partner; regions: Americas, Canada, Atlantic Canada, Arctic Canada, Pacific Canada, Quebec, Ontario and Prairies; roles: National fishing-harbour asset owner and maintainer; Core and non-core harbour portfolio management; Wharf, breakwater and shore-protection capital works; Harbour and access-channel dredging; Floating-dock, gangway and mooring infrastructure; Harbour-condition monitoring and repair planning; Major and minor repair funding; Federal real-property custody under the Fishing and Recreational Harbours Act; Local harbour-authority support and operating partnership; Non-core harbour divestiture and environmental cleanup; Climate-resilience and northern-harbour capital planning; Project procurement through PSPC where assigned. - 2026-08-14 — [Fa. Gebr. Van der Lee](https://imwo.org/companies/profile-gebr-van-der-lee-dredging-contractor) — group: Contractors and equipment providers; type: Marine and civil-infrastructure contractor; regions: Europe; roles: Navigation-channel and port maintenance-dredging contractor; Trailing-suction hopper dredger owner and operator; Water-injection and plough-dredging contractor; Beach and foreshore nourishment contractor; Coastal-defence and breakwater contractor; Land-reclamation and port-development contractor; Dredged-material transport, placement and survey contractor. - 2026-08-14 — [Hall Pacific](https://imwo.org/companies/profile-hall-pacific-dredging-marine-contractor) — group: Contractors and equipment providers; type: Dredging, marine civil, and coastal-infrastructure contractor; regions: Pacific Islands, Asia Pacific, Australia, Southeast Asia; roles: Dredging contractor; Marine civil contractor; Coastal-protection contractor; Land-reclamation contractor; Wharf, jetty and breakwater contractor; Climate-adaptation contractor; Remote-island infrastructure contractor. - 2026-08-14 — [Western Australia Department of Transport and Major Infrastructure](https://imwo.org/companies/profile-western-australia-transport-major-infrastructure) — group: Port and waterway authorities; type: State transport, maritime and major-infrastructure department; regions: Asia Pacific, Western Australia; roles: State marine-safety and navigable-waters authority; Harbour Master and Shipping and Pilotage port operator; Marine pilot, jetty and mooring licensing authority; Aids-to-navigation and notices-to-mariners authority; Public harbour, marina, jetty and boating-facility manager; Maintenance-dredging and annual sand-bypassing client; Coastal-engineering, tide, wave and cartographic data authority; Marine emergency, wreck and oil-pollution response lead; Marine infrastructure planner, buyer and owner-acceptance authority. - 2026-08-14 — [Grand Port Maritime de Dunkerque](https://imwo.org/companies/profile-grand-port-maritime-dunkerque-port-authority) — group: Port and waterway authorities; type: State-owned port authority; regions: Europe; roles: Port authority; Marine-access owner and operator; Port infrastructure client; Maintenance dredging and sediment-management authority; Coastal-protection asset owner; Port mechanical and submerged-asset maintenance buyer; Industrial and logistics estate developer; Port capital-programme sponsor. - 2026-08-14 — [China Communications Construction Company Limited](https://imwo.org/companies/profile-china-communications-construction-company) — group: Contractors and equipment providers; type: Listed Chinese transport-infrastructure, port, dredging and marine-engineering contractor; regions: Global, Middle East, Asia Pacific, Africa; roles: Port engineering, procurement and construction; Dredging and reclamation group capability; Marine and transport-infrastructure design and construction; Waterway and inland-port contractor; Port-equipment and heavy-marine-equipment group capability; Listed parent contractor and project-governance counterparty. - 2026-08-14 — [Maritime Safety Queensland](https://imwo.org/companies/profile-maritime-safety-queensland) — group: Port and waterway authorities; type: Queensland maritime-safety, waterways and boating-infrastructure authority; regions: Asia Pacific, Australia, Queensland, Far North Queensland; roles: Queensland maritime-safety and waterways authority; State marine-infrastructure asset steward; State boating-harbour and recreational-access dredging client; Port Douglas entrance-channel maintenance owner; Hydrographic survey standards and navigable-water advice body; Aids-to-navigation and vessel-traffic service provider; Reef VTS joint service participant; Dredging environmental-control and water-quality interface; Material-route and dredged-material facility coordinator; Owner-side post-dredge survey and access-restoration interface; Townsville MSQ Base wharf-maintenance client interface. - 2026-08-14 — [Van den Herik](https://imwo.org/companies/profile-van-den-herik-waterbouw-contractor) — group: Contractors and equipment providers; type: Marine and hydraulic contractor; regions: Europe; roles: Dredging contractor; Maintenance dredging contractor; Beach nourishment contractor; Hydraulic engineering contractor; Port civil works contractor; Bottom and bank protection contractor; Waterway asset maintenance contractor; Marine survey provider; Marine plant owner. - 2026-08-14 — [ACWA Power](https://imwo.org/companies/profile-acwa-water-infrastructure-developer) — group: Water and utility bodies; type: Desalination, power and green-hydrogen developer, investor and operator; regions: Middle East, Africa, Central Asia, Asia Pacific; roles: Independent water project developer; Infrastructure investor; Project company shareholder; Long-term offtake project sponsor; Public-private partnership developer; Desalination plant operator; Operations and maintenance platform owner; Marine intake and outfall asset sponsor; Green hydrogen and ammonia project sponsor. - 2026-08-14 — [ACCIONA](https://imwo.org/companies/profile-acciona-water-infrastructure-developer-contractor) — group: Contractors and equipment providers; type: Integrated infrastructure, water, port and concession developer-contractor; regions: Africa, Asia Pacific, Middle East, Europe, Americas; roles: Integrated infrastructure developer and contractor; Water design and construction contractor; Desalination EPC and commissioning lead; Long-term water operations and maintenance provider; Concession and PPP investor; Port and terminal civil works contractor; Breakwater and quay contractor; Floating caisson producer; Tunnelling and marine utility interface contractor; Alliance and joint-venture delivery partner. - 2026-08-14 — [Jan De Nul Group](https://imwo.org/companies/profile-jan-de-nul-marine-contractor) — group: Contractors and equipment providers; type: Dredging, marine infrastructure and offshore-energy contractor; regions: Global, Asia Pacific, Europe, Middle East, Americas, Africa; roles: Marine contractor; Dredging contractor; Reclamation contractor; Port and marine infrastructure contractor; Coastal protection contractor; Offshore foundation installation contractor; Subsea cable installation contractor; Subsea rock installation contractor; Environmental remediation contractor; Waterway concessionaire; Specialist marine plant owner. - 2026-08-14 — [DEME Group](https://imwo.org/companies/profile-deme-marine-contractor) — group: Contractors and equipment providers; type: Dredging, marine infrastructure and offshore-energy contractor; regions: Global, Europe, Asia Pacific, Middle East, Africa, Americas; roles: Marine contractor; Dredging contractor; Reclamation contractor; Port and marine infrastructure contractor; Coastal protection contractor; Offshore foundation installation contractor; Subsea cable installation contractor; Environmental remediation contractor; Port and offshore-energy concession developer; Marine aggregates contractor; Dredging-fleet owner and capital investor. - 2026-08-14 — [Boskalis](https://imwo.org/companies/profile-boskalis-marine-contractor) — group: Contractors and equipment providers; type: Dredging, marine infrastructure and offshore-energy contractor; regions: Global, Europe, Asia Pacific, Middle East, Africa, Americas; roles: Capital and maintenance dredging contractor; Port, waterway and reclamation contractor; Coastal defence, riverbank and hydraulic-infrastructure contractor; Offshore heavy-transport and installation contractor; Subsea cable, rock-placement, survey and IRM contractor; Port towage and terminal-services provider through Smit Lamnalco; Emergency response and salvage provider through SMIT. - 2026-08-14 — [Van Oord](https://imwo.org/companies/profile-van-oord-marine-contractor) — group: Contractors and equipment providers; type: Dredging, marine infrastructure and offshore-energy contractor; regions: Global, Europe, Asia Pacific, Middle East, Africa, Americas; roles: Marine contractor; Dredging contractor; Reclamation contractor; Port and waterway contractor; Marine construction contractor; Coastal protection contractor; Offshore wind installation contractor; Subsea cable installation contractor; Subsea rock installation contractor; Landfall and nearshore EPC contractor; Specialist marine plant owner. - 2026-08-14 — [Royal IHC](https://imwo.org/companies/profile-royal-ihc-dredging-equipment) — group: Contractors and equipment providers; type: Marine equipment provider; regions: Global, Europe, Middle East, Africa, Asia Pacific, Americas; roles: Dredging vessel designer; Marine equipment manufacturer; Shipbuilder; Integrated control systems provider; Lifecycle service provider. - 2026-08-14 — [DP World](https://imwo.org/companies/profile-dp-world-port-operator) — group: Operators and concessionaires; type: Port, terminal, logistics and marine-services operator; regions: Global, Middle East, Africa, Europe, Asia Pacific, Americas; roles: Port operator; Terminal operator; Concessionaire; Infrastructure investor; Port developer; Economic-zone operator; Marine services operator; Feeder and shortsea operator; Offshore logistics provider; Project-cargo carrier; Logistics integrator. - 2026-08-14 — [PSA International](https://imwo.org/companies/profile-psa-international-port-operator) — group: Operators and concessionaires; type: Port and terminal operator; regions: Global, Asia Pacific, Europe, Middle East, Africa, Americas; roles: Port and terminal operator; Terminal developer and infrastructure investor; Concession and joint-venture participant; Terminal automation and systems integrator; Pilotage, towage and marine-services provider through PSA Marine; Rail, inland-terminal and supply-chain operator. - 2026-08-14 — [Moffatt & Nichol](https://imwo.org/companies/profile-moffatt-nichol-maritime-consultant) — group: Public delivery and advisory bodies; type: Port, coastal and marine infrastructure design and advisory firm; regions: Global, Americas, Europe, Middle East, Asia Pacific; roles: Port master planner and terminal operations modeller; Navigation-channel and dredging designer; Marine structural engineer for piers, wharves, quays and breakwaters; Coastal and hydrodynamic modeller; Dredged-material and sediment-management consultant; Environmental review and permitting consultant; Construction administration and inspection consultant; Freight and intermodal planner. - 2026-08-14 — [Penta-Ocean Construction](https://imwo.org/companies/profile-penta-ocean-marine-contractor) — group: Contractors and equipment providers; type: Marine civil and offshore construction contractor; regions: Asia Pacific, Middle East, Africa, Global; roles: Marine civil contractor; Dredging and reclamation contractor; Marine ground improvement contractor; Caisson and wharf contractor; Marine plant owner; Offshore wind marine construction contractor. - 2026-08-14 — [SUEZ](https://imwo.org/companies/profile-suez-water-infrastructure-developer-operator) — group: Contractors and equipment providers; type: Water infrastructure developer, contractor, and operator; regions: Global, Middle East, Asia Pacific, Europe, Africa, Americas; roles: Water infrastructure developer; Seawater reverse-osmosis designer and builder; Pretreatment and brine-management technology provider; Concession and project-company partner; Plant operator and maintenance provider. - 2026-08-14 — [Sharakat (Saudi Water Partnership Company)](https://imwo.org/companies/profile-saudi-water-partnership-company-sharakat) — group: Water and utility bodies; type: Public water PPP procurer and principal offtaker; regions: Middle East, Saudi Arabia; roles: Independent water and wastewater PPP procurer; Principal water buyer and offtake-agreement counterparty; Water-project demand, capacity and procurement planner; PPP contract manager and project-company counterparty; Desalination, treatment, transmission, storage and dam programme client; Land, fuel, electricity, feedstock and interconnection interface coordinator; Government approval, licence and permit coordination interface; Owner-side client for seawater intake and outfall obligations. - 2026-08-13 — [Philippines Department of Public Works and Highways (DPWH)](https://imwo.org/companies/profile-philippines-department-public-works-highways) — group: Public delivery and advisory bodies; type: National public-works and flood-control authority; Metro Manila Flood Management Project executing agency; regions: Asia Pacific, Philippines, Metro Manila, Pasay City; roles: National public-works engineering and construction