Australian maritime engineering, dredging and marine-equipment contractor

Birdon

Birdon cutter-suction dredger Ballina operating in Port Phillip and Western Port

Birdon; Ballina on the company's Parks Victoria Dredging project page

Birdon was founded in Port Macquarie in 1977 with a single dredge and now describes operations across Australia, the United States, Europe and Asia.

Organization overview

Australian maritime engineering, dredging and marine-equipment contractor

Geographic footprint: Australia, Port Phillip and Western Port, New South Wales, South Australia, Queensland, and Asia Pacific. Core marine roles: Maintenance and capital dredging, Cutter-suction and backhoe dredging, Navigation-channel and harbour maintenance, and Dredge and sand-transfer-system supply, modification, installation and testing.

Project records 1 Last reviewed

Type

Australian maritime engineering, dredging and marine-equipment contractor

Active regions

Australia, Port Phillip and Western Port, New South Wales, South Australia, Queensland, Asia Pacific

Marine works roles

Maintenance and capital dredging, Cutter-suction and backhoe dredging, Navigation-channel and harbour maintenance, Dredge and sand-transfer-system supply, modification, installation and testing, Beach nourishment and slurry transfer, Hopper, split-hopper, work-barge, tug and workboat operations, Mine-tailings dredging and remediation, Equipment establishment and maintenance

Role in marine infrastructure

Birdon was founded in Port Macquarie in 1977 with a single dredge and now describes operations across Australia, the United States, Europe and Asia. Its maritime work spans vessel design, construction, operation and maintenance together with dredging and remediation. Buying for Victoria names Birdon Pty Ltd on current contract ITS2-00160 for Port Phillip and Western Port maintenance dredging, with a displayed AUD 31.9 million fixed-value total and a 1 November 2021 start. Birdon's project page describes the current term as 2021-2030 and names cutter-suction dredge Ballina and support craft Willie Tell and Bella. That plant and term are company-published particulars; Parks Victoria's campaign notices and acceptance records remain the authority for individual sites, quantities and completed work.

Sources used 7

Source collections