International Marine Work Organization
Marine and hydraulic works.
Engineering knowledge, comparative research and project intelligence for planning, delivery and long-term performance.
1,270 source-linked changes across 312 projects, with every conclusion bounded by published evidence.
Latest evidence
What changed and why it matters
Latest intelligence
More intelligence
Additional project, contract, finance, operations, and market reporting. Read the featured analysis.
Lekki: Match Maintenance Dredging to the Beach Sand Budget
Lekki's design connects maintenance dredging to the artificial beach east of the port. A 2023 study by authors at CCCC-FHDI and China Harbour describes west-to-east sand transport interrupted by the port structures, with nourishment intended to replenish the downdrift beach. Its modelled sand supply combines western deposits with material recovered from the basin and channel [1]. A dredging campaign feeding that beach needs both a navigation cut and a suitable fill supply.
5 November 2026 / 4 sources
Tuvalu Nui and Niutao harbour handover evidence
Nui and Niutao now have public completion and handover evidence for two named climate-resilient boat-harbour assets. That closes a construction question but opens a more demanding service question: whether reef access, aids to navigation, ramps, wharves, passenger and cargo facilities, maintenance systems, and workboat transfers remain available through routine use and severe weather. The current public record supports handover, not a long-term reliability or resilience conclusion.
15 July 2026 / 7 sourcesProject intelligence
Project tracker
Knowledge centre
Technical and commercial reference points for marine works decisions.

Ground, sediment, access, and temporary works intelligence.

Quays, berths, navigation access, terminals, and shipyard interfaces.

Reservoirs, flood drainage, pumping, seawater intakes and outfalls.

Package strategy, bid movement, qualification rules, and awards.
Regional coverage
Follow the project record by region
Research tools
Research indexes and evidence
Reports and evidence
Published reports
Dredging Prices and the Cost of Completing a Campaign
First published Analysis cutoff
Version 5.0 / Three detailed case files / Seasonal plant and ground accounts / Acceptance and receipt triggers / Material-credit and idle-time rules
Global Marine Utility Interface Monitor: July 2026
First published Analysis cutoff
Version 2.11 / 21 tracked projects / 163 project source citations / 20 Confirmed records / 6 world regions
Dredging Contracts: Where the Payment Account Breaks
First published Analysis cutoff
Version 2.0 / Cochin payment account / Standby compensation / Cross-port fleet decision / Payment discipline
Governance
Independent, source-led, and commercially useful.
IMWO separates independent public information, supported research, sponsored material, and directory listings. Research notes are built around traceable sources, editorial judgement, and clear market relevance.
Contact
Work with IMWO
For corrections, source submissions, collaboration proposals, regional coverage, company profiles, and research enquiries.
Contact IMWO