authority; Major flood-control planning, design, construction and maintenance; UPMO-FCMC management of major flood-control programmes; Metro Manila Flood Management Project executing agency; Pumping-station and supporting-waterway package client; Civil-works procurement and contract administration; Environmental and social safeguards oversight; Inspection, closeout and owner-acceptance interface. - 2026-08-13 — [Senegal Ministry of Fisheries and Maritime Economy (MPEM)](https://imwo.org/companies/profile-senegal-ministry-fisheries-maritime-economy) — group: Public delivery and advisory bodies; type: National fisheries, maritime-economy and port-infrastructure policy authority; SENRM executing agency; regions: Africa, Senegal, Atlantic coast, Casamance; roles: National fisheries and aquaculture policy authority; Maritime transport and port-infrastructure policy authority; SENRM executing agency for the fisheries component; Fishing-quay and fisheries-value-chain infrastructure client; SENRM project management unit oversight; World Bank procurement and implementation counterpart; Environmental, social and resettlement coordination through SENRM; Cap Skirring owner-side launch, delivery and acceptance interface. - 2026-08-12 — [Kenya State Department for the Blue Economy and Fisheries (KEMFSED)](https://imwo.org/companies/profile-kenya-state-department-blue-economy-fisheries) — group: Public delivery and advisory bodies; type: National fisheries-infrastructure owner and World Bank project implementing agency; regions: Africa, Kenya, Mombasa County, Kilifi County, Kwale County, Tana River County, Lamu County; roles: National fisheries and blue-economy policy authority; KEMFSED implementing agency and borrower-side programme lead; Fish landing-site and fisheries-infrastructure contracting client; National Project Coordination Unit oversight; Procurement, financial management and safeguards administration; Coordination with five coastal county implementation units; Fisheries-management and coastal-livelihood investment delivery; World Bank implementation reporting and completion preparation. - 2026-08-12 — [Júcar River Basin Authority (CHJ)](https://imwo.org/companies/profile-jucar-river-basin-authority) — group: Water and utility bodies; type: Statutory river-basin authority and hydraulic-infrastructure delivery body; regions: Europe, Spain, Júcar River Basin District, Valencia and eastern Spain; roles: Statutory river-basin authority; Public hydraulic-domain administration and control; Hydrological planning, permits and concessions; Hydraulic-infrastructure design, construction and operation; Flood-risk, drought and emergency-works delivery; Dams, channels, river works and water-supply infrastructure; Hydrological monitoring through the SAIH network; Torrent wastewater and post-DANA flood-resilience owner-side interface. - 2026-08-12 — [Port of Los Angeles / Los Angeles Harbor Department](https://imwo.org/companies/profile-port-of-los-angeles-harbor-department) — group: Port and waterway authorities; type: City port department, landlord port, marine-infrastructure owner and public works client; regions: Americas, United States, California, San Pedro Bay, San Pedro, Wilmington, Terminal Island; roles: City port department governed by the Los Angeles Board of Harbor Commissioners; Landlord port and Harbor District property manager; Port infrastructure owner and capital-programme sponsor; Marine civil, dredging, electrical and terminal-improvement procurement client; Engineering, construction inspection, survey and materials-testing authority; Harbor facility maintenance, repair and reconstruction owner; Long-range Port Master Plan and California Coastal Act planning interface; Navigation, maritime commerce, fisheries and public-waterfront trustee. - 2026-08-12 — [Dragage Ocean DS inc.](https://imwo.org/companies/profile-dragage-ocean-ds) — group: Contractors and equipment providers; type: Dredging contractor and marine-plant operator; regions: Canada, Quebec, Great Lakes, Caribbean, Central America; roles: Maintenance dredging contractor; Capital dredging and port-extension contractor; Access-channel, berth and turning-basin deepening; Mechanical and suction dredging; Environmental dredging and capping; Beach nourishment and land reclamation; Coastal-defence and riverbank-protection works; Dredging-plant, scow, barge and workboat operator. - 2026-08-11 — [Samoa Ports Authority](https://imwo.org/companies/profile-samoa-ports-authority) — group: Port and waterway authorities; type: Statutory national port authority and port operator; regions: Pacific Islands, Samoa, Apia, South Pacific; roles: National port authority operating under the Ports Authority Act 1998 and amendments; Apia International Port operator and infrastructure custodian; Commercial and domestic port-services provider; Port operations, maritime safety, security and service-quality authority; Climate-resilient port infrastructure owner-side stakeholder; ESSSAP environmental and social monitoring publisher; Terminal, wharf, breakwater and navigation-interface counterparty; Green-port programme owner-side participant. - 2026-08-10 — [Bullo Limited](https://imwo.org/companies/profile-bullo-limited) — group: Contractors and equipment providers; type: UK dredging, marine civil engineering, workboat and specialist-access contractor; regions: United Kingdom, England, Bristol Floating Harbour, Harbours, docks, rivers, estuaries and inland waterways, Europe; roles: Maintenance and targeted dredging; Water-injection, plough, cutter-suction and mechanical dredging; Survey-led desilting and licensed sediment disposal coordination; Quay, pontoon, jetty, mooring and fender works; Tug, workboat, hopper-barge and modular-pontoon operations; Restricted-access harbour and marina support; Gate, stop-log, sluice and culvert clearance; Bank stabilisation, debris clearance and marine civil support; Bristol Floating Harbour maintenance-dredging prime supplier. - 2026-08-10 — [Australian Government Department of Infrastructure](https://imwo.org/companies/profile-australian-infrastructure-department-norfolk) — group: Public delivery and advisory bodies; type: Federal territories infrastructure administrator and Norfolk Island port-project client; regions: Oceania, Australia, Norfolk Island, Kingston, Cascade Bay; roles: Australian external-territories infrastructure and service administrator; Kingston Pier Channel Construction Project client and delivery body; Cascade Pier emergency-remediation and apron-upgrade client; Rock-revetment and dredging-and-repair package procurement authority; Navigation-channel, turning-area and pier-strengthening owner interface; Norfolk Island port-strategy and future-investment coordinator; Heritage, archaeology and community-engagement project proponent; Water-quality monitoring and marine-environment control interface; Cascade Quarry dredged-material reuse and logistics coordinator; Owner-side survey, navigation-aid commissioning and access-release interface. - 2026-08-09 — [Clement Marine Constructions](https://imwo.org/companies/profile-clement-marine-constructions) — group: Contractors and equipment providers; type: Sydney marine contractor, wharf builder and marine-plant operator; regions: Sydney Harbour, New South Wales, Australia's east coast, Asia Pacific; roles: Wharf, ferry-landing and boardwalk construction and repair; Driven, bored, vibrated and sheet piling; Pontoon design, manufacture, fit-out and installation; Marina and boat-ramp construction; Small-scale dredging and marine excavation; Waterfront maintenance, demolition and civil works; Design-and-construct, construct-only and early-contractor-involvement delivery; Barge, workboat, crane, piling-rig and excavator operation. - 2026-08-09 — [Oceanetics, Inc.](https://imwo.org/companies/profile-oceanetics-marine-mooring-contractor) — group: Contractors and equipment providers; type: U.S. ocean-engineering, mooring-system and marine-fabrication contractor; regions: Americas, United States; roles: Fleet and specialized mooring-system contractor; Mooring logistics, installation, testing, analysis and repair; Ocean engineering and marine-structure design; Offshore critical-lift and cable-route planning; Buoy, fender, mooring-line and rigging fabrication; Marine field support and harsh-environment prototyping; Wharf V5 two-buoy installation prime contractor. - 2026-08-09 — [Carmarthenshire County Council](https://imwo.org/companies/profile-carmarthenshire-county-council) — group: Port and waterway authorities; type: Public-sector harbour owner and statutory harbour authority; regions: Carmarthenshire, Wales, United Kingdom; roles: Burry Port Harbour owner; Statutory harbour authority; Emergency dredging contracting authority; Maintenance-dredging consultancy buyer; Replacement pontoon-float supply buyer; Harbour capital-programme sponsor; Marina and rolling-dredging masterplan authority. - 2026-08-09 — [Archimedes Marine Engineering and Contracting LLC](https://imwo.org/companies/profile-archimedes-marine-engineering-contracting-oman) — group: Contractors and equipment providers; type: Oman marine engineering and contracting company; regions: Middle East, Oman, Arabian Sea, Sea of Oman, Musandam, Masirah, Salalah; roles: Fishery-harbour design and construction; Commercial-port and berth infrastructure; Dredging and reclamation; Breakwaters, quay walls, revetments and coastal protection; Floating pontoon and berthing-system delivery; Seawater intake, outfall and offshore-pipeline installation; Raysut Fishery Harbour contract-side delivery entity; Masirah multipurpose fishing-port joint-venture contractor. - 2026-08-09 — [Oman Ministry of Agriculture, Fisheries and Water Resources](https://imwo.org/companies/profile-oman-ministry-agriculture-fisheries-water-resources) — group: Public delivery and advisory bodies; type: National fisheries-port owner, sector regulator and public delivery body; regions: Middle East, Oman, Sea of Oman, Arabian Sea, Musandam, Masirah, Dhofar, Salalah; roles: National fishing-port owner and developer; Fishing-port construction client and contract signatory; Fishing-port and landing-site management authority; Liwa harbour construction, maintenance-dredging and PPP procurement owner; Fisheries infrastructure policy and planning body; Fisheries resource, landing and market regulator; Port-services and private-investment interface; Owner-side progress and operating-release publisher. - 2026-08-08 — [SPIE CityNetworks](https://imwo.org/companies/profile-spie-citynetworks) — group: Contractors and equipment providers; type: France energy, digital-network, transport and mobility infrastructure contractor; regions: France, Europe; roles: Consortium leadership for commercial-port electrical works; Shore-side electrical network integration; Transport and mobility infrastructure; Energy and digital-network installation; Electrical operation and maintenance; Testing and commissioning coordination where contractually assigned. - 2026-08-08 — [Shimmick Construction Company, Inc.](https://imwo.org/companies/profile-shimmick-construction-company) — group: Contractors and equipment providers; type: United States water, marine, electrical and critical-infrastructure contractor; regions: California, Pacific Northwest, Western United States, Selected nationwide United States infrastructure markets; roles: Prime delivery of port and wharf rehabilitation; Alternative Maritime Power and ship-to-shore electrical systems; Marine piling, fendering and mooring infrastructure; Concrete wharf repairs and structural modifications; Water, sewer and site-utility integration; Electrical commissioning through wholly owned Axia Electric; Civil access, safety and security improvements. - 2026-08-08 — [Global Trade Sales / GTS Australia (Gambetta Holdings Pty Ltd)](https://imwo.org/companies/profile-gts-australia-global-trade-sales) — group: Contractors and equipment providers; type: Western Australian floating-jetty and marine-structures contractor; regions: Western Australia, Perth metropolitan area, Gascoyne and Mid West maritime facilities; roles: Design and construction of floating boat-pen systems; Jetty demolition, replacement and reconfiguration; Marine piling and pontoon installation; Power, water, firefighting and CCTV services integration; Universal-access pontoons and dinghy moorings; Floating mooring pens and marina infrastructure. - 2026-08-08 — [AICI-Archirodon JV LLC](https://imwo.org/companies/profile-aici-archirodon-jv) — group: Contractors and equipment providers; type: International design-build and marine infrastructure joint venture; regions: Middle East, Saudi Arabia, Africa, International U.S.-funded markets; roles: Prime design-build contractor for King Abdulaziz Naval Base MMSC IOC facilities; Wharf, pier and naval-base infrastructure delivery; Maintenance, fueling, utility and fleet-support facilities; Dredging and harbour-preparation delivery through a separate predecessor contract; Marine infrastructure and industrial civil construction; International U.S. government contracting and Foreign Military Sales execution. - 2026-08-08 — [NASS Contracting Co. W.L.L.](https://imwo.org/companies/profile-nass-contracting) — group: Contractors and equipment providers; type: Building, civil and marine construction contractor; regions: Middle East, Bahrain, Saudi Arabia, United Arab Emirates, Arabian Gulf; roles: Award recipient for Sitra Wharf Berths 5 and 6 enhancement; Jetty and quay-wall construction contractor; Dredging and land-reclamation contractor; Shore-protection and revetment contractor; Industrial civil and pipeline contractor; Marine infrastructure main contractor and joint-venture participant. - 2026-08-08 — [Bapco Refining](https://imwo.org/companies/profile-bapco-refining) — group: Operators and concessionaires; type: Refinery operator and liquid-cargo terminal owner; regions: Middle East, Bahrain, Arabian Gulf; roles: Sitra Port Terminal and Sitra Wharf owner-operator; Client and procurement authority for Berths 5 and 6 enhancement; Liquid-cargo export-terminal operator; Marine, structural, mechanical and product-system interface owner; Testing, return-to-service and acceptance authority. - 2026-08-08 — [SeaWorks Co.](https://imwo.org/companies/profile-seaworks-company) — group: Contractors and equipment providers; type: Marine construction, dredging and offshore-services contractor; regions: Middle East, Oman, Qatar, Gulf; roles: Liwa Fishery Harbour dredging and reclamation contractor in 2015; Capital and maintenance dredging contractor; Reclamation and breakwater contractor; Quay-wall and jetty contractor; Marine survey and diving provider; Marine plant and support-vessel operator. - 2026-08-08 — [Galfar Engineering and Contracting](https://imwo.org/companies/profile-galfar-engineering-contracting) — group: Contractors and equipment providers; type: Oman engineering, construction and infrastructure contractor; regions: Middle East, Oman, Gulf; roles: Liwa (Nabur) Fishery Harbour reported prime contractor; Fishing-port and marine-infrastructure contractor; Client for Masirah Marine's Liwa quay-wall block installation package; Large multidisciplinary civil, infrastructure and industrial contractor. - 2026-08-08 — [Masirah Island International](https://imwo.org/companies/profile-masirah-island-international) — group: Contractors and equipment providers; type: Oman marine construction, dredging and offshore-support contractor; regions: Middle East, Oman, Musandam, Arabian Sea, Sea of Oman; roles: Bukha Fishery Harbour maintenance, rehabilitation and dredging contractor; Fishing-port and harbour marine contractor; Dredging and reclamation contractor; Jetty, quay and breakwater contractor; Subsea pipeline installation provider; Commercial diving, hydrographic survey and ROV provider; Marine logistics and vessel-chartering provider. - 2026-08-08 — [Zutphen Contractors](https://imwo.org/companies/profile-zutphen-contractors) — group: Contractors and equipment providers; type: Nova Scotian heavy civil and marine construction contractor; regions: Americas; roles: Heavy civil and marine construction contractor; Wharf construction contractor; Pile-driving contractor; Breakwater development contractor; Dredging contractor; Canadian Small Craft Harbours prime contractor. - 2026-08-08 — [Jackson Civil Engineering](https://imwo.org/companies/profile-jackson-civil-engineering) — group: Contractors and equipment providers; type: Civil engineering and flood/coastal defence contractor; regions: Europe; roles: Principal coastal-defence contractor; Flood-defence contractor; Rock-armour placement contractor; Tidal bank-stabilisation contractor; Sheet-piling and cofferdam contractor; NEC early-contractor-involvement partner. - 2026-08-08 — [FIPAAS (formerly FIPAG)](https://imwo.org/companies/profile-fipaas-mozambique-water-assets) — group: Water and utility bodies; type: Mozambican national public water-and-sanitation investment and asset-development fund; regions: Africa, Mozambique, Nacala, Nampula Province, Maputo, National urban water and sanitation systems; roles: National public water and sanitation investment fund; Water-supply and sanitation asset-development programme manager; Climate-resilient infrastructure investment mobiliser; FIPAG institutional successor under Decree 68/2025; Owner-side project and procurement counterparty; Urban water intake, treatment, transmission and pumping asset interface; Government and development-finance coordination body; Public infrastructure development-programme sponsor. - 2026-08-08 — [Masirah Marine](https://imwo.org/companies/profile-masirah-marine) — group: Contractors and equipment providers; type: Oman marine construction, diving and offshore-support contractor; regions: Middle East, Oman, Gulf; roles: Liwa Fishery Harbour quay-wall block installation contractor for Galfar in 2017; Reported high-probability installation-contractor lead for ACME Duqm CBM; Buoy and SPM installation, inspection and repair; Subsea-anchor, chain and mooring-system work; Marine pipeline installation and maintenance; Commercial diving and subsea construction support; Hydrographic, geophysical and ROV survey; Dredging, piling and harbour construction; In-house crane-barge and marine-plant operator; Published twin-screw tug operator; no public ASD-tug or anchor-handling vessel listing. - 2026-08-07 — [Tanzania Ports Authority](https://imwo.org/companies/profile-tanzania-ports-authority) — group: Port and waterway authorities; type: Tanzanian statutory port authority, landlord, developer and port operator; regions: Africa, Tanzania, East Africa, Indian Ocean, Lake Victoria, Lake Tanganyika, Lake Nyasa; roles: National statutory port authority; Port landlord, manager and developer; Marine-infrastructure owner-side client; Dar es Salaam Maritime Gateway Project implementing agency; Port and terminal operator for selected facilities; Navigation-access and port-services coordinator; Capital-programme and procurement sponsor; Port safety, security and environmental-management interface. - 2026-08-07 — [Terminal del Golfo (TDG)](https://imwo.org/companies/profile-terminal-del-golfo) — group: Operators and concessionaires; type: Italian private multipurpose port-terminal concessionaire and marine-infrastructure buyer; regions: Europe, Italy, Ligurian Sea, Port of La Spezia, Mediterranean; roles: Private terminal concessionaire and operator; Container and multipurpose cargo terminal operator; Quay-extension and terminal-expansion buyer; Live-terminal interface owner; Berth, yard and cargo-handling asset operator; Ro-Ro, reefer, project and general-cargo handler; Rail, road and maritime intermodal interface; Owner-side procurement and contract counterparty. - 2026-08-07 — [Dohwa Engineering Co., Ltd.](https://imwo.org/companies/profile-dohwa-engineering) — group: Public delivery and advisory bodies; type: South Korean multidisciplinary engineering, design and project-management consultancy; regions: Asia Pacific, South Korea, South Asia, Sri Lanka, Global; roles: Confirmed WCT-II Western Breakwater detailed-design lead partner; Port and harbour planning and design consultant; Coastal survey and measurement provider; Feasibility, supervision and commissioning consultant where separately awarded; Project-management and operating-support capability context only. - 2026-08-07 — [Sri Lanka Ports Authority](https://imwo.org/companies/profile-sri-lanka-ports-authority) — group: Port and waterway authorities; type: National port authority, landlord, operator and common-service provider; regions: Asia Pacific, Sri Lanka, Colombo, Galle, Trincomalee, Kankesanthurai; roles: Port authority and landlord; Common marine-service and infrastructure provider; Public terminal operator; Client for WCT-II Western Breakwater detailed design; PPP and terminal-development interface; Future construction and financing gatekeeper where separately evidenced. - 2026-08-07 — [Entreprise Marc SA](https://imwo.org/companies/profile-entreprise-marc-sa) — group: Contractors and equipment providers; type: French civil, marine, river and dredging contractor; regions: Europe, France, Brittany, Normandy; roles: Confirmed Granville Herel breakwater-repair titulaire and works-group member; Confirmed Normandy framework lot 3 stationary-suction dredging awardee; Port and harbour civil-works contractor; Marine and river structure contractor; Maritime earthworks and dredging contractor; Current project-specific workshare, plant allocation and lower tiers only where separately published. - 2026-08-07 — [C. O. Williams Construction Limited](https://imwo.org/companies/profile-c-o-williams-construction) — group: Contractors and equipment providers; type: Barbadian civil, marine and coastal contractor; regions: Americas, Caribbean, Barbados, Eastern Caribbean, St. Lucia; roles: Confirmed Bridgetown Fishing Harbour breakwater works contractor; Confirmed Bridgetown Port Sugar Berth seawall and revetment works contractor; Marine civil and coastal-reclamation contractor; Breakwater, dolos and boulder-containment experience; Marina, fishing-harbour and port-infrastructure experience; Earthmoving, quarry-material, asphalt and heavy-equipment capability; Current project-specific plant, workshare and lower-tier appointments not published. - 2026-08-07 — [Spie batignolles ETPO](https://imwo.org/companies/profile-etpo-marine-contractor) — group: Contractors and equipment providers; type: French marine, river, underwater and civil-engineering contractor; regions: Europe, France, French overseas territories, International; roles: Marine main contractor; Port and terminal civil-works contractor; River and underwater-works contractor; Quay, jetty and marine-structure contractor; Heavy marine demolition and lifting coordinator; Caisson, foundation and reinforced-concrete contractor; Marine plant and pontoon operator. - 2026-08-06 — [B.V. Aannemingsbedrijf De Klerk](https://imwo.org/companies/profile-aannemingsbedrijf-de-klerk) — group: Contractors and equipment providers; type: Dutch structural hydraulic, steel and mechanical works contractor; regions: Europe, Netherlands, Rotterdam, Northwest Europe; roles: Confirmed member of the Yukonhaven Jetty 4 supplier combination; Named applicant in project-specific Rijkswaterstaat early-works notifications; Structural hydraulic and marine civil construction capability; Dredging, coastal and shore-work capability; Marine piling, lifting and recovery capability; Steel engineering, fabrication and installation capability; Project-specific workshare and deployed plant not disclosed. - 2026-08-06 — [Hakkers Waterbouw](https://imwo.org/companies/profile-hakkers-waterbouw) — group: Contractors and equipment providers; type: Dutch hydraulic engineering, foundation and steel construction contractor; regions: Europe, Netherlands, Rotterdam, Northwest Europe; roles: Confirmed member of the Yukonhaven Jetty 4 supplier combination; Hydraulic and marine structural construction; Combi-wall, quay wall, jetty and mooring-system delivery capability; Foundation engineering and marine piling capability; Steel fabrication and installation capability; Dredging, coastal and shore-work capability; Project-specific workshare and deployed plant not disclosed. - 2026-08-06 — [MVG Colombia](https://imwo.org/companies/profile-mvg-colombia) — group: Contractors and equipment providers; type: Colombian company and 10% Tumaco deepening-consortium member; regions: Americas, Colombia, Magdalena, Tumaco; roles: 10% legal participant in Consorcio Puerto Tumaco II; Consortium-level responsibility for contract GN2862-2026; Project-specific marine or field package not disclosed; Self-performance, plant and lower-tier responsibilities not evidenced. - 2026-08-06 — [JTEC SAS](https://imwo.org/companies/profile-jtec-ingenieria-consultoria) — group: Contractors and equipment providers; type: Colombian company and 15% Tumaco deepening-consortium member; regions: Americas, Colombia, Magdalena, Tumaco; roles: 15% legal participant in Consorcio Puerto Tumaco II; Consortium-level responsibility for contract GN2862-2026; Project-specific engineering or field package not disclosed; Self-performance, plant and lower-tier responsibilities not evidenced. - 2026-08-06 — [Proyectos y Desarrollos de los Andes SAS](https://imwo.org/companies/profile-proyectos-y-desarrollos-de-los-andes) — group: Contractors and equipment providers; type: Colombian company and 75% leader of the Tumaco deepening consortium; regions: Americas, Colombia, Bogota, Tumaco; roles: 75% legal participant in Consorcio Puerto Tumaco II; Registered leader of SECOP II provider group 736836628; Consortium-level responsibility for contract GN2862-2026; Project-specific dredging and technical package not disclosed; Self-performance, plant and lower-tier responsibilities not evidenced. - 2026-08-06 — [CFD Ingenieria SAS](https://imwo.org/companies/profile-cfd-ingenieria) — group: Contractors and equipment providers; type: Colombian engineering company and 10% Barranquilla dredging-consortium member; regions: Americas, Colombia, Barranquilla; roles: 10% legal participant in Consorcio Dragado Puerto de Bquilla 2024-2025; Consortium-level responsibility for contract 0-525-2024; Project-specific engineering or field package not disclosed; Self-performance and lower-tier responsibilities not evidenced. - 2026-08-06 — [Panamerican Dredging](https://imwo.org/companies/profile-panamerican-dredging) — group: Contractors and equipment providers; type: Colombian dredging and marine-works contractor; 20% Barranquilla consortium member; regions: Americas, Colombia, Caribbean coast, Barranquilla; roles: 20% legal participant in Consorcio Dragado Puerto de Bquilla 2024-2025; Dredging and hydraulic works capability; Bathymetric and topographic surveys; Maritime and fluvial construction; Quay construction and repair; Outfalls, marine plant and waterborne transport; Contract-specific self-performance not disclosed. - 2026-08-06 — [Caribbean Region Water Conservancy Engineering SAS](https://imwo.org/companies/profile-caribbean-region-water-conservancy-engineering) — group: Contractors and equipment providers; type: Colombian special-purpose marine works company and 70% consortium leader; regions: Americas, Colombia, Barranquilla; roles: 70% legal participant in Consorcio Dragado Puerto de Bquilla 2024-2025; Registered leader of SECOP II provider group 728030099; Consortium-level responsibility for contract 0-525-2024; Maintenance-dredging contract coordination at group level; Member work allocation and self-performance not disclosed. - 2026-08-06 — [Landco Construction Ltd.](https://imwo.org/companies/profile-landco-construction) — group: Contractors and equipment providers; type: New Brunswick civil contractor named on federal fishing-harbour works; regions: Americas, Canada, Atlantic Canada, New Brunswick; roles: Petit-Cap contract CW2335551 prime contractor; Berlin-wall marginal-wharf package responsibility; Timber-crib demolition and harbour-dredging interface coordination; Cofferdam and environmental-control delivery responsibility; Electrical-service reinstatement integration; Historical New Brunswick federal wharf-contract holder; Small Craft Harbours civil construction delivery. - 2026-08-06 — [Bulldog Contracting Ltd.](https://imwo.org/companies/profile-bulldog-contracting) — group: Contractors and equipment providers; type: Newfoundland and Labrador marine and civil construction contractor; regions: Americas, Canada, Atlantic Canada, Newfoundland and Labrador; roles: Harbour Grace contract F6140-221449/001/PWD prime contractor; Treated-timber crib wharf and finger-pier package responsibility; Harbour dredging and hard-bottom scribing interface coordination; Reinforced-concrete deck and marine-fitting delivery responsibility; Water, electrical and site-service integration; Burgeo floating-dock federal contract holder; Small Craft Harbours marine construction delivery. - 2026-08-06 — [Brian MacGillivary Construction](https://imwo.org/companies/profile-brian-macgillivary-construction) — group: Contractors and equipment providers; type: Nova Scotia construction prime named on a small-craft-harbour marine package; regions: Americas, Canada, Atlantic Canada, Nova Scotia; roles: Pugwash contract 4500057429 prime contractor; Integrated floating-dock and gangway package responsibility; Harbour dredging and containment interface coordination; Concrete retaining-wall delivery responsibility; Armour-stone and core-stone berm reinstatement; Marine access, survey and lower-tier coordination; Small Craft Harbours construction contract delivery. - 2026-08-06 — [West Bengal Transport Infrastructure Development Corporation Limited](https://imwo.org/companies/profile-west-bengal-transport-infrastructure-development-corporation) — group: Public delivery and advisory bodies; type: State-owned transport-infrastructure engineering and delivery corporation; regions: West Bengal, Hooghly River, National Waterway 1, India, Asia Pacific; roles: Public client and implementing agency for jetties and inland-waterway terminals; Engineering planning, design and technical supervision; Works procurement and contract administration; Floating pontoon and gangway infrastructure delivery; Passenger-facility and terminal integration; Navigation-corridor and port-infrastructure project delivery; World Bank project implementation and reporting; Interface coordination with the Inland Water Transport Directorate and ferry operators. - 2026-08-06 — [Pacific Marine Group](https://imwo.org/companies/profile-pacific-marine-group) — group: Contractors and equipment providers; type: North Queensland marine contractor, commercial-diving provider and vessel operator; regions: Queensland, Northern Australia, Papua New Guinea, Pacific, Asia Pacific; roles: Wharf, jetty and piled marine-structure contractor; Fender-system and fender-pile replacement; Marine construction and demolition; Commercial diving and underwater maintenance; Dredging, pile driving and marine-plant operation; In-house steel fabrication, coating and project assembly; Tug, barge, crane and vessel charter; Mooring installation and project logistics. - 2026-08-06 — [Great Lakes Dredge & Dock](https://imwo.org/companies/profile-great-lakes-dredge-dock) — group: Contractors and equipment providers; type: Dredging, coastal protection and marine infrastructure contractor; regions: Americas, United States, Atlantic Coast, Gulf Coast, Pacific Coast, Great Lakes, International markets; roles: Capital channel-deepening contractor; Maintenance-dredging contractor; Trailing suction hopper dredge operator; Cutter suction and mechanical dredge operator; Beach nourishment and coastal-protection contractor; Dredged-material placement and habitat-restoration contractor; Brazos Island Harbor FY24 maintenance-dredging prime contractor; Sabine-Neches Contract 6 prime contractor. - 2026-08-06 — [Anthony D. Bates Partnership](https://imwo.org/companies/profile-anthony-d-bates-partnership) — group: Public delivery and advisory bodies; type: Construction consultancy supplier; regions: Wales, United Kingdom, Europe; roles: Confirmed Burry Port dredging consultancy supplier; Mechanical dredging advisory scope; Water-injection dredging advisory scope; 5-10 year harbour-maintenance strategy scope; SME construction consultancy supplier. - 2026-08-06 — [Kaymac Marine & Civil Engineering](https://imwo.org/companies/profile-kaymac-marine-civil-engineering) — group: Contractors and equipment providers; type: Welsh marine and civil works contractor; regions: Wales, United Kingdom, Europe; roles: Confirmed Burry Port emergency dredging works contractor; Dredging and pumping works supplier under CPV 45252124; South West Wales regional civil engineering framework contractor; SME supplier in official procurement records. - 2026-08-06 — [Australian Marine & Civil](https://imwo.org/companies/profile-australian-marine-civil) — group: Contractors and equipment providers; type: Marine and civil contractor; regions: Queensland, Australia, Asia Pacific; roles: Marine contractor; Boat-ramp and walkway contractor; Breakwater and revetment contractor; Dredging and marine-plant contractor; Civil works contractor. - 2026-08-06 — [ETEP](https://imwo.org/companies/profile-etep-tunisia-marine-contractor) — group: Contractors and equipment providers; type: Civil and marine contractor; regions: Tunisia, North Africa, Africa; roles: Marine contractor; Fishing-port contractor; Breakwater contractor; Quay and reclamation contractor; Civil works contractor. - 2026-08-06 — [Océlian](https://imwo.org/companies/profile-ocelian-marine-contractor) — group: Contractors and equipment providers; type: French marine, river, port and underwater-works contractor within VINCI Construction; regions: Europe, France, Corsica, Mediterranean France; roles: Marine and river main contractor; Port and coastal-infrastructure contractor; Breakwater, quay and jetty contractor; Underwater-works and diving contractor; Piling, drilling, dredging and structural-strengthening contractor; Marine plant and floating-unit operator; Terrestrial and underwater survey and geotechnical delivery. - 2026-08-06 — [Tonga Ministry of Infrastructure](https://imwo.org/companies/profile-tonga-ministry-infrastructure) — group: Public delivery and advisory bodies; type: Government transport-infrastructure ministry and maritime-works implementing agency; regions: Asia Pacific, Tonga, Global islands; roles: Government implementing agency for climate-resilient maritime infrastructure; Marine and Ports Division policy and delivery lead; Nafanua Port integrated works procuring authority; MOI-WK2-13 contract-administration and delivery interface; Breakwater, small-boat berth and passenger-terminal client interface; Construction-supervision and environmental-management procuring agency; Queen Salote wharf government-client and programme interface. - 2026-08-06 — [Port of Rotterdam Authority](https://imwo.org/companies/profile-port-of-rotterdam-authority) — group: Port and waterway authorities; type: Port authority, infrastructure owner and landlord; regions: Europe, Netherlands, Rotterdam-Rijnmond; roles: Port infrastructure owner and developer; Marine and civil works client; Quay wall and waterway asset manager; Port landlord and concession counterparty; Dredging and berth-maintenance coordinator; Nautical-access programme partner; Public project and work-notice publisher. - 2026-08-06 — [Sabine-Neches Navigation District](https://imwo.org/companies/profile-sabine-neches-navigation-district) — group: Port and waterway authorities; type: Local non-federal navigation sponsor and waterway steward; regions: Americas, United States, Texas Gulf Coast; roles: Local non-federal navigation sponsor; Waterway steward; Marine works client; Dredging-package contracting authority; Federal cost-share partner; Navigation and anchorage capacity programme sponsor. - 2026-08-05 — [Suffolk Dredging LLP](https://imwo.org/companies/profile-suffolk-dredging-llp) — group: Contractors and equipment providers; type: Harwich Haven-controlled dredging LLP; regions: Europe, United Kingdom; roles: Named supplier on pending maintenance-dredging award; HHA-controlled affiliated undertaking; Tiamat commercialisation and delivery vehicle; Early contractor involvement participant; Beneficial-use dredging delivery entity. - 2026-08-05 — [Harwich Haven Authority](https://imwo.org/companies/profile-harwich-haven-authority) — group: Port and waterway authorities; type: Trust port and statutory harbour authority; regions: Europe, United Kingdom; roles: Trust port and statutory harbour authority; Harbour and approach-channel conservancy authority; Maintenance-dredging client; Hydrographic survey and navigation-safety authority; Tiamat technology owner and innovation sponsor; Beneficial-use and coastal-resilience programme sponsor. - 2026-08-05 — [Kerr Limited](https://imwo.org/companies/profile-kerr-limited-marine-contractor) — group: Contractors and equipment providers; type: Atlantic Canada heavy-civil and marine contractor; regions: Americas, Canada, Atlantic Canada, Nova Scotia, Canadian North; roles: Heavy civil and marine prime contractor; Wharf and pier construction; Breakwater and shoreline-protection works; Heavy timber and timber-crib structures; Deep foundations and piling; Concrete and structural rehabilitation; Remote-site marine logistics; Centreville wharves 404-406 reconstruction prime. - 2026-08-05 — [Sorensen Civil Engineering](https://imwo.org/companies/profile-sorensen-civil-marine-contractor) — group: Contractors and equipment providers; type: Irish civil and marine engineering contractor delivering harbour, piling, dredging, quay, jetty and coastal works; regions: Europe, Ireland, United Kingdom; roles: Marine main contractor; Harbour and quay contractor; Marine piling and combi-wall contractor; Dredging and dredged-material manager; Jetty, pier and slipway contractor; Breakwater and coastal contractor; Marine utilities and shore-interface contractor; Design-build and traditional works contractor. - 2026-08-05 — [Dutch Dredging](https://imwo.org/companies/profile-dutch-dredging-maintenance-contractor) — group: Contractors and equipment providers; type: Dredging contractor; regions: Europe, Africa, Americas, Asia Pacific; roles: Dredging contractor; Maintenance dredging contractor; Trailing-suction hopper dredger operator; Water-injection dredging contractor; Marine plant owner. - 2026-08-04 — [Chunnel Group](https://imwo.org/companies/profile-chunnel-coastal-contractor) — group: Contractors and equipment providers; type: Coastal earthworks and plant contractor; regions: Europe; roles: Beach-management contractor; Coastal earthworks contractor; Beach replenishment contractor; Rock groyne and revetment contractor; Operated plant provider; Heavy-haulage provider. - 2026-08-04 — [Ports of Jersey](https://imwo.org/companies/profile-ports-of-jersey) — group: Infrastructure owners and developers; type: Port, airport and marine-infrastructure owner; regions: Europe, Jersey; roles: Port owner and operator; Marine-infrastructure client; Harbour Master Plan sponsor; Harbour authority; Marine services operator. - 2026-08-04 — [Abu Sultan Enterprises LLC](https://imwo.org/companies/profile-abu-sultan-enterprises-oman) — group: Infrastructure owners and developers; type: Oman diversified services and civil-contracting company; Dhalkut framework developer; regions: Middle East, Oman, Dhofar; roles: Dhalkut Port three-year framework developer; Intended port manager and operator subject to handover evidence; Financial and commercial model preparation; Future port-development planning; Maintenance and simple operating activities contemplated by the framework; Civil contracting and equipment-rental capability stated by the company; Waste-management and loading-unloading capability stated by the company. - 2026-08-04 — [Gulf Testing Solutions Enterprises LLC](https://imwo.org/companies/profile-gulf-testing-solutions-enterprises) — group: Contractors and equipment providers; type: Oman materials-testing, geotechnical, survey and inspection specialist; regions: Middle East, Oman, Muscat, Sohar, Duqm, Salalah; roles: Construction-material testing for marine and port works; Soil, aggregate, concrete, asphalt, steel and water testing; Geotechnical and geophysical investigation; Bathymetric, land and drone survey services; On-site and project-based laboratory services; Inspection, structural assessment and calibration; Raysut Fishery Harbour testing provider; ACME Duqm marine-investigation provider. - 2026-08-04 — [Straatman Mooring Systems](https://imwo.org/companies/profile-straatman-mooring-systems) — group: Contractors and equipment providers; type: Dutch mooring-control, quick-release and marine equipment supplier; regions: Global, Europe, Netherlands, Middle East, Oman; roles: Quick-release mooring and towing-hook manufacturer; Buoy control and hydraulic-release system supplier; Mooring-load monitoring and berthing-aid supplier; Autonomous offshore solar-power and navigation-aid integrator; Telemetry, communications and subsea-valve control supplier; Bluewater Oman four-buoy control-package supplier; Factory testing, pre-commissioning and delivery support provider. - 2026-08-04 — [Bluewater Energy Services](https://imwo.org/companies/profile-bluewater-energy-services) — group: Contractors and equipment providers; type: Dutch offshore mooring and transfer-system contractor and equipment supplier; regions: Global, Europe, Netherlands, Middle East, Oman; roles: Offshore mooring and transfer-system designer; CBM, CALM, turret and tower-system contractor; Floating production and storage-system supplier and operator; Subsea mooring, flowline and transfer-interface engineering provider; ACME Duqm green-ammonia CBM system contractor; Straatman control-package customer and integration counterparty; Marine-system delivery and after-sales support provider. - 2026-08-03 — [Great Lakes Dock & Materials, LLC](https://imwo.org/companies/profile-great-lakes-dock-materials) — group: Contractors and equipment providers; type: U.S. Great Lakes marine construction, dredging and breakwater contractor; regions: Americas, United States, Great Lakes, Michigan, New York; roles: Marine construction contractor; Stone breakwater and pier contractor; Mechanical and hydraulic dredging contractor; Water-intake and subaqueous-pipeline installer; Pile-driving and marina works contractor; Towing, diving and salvage provider; Hydrographic survey provider; Dunkirk breakwater phase-one and phase-two delivery-order contractor. - 2026-08-03 — [Underwater Services Company Limited](https://imwo.org/companies/profile-underwater-services-company-limited) — group: Contractors and equipment providers; type: Indian commercial-diving, salvage and SPM operations contractor within Samson Group; regions: Asia Pacific, India, Indian coast; roles: Commercial-diving and underwater-repair contractor; Salvage and wreck-removal contractor; SPM terminal operations and maintenance contractor; Air-diving equipment and flat-top-barge operator; Lead member of the New Mangalore green-tug charter consortium; Samson Group marine-services interface. - 2026-08-03 — [Port of Duqm Company SAOC](https://imwo.org/companies/profile-port-of-duqm-company) — group: Operators and concessionaires; type: Omani port authority, landlord and terminal operator joint venture; regions: Middle East, Oman, Duqm Special Economic Zone; roles: Port authority; Port landlord; Commercial-terminal operator during transition; Marine-services coordinator; Industrial and logistics land interface. - 2026-08-02 — [CCCC Second Harbor Engineering Co Ltd](https://imwo.org/companies/profile-cccc-second-harbor-engineering) — group: Contractors and equipment providers; type: Chinese port, marine, bridge and waterway engineering contractor controlled by CCCC; regions: Asia Pacific, China, Global; roles: Port and terminal main contractor; High-pile quay and marine-structure contractor; Piling, access-bridge and berth-platform construction; Waterway and inland-port infrastructure contractor; Marine equipment and construction-plant operator; CCCC controlled operating subsidiary. - 2026-08-02 — [Ports de Normandie](https://imwo.org/companies/profile-ports-de-normandie-port-authority) — group: Port and waterway authorities; type: French regional port authority and infrastructure owner; regions: Europe, France, Normandy, English Channel; roles: Port authority and infrastructure owner; Nautical-access and maintenance-dredging procurer; Marine infrastructure programme sponsor; Joint public-procurement coordinator; Port-domain and operating-condition manager. - 2026-08-02 — [Luka Ploce d.d.](https://imwo.org/companies/profile-luka-ploce-terminal-operator) — group: Operators and concessionaires; type: Croatian port operator and terminal concessionaire; regions: Europe, Croatia, Adriatic, Corridor Vc; roles: Port and terminal operator; Dry-bulk terminal concessionaire; Cargo-handling equipment investor and procurer; Rail-linked cargo logistics provider; Storage and forwarding services provider. - 2026-08-02 — [Budimex S.A.](https://imwo.org/companies/profile-budimex-marine-civil-contractor) — group: Contractors and equipment providers; type: Polish general contractor with hydrotechnical, port and heavy-civil delivery capability; regions: Europe, Poland, Central and Eastern Europe; roles: Design-build consortium leader; Port and terminal civil contractor; Caisson-breakwater contractor; Quay, yard and marine-infrastructure contractor; Hydrotechnical general contractor. - 2026-08-02 — [APM Terminals Poti](https://imwo.org/companies/profile-apm-terminals-poti) — group: Operators and concessionaires; type: Georgian multipurpose seaport owner and operator within APM Terminals; regions: Europe, Georgia, Black Sea, Middle Corridor; roles: Multipurpose seaport owner and operator; Container, general-cargo, bulk and RoRo terminal operator; Brownfield port-capacity investor; Berth, yard, crane and rail-interface asset manager; Marine access and operating-depth stakeholder. - 2026-08-02 — [Ballast Nedam International Projects](https://imwo.org/companies/profile-ballast-nedam-international-projects) — group: Contractors and equipment providers; type: Dutch international contractor delivering complex infrastructure, port and waterworks projects; regions: Americas, Caribbean, Europe, Africa, Asia; roles: International design-build main contractor; Port and harbor infrastructure contractor; Breakwater, dredging, quay and marina package integrator; Remote-island mobilisation and construction-logistics manager; Marine environmental and stakeholder-interface manager. - 2026-08-02 — [Vest Betong](https://imwo.org/companies/profile-vest-betong-marine-contractor) — group: Contractors and equipment providers; type: Norwegian concrete and marine contractor delivering quays, marine works, bridges and infrastructure; regions: Europe, Norway, Nordic region; roles: Marine main contractor; Quay and waterfront concrete contractor; Marine piling and sheet-pile contractor; Dredging and contaminated-sediment package manager; Backland, erosion-protection and quay-equipment contractor; Marine utility and shore-interface contractor. - 2026-08-02 — [Sammut Marine](https://imwo.org/companies/profile-sammut-marine-dredging-contractor) — group: Contractors and equipment providers; type: Maltese marine and civil contractor delivering dredging, marine plant, towing, survey and waterfront works; regions: Europe, Malta, Mediterranean; roles: Dredging contractor; Crane-barge and marine-plant operator; Towing and workboat operator; Hydrographic and multibeam survey provider; Underwater inspection and marine-services provider; Quay, breakwater and coastal-works contractor; Dredged-material handling and disposal contractor. - 2026-08-02 — [Green Hydrogen and Chemicals SPC](https://imwo.org/companies/profile-green-hydrogen-and-chemicals-oman) — group: Infrastructure owners and developers; type: ACME-owned Oman green-hydrogen and green-ammonia project company; regions: Middle East, Oman; roles: Duqm green-ammonia project vehicle; Land-usufruct and project-integration counterparty; Phase 1 plant and export-system client; CBM, export-pipeline and tanker-interface owner-side coordinator; Yara offtake and first-export integration counterparty; Marine investigation client identified by Gulf Testing Lab. - 2026-08-02 — [Teixeira Duarte - Engenharia e Construcoes](https://imwo.org/companies/profile-teixeira-duarte-marine-infrastructure-contractor) — group: Contractors and equipment providers; type: Portuguese engineering contractor with marine, port, foundation and heavy-civil delivery capability; regions: Europe, Africa, Cabo Verde, Portugal, Angola, Mozambique, Algeria; roles: Marine consortium lead; Design-and-build port contractor; Piled Ro-Ro platform contractor; Breakwater and coastal-protection contractor; Jetty rehabilitation contractor; Foundation and sheet-pile contractor; Logistics-platform and port-access contractor. - 2026-08-02 — [Murphy International Limited](https://imwo.org/companies/profile-murphy-international-marine-civil-contractor) — group: Contractors and equipment providers; type: Irish engineering and infrastructure contractor with marine, piling and coastal-delivery capability; regions: Europe, Ireland, United Kingdom; roles: Single-party marine framework contractor; Quay-wall and combi-pile contractor; Marine and civil engineering contractor; Piling and contractor-design provider; Quay demolition and material-reuse contractor; Coastal rock-armour delivery contractor; Live-port construction coordinator. - 2026-08-02 — [Aktau International Sea Commercial Port](https://imwo.org/companies/profile-aktau-port-owner-operator) — group: Port and waterway authorities; type: Kazakh state-owned Caspian port operator, infrastructure client and EBRD borrower; regions: Asia Pacific, Kazakhstan, Caspian Sea, Central Asia, Trans-Caspian Middle Corridor; roles: Port owner and operator; Marine-infrastructure project employer; EBRD borrower and EU grant beneficiary; Berth design-build procurer; Cargo-handling equipment procurer; Construction-supervision client; Associated dredging project sponsor; Port acceptance and operating authority. - 2026-08-02 — [Marsa Maroc](https://imwo.org/companies/profile-marsa-maroc-port-operator) — group: Operators and concessionaires; type: African port terminal operator, concessionaire and brownfield marine-infrastructure investor; regions: Africa, Morocco, Mediterranean, Nador West Med, Casablanca, Jorf Lasfar; roles: Container-terminal concessionaire; Terminal developer and equipment investor; Port operations and maintenance provider; Multipurpose-terminal owner-operator; Brownfield quay-strengthening and deepening investor; Berth-extension and mooring-system investor; Towing joint-venture participant; Terminal digital-systems operator; Cargo-handling and logistics-services provider. - 2026-08-02 — [Dublin Port Company](https://imwo.org/companies/profile-dublin-port-company-owner-operator) — group: Operators and concessionaires; type: State-owned port company, operator and marine-infrastructure client; regions: Europe, Ireland; roles: Port owner and infrastructure client; Harbour, pilotage and VTS authority; Quay, berth, dredging and reclamation programme owner; Towage and technical marine-services provider; Environmental, navigation and works-interface manager; Tenant and terminal-operator infrastructure landlord. - 2026-08-01 — [Busan Port Authority](https://imwo.org/companies/profile-busan-port-authority-port-developer) — group: Port and waterway authorities; type: South Korean port authority, port developer and terminal-infrastructure client; regions: Asia Pacific, South Korea, Busan, Northeast Asia; roles: Port authority and developer; Marine-infrastructure project client; Container-terminal developer; Quay and caisson programme owner; Automated cargo-equipment procurer; Port-facility manager and operator; Construction-site safety and acceptance authority. - 2026-08-01 — [Thessaloniki Port Authority (ThPA)](https://imwo.org/companies/profile-thessaloniki-port-authority-owner-operator) — group: Port and waterway authorities; type: Greek port authority, terminal operator and marine-infrastructure project employer; regions: Europe, Greece, Eastern Mediterranean, Southeastern Europe; roles: Port owner and operator; Marine-infrastructure project employer; Container-terminal developer; Quay and dredging programme client; Contract and claims authority; Owner-side environmental monitoring coordinator; Port investment and bank-finance sponsor. - 2026-08-01 — [Repstad Anlegg](https://imwo.org/companies/profile-repstad-anlegg-marine-contractor) — group: Contractors and equipment providers; type: Norwegian marine and civil contractor; regions: Europe, Norway, Nordic region; roles: Design-build marine contractor; Quay construction contractor; Dredging contractor; Underwater works contractor; Waterfront concrete contractor; Marine fill and seabed works contractor. - 2026-08-01 — [Port of Tanjung Pelepas](https://imwo.org/companies/profile-port-of-tanjung-pelepas) — group: Operators and concessionaires; type: Malaysian container-terminal owner and transshipment operator; regions: Asia Pacific, Malaysia, Johor, Strait of Malacca; roles: Container-terminal owner and operator; Marine civil works client; Dredging, reclamation and berth acceptance authority; Quay-crane and yard-equipment procurement client; Operating-port interface coordinator; Capacity and productivity programme owner; Berth Zero commissioning authority. - 2026-08-01 — [Congo Terminal](https://imwo.org/companies/profile-congo-terminal-operator) — group: Operators and concessionaires; type: Pointe-Noire container-terminal concessionaire and operator; regions: Africa, Republic of the Congo, Pointe-Noire; roles: Container-terminal concessionaire and operator; Marine civil works client; Quay, dredging and reclamation acceptance authority; CRBC construction-contract counterparty; Electric terminal-equipment integration client; Local-bank project-finance borrower; Berth, yard and operating-release coordinator. - 2026-08-01 — [TOA Corporation](https://imwo.org/companies/profile-toa-corporation) — group: Contractors and equipment providers; type: Japanese marine civil engineering, dredging and reclamation contractor; regions: Global, Asia Pacific, Africa, Middle East, Kenya and Mombasa; roles: Marine civil engineering main contractor; Dredging and reclamation contractor; Port and harbor construction contractor; Steel-pipe-pile and jacket-quay delivery integrator; Marine ground-improvement and PVD works contractor; Cargo-yard, pavement, drainage and building works contractor; Environmental monitoring and offshore-disposal compliance counterparty; Package-level quality, schedule and handover contractor. - 2026-08-01 — [AD Ports Group](https://imwo.org/companies/profile-ad-ports-group-operator) — group: Operators and concessionaires; type: Port and maritime operator; regions: Middle East, Africa, Asia Pacific, Europe, Global; roles: Port owner and operator; Terminal concessionaire; Maritime services provider; Infrastructure developer; Logistics operator. - 2026-07-25 — [Port of Newport](https://imwo.org/companies/profile-port-of-newport) — group: Port and waterway authorities; type: Oregon municipal port district, landlord and marine-infrastructure client; regions: Americas, United States, Oregon coast, Yaquina Bay and Newport; roles: Municipal port district and harbor-infrastructure owner; NOAA MOC-P landlord and facility-maintenance counterparty; Marine-works procurement and bid-evaluation authority; Berth, wharf and dock maintenance client; Dredging, survey and upland-disposal acceptance interface; Commercial fishing, research-fleet and recreational harbor coordinator. - 2026-07-23 — [Johnson Bros Limited](https://imwo.org/companies/profile-johnson-bros-limited) — group: Contractors and equipment providers; type: New Zealand marine contractor and dredging-fleet operator; regions: Asia Pacific, New Zealand, Northland and regional ports; roles: Shallow-water dredging contractor; Marine construction and pile-driving contractor; Multipurpose barge and tug operator; Hydrographic pre-dredge and post-dredge survey interface; Dredged-material handling and consent-monitoring contractor; Towing, salvage and emergency marine-response provider; Private co-funder for the planned regional-port dredging barge; Future vessel procurement and operating-interface counterparty. - 2026-07-23 — [Mota-Engil Africa](https://imwo.org/companies/profile-mota-engil-africa-infrastructure-contractor) — group: Contractors and equipment providers; type: Infrastructure and marine civil contractor; regions: Africa, Democratic Republic of the Congo, Southern Africa, West Africa, East Africa; roles: Marine civil contractor; Port infrastructure contractor; Earthworks and platform contractor; Transport infrastructure contractor; Water and utility infrastructure contractor. - 2026-07-22 — [Port of Blyth](https://imwo.org/companies/profile-port-of-blyth) — group: Port and waterway authorities; type: UK statutory trust port and offshore-energy support base; regions: Europe, United Kingdom, North East England and North Sea; roles: Statutory trust port and harbour authority; Battleship Wharf owner and operator; Marine-channel and berth-depth steward; Port-development client; Offshore-wind mobilisation and project-cargo base; Dredging, reclamation, quay and revetment acceptance interface; Marine licensing and navigation coordinator. - 2026-07-22 — [Miri Port Authority](https://imwo.org/companies/profile-miri-port-authority) — group: Port and waterway authorities; type: Sarawak state statutory port authority and port operator; regions: Asia Pacific, Malaysia, Miri and northern Sarawak; roles: Miri Port owner and operator; Kuala Baram access-channel project client; Dredging and training-bund delivery counterparty; Port traffic, navigation-aid and vessel-access coordinator; Hydrographic depth and marine-asset acceptance interface; Post-completion channel maintenance and operating-performance owner. - 2026-07-22 — [Administracion Nacional de Puertos (ANP)](https://imwo.org/companies/profile-uruguay-national-port-administration) — group: Port and waterway authorities; type: Uruguayan public port authority and dredging-fleet owner; regions: Americas, Uruguay, Rio de la Plata; roles: National public port authority; Port of Montevideo administrator; Dredging client and contract authority; Public dredging-fleet owner and operator; Hydrographic and bathymetric information publisher; Navigation-depth and berth-availability steward; Port infrastructure owner and development body. - 2026-07-21 — [Andaman Lakshadweep Harbour Works (ALHW)](https://imwo.org/companies/profile-andaman-lakshadweep-harbour-works) — group: Public delivery and advisory bodies; type: Indian central-government harbour-works delivery office for the island territories; regions: Asia Pacific, India, Andaman and Nicobar Islands, Lakshadweep; roles: Island port and harbour infrastructure delivery office; Breakwater, wharf, jetty and passenger-terminal project authority; Dry-dock, slipway and ship-repair infrastructure delivery authority; Fish-landing and small-harbour facilities delivery authority; Mus seawall and shore-protection procuring client; EPC tender, evaluation and award interface; Island marine logistics and construction-access owner interface; Ministry technical-appraisal and administrative-approval interface; Completed-facility handover and owner-acceptance interface. - 2026-07-21 — [Environmental Protection Agency of Liberia](https://imwo.org/companies/profile-liberia-environmental-protection-agency) — group: Public delivery and advisory bodies; type: National environmental regulator, climate authority and MMCRP implementing partner; regions: Africa, Liberia, Monrovia Metropolitan Area, West Point; roles: MMCRP implementing partner and government coordination point; Environmental and social impact assessment process authority; Environmental permit issuer and compliance monitor; Green Climate Fund national designated authority; Integrated coastal-zone management policy and institutional lead; West Point shoreline, Mesurado wetland and mangrove safeguard authority; Community consultation and environmental-information authority; Government interface with UNDP, Public Works and Mines and Energy; Permit-condition, construction-impact and post-completion monitoring authority. - 2026-07-21 — [São Tomé and Príncipe Ministry of Planning, Finance and Blue Economy](https://imwo.org/companies/profile-sao-tome-planning-finance-blue-economy) — group: Public delivery and advisory bodies; type: Sovereign finance, blue-economy planning and BEFIRM implementing ministry; regions: Africa, São Tomé and Príncipe, São Tomé Island, Príncipe Island; roles: BEFIRM sovereign-grant implementing ministry; Blue Economy Directorate and Satellite Intelligence Unit coordination authority; AfDB procurement, financial-management and disbursement interface; Neves, Porto Alegre and Chimalô package owner coordinator; Design-supervision and future civil-works contracting authority; Site safeguards, resettlement and community-continuity owner interface; National blue-economy and cabotage investment planner; Cold-chain, fisheries-value-chain and port-logistics programme coordinator; Revolving-fund, public-private partnership and long-term maintenance sponsor. - 2026-07-21 — [Agence Portuaire Maritime et Fluviale (APMF)](https://imwo.org/companies/profile-apmf-madagascar) — group: Port and waterway authorities; type: Madagascar port, maritime and inland-waterway authority and PTML technical unit; regions: Africa, Madagascar, Mahajanga, Toliara, Pangalanes Canal; roles: Madagascar port, maritime and inland-waterway regulator; PTML port-and-waterway technical unit; Mahajanga and Toliara port-rehabilitation interface; Pangalanes Canal reopening and navigation-infrastructure interface; APMF-referenced works, goods and consultancy package authority; Port and river stakeholder-engagement coordinator; Resettlement and livelihood-restoration implementation interface; Dredging-management, biodiversity and cultural-heritage control interface; Regional port administration and maritime-safety authority. - 2026-07-21 — [Santa Catarina Civil Defense](https://imwo.org/companies/profile-santa-catarina-civil-defense) — group: Public delivery and advisory bodies; type: State flood-resilience, disaster-risk and protective-infrastructure authority; regions: Americas, Brazil, Santa Catarina, Itajaí Valley; roles: Santa Catarina disaster-risk and climate-resilience authority; P508221 state implementing agency; Protective-infrastructure planning, procurement and works-contracting body; Itajaí-Mirim channel widening and deepening owner interface; Old-river desilting and two-gate programme coordinator; Flood-retention dam and embankment programme authority; Environmental, social and stakeholder-engagement framework owner; Hydrometeorological monitoring, early-warning and flood-response coordinator; Owner-side survey, gate commissioning and hydraulic-performance interface. - 2026-07-21 — [Barbados Fisheries Division](https://imwo.org/companies/profile-barbados-fisheries-division) — group: Port and waterway authorities; type: National fisheries authority and fishing-harbour operator; regions: Americas, Caribbean, Barbados, Bridgetown; roles: Barbados fisheries administration; Major fish landing-site management; Fisheries infrastructure and asset-care interface; Fishing-vessel registration, inspection, haul-out and launch services; Bridgetown Fisheries Complex operating coordinator; Fleet movement, radio communication and emergency-readiness coordinator; Fisherfolk, boat-owner and harbour stakeholder interface; Owner-side operating evidence and asset-handover participant. - 2026-07-21 — [Prime Meridian Docks](https://imwo.org/companies/profile-prime-meridian-docks) — group: Operators and concessionaires; type: Ghanaian shipyard developer, concessionaire and future dry-dock operator; regions: Africa, Ghana, Gulf of Guinea, Port of Takoradi; roles: Project Shiprite sponsor and developer; Takoradi floating-dock asset company and concessionaire; Future ship-repair and dry-dock operator; Civil EPC, dredging and floating-dock procurement counterparty; Rock-dredging, reclamation and jetty owner interface; Floating-dock tow-in, mooring and utility-integration owner; Lender environmental, social and dredging-control interface; Owner-side commissioning, dock trials and facility acceptance body. - 2026-07-21 — [Public Utilities Board (PUB), Kiribati](https://imwo.org/companies/profile-kiribati-public-utilities-board) — group: Water and utility bodies; type: South Tarawa water, sewerage and power utility; regions: Asia Pacific, Pacific islands, Kiribati, South Tarawa; roles: South Tarawa water and sewerage utility; Betio, Bairiki and Bikenibeu sewerage-system operator; Ocean-outfall pump, pipeline and diffuser asset custodian; Saltwater flushing and sewer-network maintenance authority; Sewer cleaning, inspection, spares and preventive-maintenance planner; Discharge, plume and receiving-water evidence holder; Owner-side operating acceptance and asset-handover interface; Sanitation connections, billing and service-performance operator. - 2026-07-21 — [Odisha Industrial Infrastructure Development Corporation (IDCO)](https://imwo.org/companies/profile-odisha-industrial-infrastructure-development-corporation) — group: Public delivery and advisory bodies; type: Statutory industrial infrastructure agency and marine-linked project owner; regions: Asia Pacific, India, Odisha, Ganjam and Gopalpur, Jagatsinghpur and Paradip; roles: Statutory industrial infrastructure and industrial-estate agency; Gopalpur desalination PPP public owner and counterparty; Industrial water-demand, tariff and phasing coordinator; Plant-site, intake, outfall and shore-crossing basis decision maker; Government-support, payment-mechanism and risk-allocation authority; Marine investigation, CRZ and environmental-study sponsor; Future concession procurement and contract-management authority; Paradip industrial-estate reclamation project owner; Owner-side interface for raw-water transfer, storage, power and industrial users. - 2026-07-21 — [Chittagong Port Authority](https://imwo.org/companies/profile-chittagong-port-authority) — group: Port and waterway authorities; type: Autonomous port authority and Bay Terminal implementing agency; regions: Asia Pacific, South Asia, Bangladesh, Chattogram; roles: Statutory port and Karnaphuli navigation authority; Bay Terminal common marine-infrastructure implementing agency; Offshore breakwater and sandbar-stabilisation client; Access-channel, entrance and basin-dredging procurement authority; Hydrographic, sediment and dredging-performance oversight body; Navigation-aids and VTMS integration owner; Marine completion, acceptance and terminal-handover authority; Interface owner for publicly funded marine works and private terminal concessions. - 2026-07-21 — [Central Coast Council Water and Sewer](https://imwo.org/companies/profile-central-coast-council-water-sewer) — group: Water and utility bodies; type: Regional water utility and Toukley desalination planning owner; regions: Asia Pacific, Australia, New South Wales Central Coast; roles: Regional water and wastewater utility; Toukley desalination planning owner and approval applicant; Prospective seawater-intake tunnel and offshore-caisson client; Existing Norah Head outfall integration authority; Marine ecology, geotechnical and plume-assessment coordinator; Future detailed-design and construction procurement authority; Water-security trigger, funding and staging decision maker; Owner-side commissioning and operating-acceptance interface. - 2026-07-21 — [Comisión Nacional del Agua (CONAGUA)](https://imwo.org/companies/profile-comision-nacional-del-agua) — group: Water and utility bodies; type: Federal water authority and Rosarito works-procurement counterparty; regions: Americas, Mexico, Baja California and Playas de Rosarito; roles: Federal water authority and Rosarito project convener; First-module construction procurement and contracting authority; Client for seawater intake and brine-discharge works; Pumping, conveyance, storage and utility-connection coordinator; Owner-side construction supervision and acceptance interface; National water-concession, discharge and federal-zone administration; Federal-state funding and delivery counterparty; Tender-scope boundary and contractor evidence control. - 2026-07-21 — [Vietnam Maritime Corporation (VIMC)](https://imwo.org/companies/profile-vietnam-maritime-corporation) — group: Infrastructure owners and developers; type: Maritime group and Can Gio investor-consortium lead; regions: Asia Pacific, Vietnam, National port network and Ho Chi Minh City; roles: Can Gio investor-consortium lead and sponsor-side coordinator; Seaport, shipping and logistics network integration; Project-enterprise formation and investor-capital interface; Cargo, carrier and transshipment-service development; Feasibility, berth-programme and operating-model input; Investor-side package and partner coordination; Future terminal-operation and service-readiness interface; Boundary control between project development and physical marine works. - 2026-07-21 — [West Africa Coastal Areas Management Program (WACA)](https://imwo.org/companies/profile-waca-program-regional-coordination) — group: Public delivery and advisory bodies; type: Regional coastal resilience programme and coordination platform; regions: Africa, West Africa, Benin, Côte d'Ivoire, The Gambia, Ghana, Guinea-Bissau, Mauritania, São Tomé and Príncipe, Senegal and Togo; roles: Regional coastal-resilience programme coordination; Country access to technical expertise and development finance; Knowledge, policy-dialogue and finance platform; Cross-border coastal-process and environmental-flow coordination; Regional partner and institutional-capacity alignment; Country-project evidence and implementation-support routing; Coastal protection, ecosystem restoration and community-resilience knowledge exchange; Programme-boundary control between ResIP 1, ResIP 2 and WACA+. - 2026-07-21 — [Associated British Ports](https://imwo.org/companies/profile-associated-british-ports) — group: Port and waterway authorities; type: Statutory and competent harbour authority, port owner and capital-dredging client; regions: Europe, United Kingdom, Southampton Water, the Solent and the Nab Channel; roles: Port of Southampton owner and operator; Statutory and competent harbour authority; Southampton VTS, pilotage and navigation-safety authority; SCT 5 and channel-deepening client; Principal dredging-contractor procurement counterparty; Live-port, quay, buried-pipeline and vessel-traffic interface manager; UXO, dredged-material and sea-disposal coordination counterparty; Pre-dredge survey, completed-depth and operational acceptance counterparty. - 2026-07-21 — [Administración del Sistema Portuario Nacional Progreso](https://imwo.org/companies/profile-asipona-progreso) — group: Port and waterway authorities; type: Federal port administrator, infrastructure owner and works-procurement authority; regions: Americas, Mexico, Yucatán and the Gulf of Mexico; roles: Federal port administrator and operator at Progreso; Port infrastructure owner and master-planning authority; Federal north-platform dredging and reclamation client; Engineering-works procurement and contract counterparty; Channel, basin, breakwater and berth-maintenance sponsor; Topobathymetric, material-placement and sediment-control interface; Port operations, survey and completed-geometry acceptance counterparty. - 2026-07-21 — [Haventus / Ardersier Port (Scotland) Limited](https://imwo.org/companies/profile-haventus-ardersier-port) — group: Infrastructure owners and developers; type: Energy-transition port owner, developer and works contracting authority; regions: Europe, United Kingdom, Scottish Highlands and the Moray Firth; roles: Ardersier Energy Transition Facility owner and developer; Phase 2 dredging client and contracting authority; Quay-wall, quayside-civils and landside package sponsor; Navigation-channel geometry and port-operations interface counterparty; Marine-consent, dredged-material and environmental-review interface; Survey, handover and usable-channel acceptance counterparty; Offshore-wind assembly and heavy-load port infrastructure developer. - 2026-07-21 — [Port Authority of New York and New Jersey](https://imwo.org/companies/profile-port-authority-new-york-new-jersey) — group: Port and waterway authorities; type: Bi-state transport authority and marine-terminal infrastructure owner; regions: Americas, United States, New York-New Jersey Port District; roles: Bi-state port and transport authority; Marine-terminal infrastructure owner and landlord; Maintenance-dredging client and contract authority; Terminal work-order and live-operations interface; Sediment information and owner-document counterparty; Survey, payment and work-order acceptance counterparty; Port access and long-term asset stewardship body. - 2026-07-21 — [Autorité Maritime et Portuaire du Burundi (AMPB)](https://imwo.org/companies/profile-burundi-maritime-port-authority) — group: Port and waterway authorities; type: National maritime and port authority; regions: Africa, Burundi, Lake Tanganyika; roles: National maritime, inland-waterway and port authority; Bujumbura Port public owner and programme counterparty; Protective-dike, dredging, quay and marine-dock owner interface; Live-port, vessel-access and navigation coordination authority; Port-equipment, completed-asset and acceptance counterparty; Climate-resilience planning and long-term asset-custody interface. - 2026-07-21 — [Water Authority of Fiji](https://imwo.org/companies/profile-water-authority-of-fiji) — group: Water and utility bodies; type: National water and wastewater utility; regions: Global islands, Fiji, Greater Suva and Laucala Bay; roles: National public water and wastewater utility; Kinoya treatment-plant owner and existing operator; CW02 employer, procuring agency and contract-management counterparty; Existing Laucala Bay outfall operating and condition interface; Effluent compliance, discharge monitoring and environmental-reporting body; Long-term asset owner after the DBO operating period. - 2026-07-21 — [Mumbai Port Authority](https://imwo.org/companies/profile-mumbai-port-authority) — group: Port and waterway authorities; type: Major port authority and harbour operator; regions: Asia Pacific, India, Mumbai Harbour and the Arabian Sea; roles: Mumbai Harbour owner and statutory port authority; Conservancy, pilotage and navigational-aid authority; Vessel traffic and live-harbour coordination operator; Maintenance-dredging employer and annual notice counterparty; Dredging and dumping permission and reporting interface; Hydrographic measurement, depth release and completion-acceptance authority. - 2026-07-21 — [Public Works Authority (Ashghal)](https://imwo.org/companies/profile-ashghal-public-works-authority) — group: Public delivery and advisory bodies; type: National public works authority and infrastructure delivery body; regions: Middle East, Qatar, Doha and Hamad Port; roles: Hamad Port food-security terminal owner-side delivery authority; Public design, procurement and construction-governance body; Dedicated berth, quay-wall and ship-unloading interface client; Technical-installation and remaining-works oversight body; Integrated operational-readiness and handover counterparty; Public infrastructure quality, programme and asset-delivery authority. - 2026-07-21 — [New Mangalore Port Authority](https://imwo.org/companies/profile-new-mangalore-port-authority) — group: Port and waterway authorities; type: Major port authority and harbour operator; regions: Asia Pacific, India, Karnataka and the Arabian Sea; roles: New Mangalore harbour owner and statutory port authority; Vessel traffic, navigation-aid and port-control operator; Channel, waterfront and basin-depth monitoring authority; Port-craft, mooring and marine-pollution-response operator; Battery-electric tug charter client and shore-charging counterparty; Delivery survey, port acceptance and on-hire performance authority. - 2026-07-21 — [Electricity and Water Authority, Bahrain](https://imwo.org/companies/profile-bahrain-electricity-water-authority) — group: Water and utility bodies; type: National electricity and water utility and infrastructure authority; regions: Middle East, Bahrain, Hawar Islands; roles: Hawar SWRO project owner and procuring authority; Offshore intake and outfall EPC client; Marine, treatment-plant and storage-package interface owner; Water infrastructure planner and network operator; Integrated testing, commissioning and owner-acceptance counterparty; Future desalinated-water operating and asset-custody interface. - 2026-07-21 — [Solomon Water](https://imwo.org/companies/profile-solomon-water) — group: Water and utility bodies; type: State-owned urban water and wastewater utility; regions: Global islands, Solomon Islands, Honiara and provincial urban centres; roles: Honiara wastewater-network owner and operator; Urban Water Supply and Sanitation Sector Project implementing utility; Wastewater outfall and pump-station client interface; Marine design, safeguards and tender-definition counterparty; Hydraulic testing, discharge compliance and operating-acceptance interface; Existing-outfall rehabilitation and long-term asset-custody interface. - 2026-07-21 — [GS Inima](https://imwo.org/companies/profile-gs-inima-water-infrastructure) — group: Contractors and equipment providers; type: Desalination developer, EPC contractor and water-operations consortium participant; regions: Middle East, Europe, International desalination markets; roles: Ghubrah III project-company consortium lead and participant; Ghubrah III desalination-plant EPC contractor; Integrated intake, outfall, plant and commissioning delivery interface; Algarve design-build-operate consortium participant; Marine-system testing and wet-commissioning interface; Contracted desalination operations and maintenance participant. - 2026-07-21 — [Damietta Port Authority](https://imwo.org/companies/profile-damietta-port-authority) — group: Port and waterway authorities; type: Egyptian public port authority and marine-infrastructure owner; regions: Africa, Egypt, Eastern Mediterranean; roles: Damietta Port authority and common-infrastructure custodian; Entrance-channel, breakwater, basin and navigational-access authority; Container Terminal II quay-wall, excavation and dredging client; Hydrographic, berth-depth and maintenance-dredging interface; Marine-platform handover counterparty for the terminal concession; Long-term quay, access and port-environment stewardship interface. - 2026-07-20 — [Nauru Maritime and Port Authority](https://imwo.org/companies/profile-nauru-maritime-port-authority) — group: Port and waterway authorities; type: Statutory national port authority and port operator; regions: Pacific Islands, Nauru, Aiwo; roles: National port authority with exclusive control of Nauru ports; Aiwo Port operator and long-term infrastructure custodian; Harbourmaster, pilotage, vessel-movement and berth-control authority; Port safety, security and marine-environment regulator; Port redevelopment operating stakeholder and handover counterparty; Wharf, berth pocket, container-yard and navigation-aid maintenance interface. - 2026-07-20 — [Águas do Algarve, S.A.](https://imwo.org/companies/profile-aguas-do-algarve-regional-water-utility) — group: Water and utility bodies; type: Public regional water and wastewater concessionaire; regions: Europe, Portugal, Algarve; roles: Desalination project owner and contracting authority; Offshore intake, brine outfall and coastal pumping-station client; Environmental mitigation, monitoring and compensation interface; Owner design review, site-access and contract-administration counterparty; Provisional-acceptance and first-water counterparty; Regional supply-system integrator and long-term concession operator. - 2026-07-20 — [Abu Dhabi National Oil Company (ADNOC)](https://imwo.org/companies/profile-adnoc-energy-developer-petroleum-ports) — group: Infrastructure owners and developers; type: Government-owned energy developer and petroleum-port principal; regions: Middle East, United Arab Emirates, Abu Dhabi; roles: Ruwais LNG project developer and marine-works client; Access-channel dredging and navigation-aids procuring entity; Petroleum-port governance principal through the Petroleum Ports Authority; Marine-notice, permission and harbour-acceptance framework owner; Owner-side environmental, survey, handover and marine-readiness counterparty; LNG commercial programme sponsor. - 2026-07-20 — [Port Autonome de Cotonou](https://imwo.org/companies/profile-port-autonome-cotonou-port-authority) — group: Port and waterway authorities; type: Public port authority and infrastructure owner; regions: Africa, Benin, Gulf of Guinea; roles: Port authority and common-infrastructure owner; Breakwater, revetment, reclamation and berth client; Nautical-access, basin and channel improvement client; Port estate, concession and operator-authorization authority; Vessel-assistance and continuous public-service provider; Owner environmental, survey, handover and operating-release counterparty. - 2026-07-20 — [Sizewell C Limited](https://imwo.org/companies/profile-sizewell-c-project-owner) — group: Infrastructure owners and developers; type: Nuclear project owner and harbour authority operator; regions: Europe, United Kingdom, Suffolk coast; roles: Nuclear project developer and construction owner; Temporary desalination and construction-water client; Marine intake, outfall and shore-crossing procuring entity; Statutory harbour authority legal operator; Civil Works Alliance client participant; Owner testing, environmental compliance and handover counterparty. - 2026-07-20 — [Société Nationale des Eaux du Sénégal](https://imwo.org/companies/profile-sones-senegal-urban-water-owner) — group: Water and utility bodies; type: National urban water infrastructure owner; regions: Africa, Senegal; roles: Urban drinking-water asset owner; Desalination and bulk-water programme client; Seawater intake and brine-discharge procurement authority; Distribution-network renewal programme owner; Government and lender coordination counterparty; Owner testing, handover and operating-release authority. - 2026-07-20 — [Maritime and Port Authority of Singapore](https://imwo.org/companies/profile-maritime-port-authority-singapore) — group: Port and waterway authorities; type: National maritime and port authority; regions: Asia Pacific, Singapore; roles: Port planner and infrastructure owner; Marine works client and procurement authority; Port and navigation regulator; Reclamation, seawall and wharf programme owner; Port marine notice and work-zone authority; Land and berth handover counterparty; National maritime representative. - 2026-07-20 — [PUB, Singapore's National Water Agency](https://imwo.org/companies/profile-pub-singapore-national-water-agency) — group: Water and utility bodies; type: National water agency and used-water infrastructure owner; regions: Asia Pacific, Singapore; roles: National water authority; Used-water and water-reclamation infrastructure owner; Marine outfall and coastal-utility client; DTSS programme and procurement authority; Commissioning and operating-acceptance authority; Coastal and flood-resilience lead. - 2026-07-20 — [Codelco](https://imwo.org/companies/profile-codelco-northern-district-water) — group: Infrastructure owners and developers; type: State-owned copper producer and industrial water-system client; regions: Americas, Chile, Antofagasta Region, Northern District; roles: Industrial water-system client and offtaker; BOOT procurement and contract authority; Owner-side technical assurance lead; Commissioning and acceptance counterparty; Northern District distribution-system operator; Future system transfer recipient. - 2026-07-20 — [Emirates Water and Electricity Company](https://imwo.org/companies/profile-ewec-water-power-procurer) — group: Water and utility bodies; type: Abu Dhabi water and electricity planning and procurement company; regions: Middle East, United Arab Emirates, Abu Dhabi; roles: Sole water and electricity procurer; Long-term capacity planner; Power and water purchase agreement counterparty; Independent power and water project procurement authority; Bulk supply and system despatch coordinator; Desalination portfolio planner. - 2026-07-20 — [Lantania](https://imwo.org/companies/profile-lantania-water-infrastructure-contractor) — group: Contractors and equipment providers; type: Water, infrastructure and energy contractor; regions: Europe, Middle East, Africa, Americas; roles: Desalination EPC contractor; Seawater intake and outfall contractor; Water process engineering contractor; Marine utility interface contractor; Commissioning contractor. - 2026-07-18 — [Kamarajar Port Limited](https://imwo.org/companies/profile-kamarajar-port-owner-operator) — group: Infrastructure owners and developers; type: Government-owned landlord port company; regions: Asia Pacific, India; roles: Major-port owner and landlord; Approach-channel, basin and berth-depth client; Capital and maintenance dredging authority; Hydrographic survey and declared-depth manager; Pilotage, navigation, HSE and marine-services authority; PPP, DBFOT and captive-terminal infrastructure landlord. - 2026-07-18 — [The Arab Contractors](https://imwo.org/companies/profile-arab-contractors-marine-contractor) — group: Contractors and equipment providers; type: Marine civil and infrastructure contractor; regions: Africa, Middle East, Comoros; roles: Port and quay contractor; Breakwater and coastal-structure contractor; Dredging and rock-excavation contractor; Marine plant and heavy-lift operator; Water and civil-infrastructure contractor. - 2026-07-15 — [International Container Terminal Services, Inc. (ICTSI)](https://imwo.org/companies/profile-ictsi-terminal-operator) — group: Operators and concessionaires; type: Global independent port and container-terminal concessionaire; regions: Asia Pacific, Americas, Europe, Middle East, Africa; roles: Container-terminal operator and concessionaire; Brownfield terminal redevelopment client; Quay, yard, and cargo-handling infrastructure investor; Port-equipment electrification and decarbonisation sponsor; Project-finance borrower and multi-terminal programme owner. - 2026-07-14 — [Montreal Port Authority](https://imwo.org/companies/profile-montreal-port-authority) — group: Port and waterway authorities; type: Autonomous federal port authority and infrastructure owner; regions: Americas, Canada; roles: Federal port authority; Port infrastructure owner and landlord; Marine works client; Navigation and port-access steward; Intermodal rail infrastructure operator; Contrecœur expansion project sponsor. - 2026-07-14 — [Maraen Port of Nigg](https://imwo.org/companies/profile-maraen-port-of-nigg-owner-operator) — group: Operators and concessionaires; type: Private energy-port owner and operator; regions: Europe, United Kingdom; roles: Port owner and operator; Marine infrastructure client; Offshore wind marshalling and logistics provider; Heavy-lift and load-out port; Energy-project fabrication and assembly interface. - 2026-07-14 — [Westport](https://imwo.org/companies/profile-westport-wa-port-program-owner) — group: Public delivery and advisory bodies; type: Government port and freight-infrastructure delivery program; regions: Asia Pacific, Australia; roles: Government infrastructure program owner and client; Marine-investigation and reference-design sponsor; Channel, dredging, reclamation, breakwater, and quay program proponent; Environmental-assessment proponent and marine-science sponsor; Port, road, rail, and logistics package-integration lead; Proponent for a temporary statutory delivery authority, subject to Parliament. - 2026-07-14 — [La Congolaise des Voies Maritimes (CVM)](https://imwo.org/companies/profile-cvm-congo-waterway-owner) — group: Operators and concessionaires; type: Waterway, dredging, and navigation operator; regions: Africa, Democratic Republic of the Congo; roles: Maritime-waterway maintenance operator; Hydrographic and bathymetric survey provider; Maintenance-dredging fleet owner and operator; Navigation-marking and maritime-pilotage provider; Dredger procurement, acceptance, and deployment client. - 2026-07-14 — [Port of Luleå](https://imwo.org/companies/profile-port-of-lulea-public-port-owner) — group: Infrastructure owners and developers; type: Municipally owned port company and marine-infrastructure client; regions: Europe, Sweden; roles: Public port owner and operator; Port infrastructure and terminal-development client; Joint Malmporten implementation and procurement authority; Port-control and work-in-water permit authority; Tug, icebreaking, quay, and vessel-service provider. - 2026-07-14 — [Water Corporation](https://imwo.org/companies/profile-water-corporation-western-australia-utility-owner) — group: Water and utility bodies; type: Public water utility and marine-infrastructure client; regions: Asia Pacific, Australia; roles: Public water infrastructure owner and client; Desalination and marine-utility programme sponsor; Alliance procurement and delivery participant; Marine environmental and operational acceptance owner; Long-term drinking-water system operator. - 2026-07-14 — [Aqaba Development Corporation](https://imwo.org/companies/profile-aqaba-development-corporation-port-owner) — group: Infrastructure owners and developers; type: Public development corporation and port-asset owner; regions: Middle East, Jordan; roles: Port asset owner and landlord; Marine and terminal infrastructure client; Concession and DFBOT procurement authority; Public-private partnership sponsor; Port, utility, transport, and strategic-land interface owner. - 2026-07-14 — [Western Ligurian Sea Port Authority](https://imwo.org/companies/profile-western-ligurian-sea-port-authority) — group: Port and waterway authorities; type: Public port-system authority and infrastructure client; regions: Europe, Italy, Ligurian Sea; roles: Port-system authority; Marine infrastructure client; Port-access programme sponsor; Public procurement authority; Port planning and stakeholder coordinator; Environmental and operational governance body. - 2026-07-14 — [Femern A/S](https://imwo.org/companies/profile-femern-fixed-link-owner) — group: Infrastructure owners and developers; type: State-owned fixed-link project company and infrastructure client; regions: Europe, Denmark, Germany, Fehmarnbelt; roles: Fixed-link infrastructure client; Immersed-tunnel programme owner; Cross-border interface coordinator; Marine works and systems procuring entity; Environmental and schedule governance body; Future toll-road and rail-link operator. - 2026-07-14 — [Port Autonome de Dakar](https://imwo.org/companies/profile-port-autonome-dakar-port-authority) — group: Port and waterway authorities; type: National port authority and Ndayane project partner; regions: Africa, Senegal, West Africa, Dakar, Ndayane; roles: Port authority; Public project partner; Port estate owner and manager; Harbour infrastructure planner; Navigation and operating-readiness stakeholder; Terminal joint-venture shareholder. - 2026-07-14 — [Vadhvan Port Project Limited](https://imwo.org/companies/profile-vadhvan-port-project-limited-owner) — group: Infrastructure owners and developers; type: Public port project SPV and landlord-port developer; regions: Asia Pacific, India; roles: Greenfield port programme owner; Marine works procurer; Landlord-port developer; Dredging and reclamation package authority; Breakwater and navigation-infrastructure client; Terminal PPP interface manager. - 2026-07-13 — [Port of Antwerp-Bruges](https://imwo.org/companies/profile-port-of-antwerp-bruges-authority) — group: Port and waterway authorities; type: Public port authority and operator; regions: Europe, Belgium; roles: Port landlord and concession authority; Port infrastructure client; Nautical services operator; Maritime access and dredging authority; Industrial and energy-transition infrastructure sponsor. - 2026-07-13 — [Daewoo E&C](https://imwo.org/companies/profile-daewoo-ec-marine-civil-contractor) — group: Contractors and equipment providers; type: Engineering and construction contractor; regions: Asia Pacific, Middle East, Africa, Europe, Global; roles: Port civil contractor; Breakwater and seawall contractor; Quay and terminal contractor; Dredging and reclamation contractor; Immersed-tunnel contractor. - 2026-07-13 — [Panama Canal Authority](https://imwo.org/companies/profile-panama-canal-authority-waterway-operator) — group: Port and waterway authorities; type: Public authority; regions: Americas, Global; roles: Waterway owner and operator; Navigation-channel maintenance authority; Dredging fleet operator; Public procurement authority; Canal modernisation sponsor. - 2026-07-13 — [Pilbara Ports](https://imwo.org/companies/profile-pilbara-ports-bulk-port-authority) — group: Port and waterway authorities; type: Public port authority and operator; regions: Asia Pacific, Australia; roles: Port owner and operator; Navigation-channel authority; Capital and maintenance dredging client; Public procurement authority; Port development sponsor.