Tartous port modernisation mobilised
Regional intelligence
Large-scale coastal development, utilities, ports, industrial waterfronts, and private destination programmes.
Projects, client activity, procurement and contractor appointments across Middle East.
Tartous port modernisation mobilised
34 project records connected to this region.
37 current analyses and briefs coded to this region.
41 public profiles identify active work or decision roles in this region.
Project coverage
Oman / Port infrastructure / OMR 36.995 million construction award approved in July 2026; contractor and detailed marine scope remain undisclosed
award / Last checkedUAE / Port infrastructure / CHEC EPC delivery and live-berth works reported by two current staff profiles; owner releases confirm the AED 84 million programme but do not name the contractor
construction / Last checkedSaudi Arabia / Marine utilities / EPC performance test completed on 19 February 2026; SWPC commercial-operation confirmation remains unpublished
commissioning / Last checkedOman / Deep-water ports and energy terminals / Phase 1 plant construction and CBM equipment delivery are active. Masirah Marine is the reported installation lead; its contract, vessel allocation and ASD-tug support remain undisclosed
construction / Last checkedUAE / Marine utilities / Block A in service; Blocks B and C remain in the 2026 delivery programme
commissioning / Last checkedKuwait / Deep-water ports and container terminals / Phase I EPC signed with CCCC; government follow-up continues, while mobilisation and marine construction remain unverified
award / Last checkedOman / Port infrastructure / 83% complete in August 2025; completion, contractor and acceptance remain unverified
construction / Last checkedJordan / Port infrastructure / DFBOT proposals due 17 August 2026
tender / Last checkedBahrain / Liquid-cargo terminal maintenance / Bahrain Tender Board's May 2026 report records a BHD 340,000 extension under tender T17600(65), following the May 2021 BHD 2,489,690 five-year award to Bahrain Maintenance and Diving Services; the extension duration and work orders remain undisclosed
award / Last checkedUAE / Marine utilities / EWEC lists Taweelah RO as an existing 909,000 m3/day facility and records 297.16 million m3 of 2024 production; final as-built intake and outfall geometry is not publicly disclosed
completed / Last checkedSaudi Arabia / Naval base wharf and fleet-support facilities / USAspending records W912ER-23-C-0002 at USD 400,127,768.96 obligated and exercised, with the current performance period ending 8 March 2027 and the latest modification dated 7 May 2026; no public physical-completion or owner-acceptance record is established
construction / Last checkedBahrain / Liquid-cargo terminal berth enhancement / Bahrain Tender Board's March 2026 monthly report records a BHD 10,987,831 award to NASS Contracting for Sitra Wharf tender T78534; no award date, contract signature, mobilisation or installed work is published
award / Last checkedOman / Fishing-port concession, commercial waterfront and operating PPP / Liwa remained in Oman's 2024 PPP and fisheries-investment pipeline after 2021 and 2023 market approaches; a selected developer and financial close remain undisclosed through 8 August 2026
tender / Last checkedOman / Operating fishing-port maintenance dredging / Oman eTender 441/2023/MAFWR/HQ-36 reached financial evaluation in Q3 2023, then a Recall-1 procedure closed on 19 December 2023; an awardee, value and mobilisation remain undisclosed
tender / Last checkedOman / Fishing-port breakwaters, dredging, quay and marine infrastructure / Liwa harbour was operating by 2023 after the original Galfar award and 2015-2017 downstream marine works; formal completion, acceptance and final-account records remain unrecovered
completed / Last checkedOman / Fishing-port maintenance, rehabilitation and dredging / Masirah Island International identifies active harbour maintenance, rehabilitation and dredging; a 2025 Oman News Agency owner-side report says the port remained under maintenance, with no public completion or acceptance record
construction / Last checkedOman / Small-port commercial activation, maintenance, dredging and berth readiness / A three-year development, management and operation framework was signed with Abu Sultan Enterprises in December 2025; the planned handover for maintenance and simple operations, physical marine works, capital programme and current operating state are not publicly confirmed
planning / Last checkedOman / Fishing-port dredging, breakwater, groyne, quay and reclamation / The Ministry reported 100% completion in May 2026 after an 81% owner update in January; final hydrography, formal acceptance, operating release and most downstream marine packages remain undisclosed
completed / Last checkedOman / Port infrastructure / Serka-MSF completed the commercial-terminal fit-out in December 2020; the port is operational, while AIIB's 2025 review says throughput and revenue remain below original forecasts
completed / Last checkedSaudi Arabia / Deep-water ports and energy terminals / Overall complex above 90% complete; energization and commissioning started, with jetty VTS radar commissioned but first ammonia transfer not confirmed
commissioning / Last checkedOman / Port infrastructure / 75% complete in June 2024 with some facilities operating; full completion and formal opening remain unverified
commissioning / Last checkedOman / Port infrastructure / OMR 28.612 million design-and-build award confirmed; current construction progress and marine subcontract chain remain partly undisclosed
construction / Last checkedOman / Deep-water ports and energy terminals / Access-channel dredging completed; LNG jetty, shore protection and drainage under construction
construction / Last checkedUAE / Marine utilities / EPC agreement signed on 7 May 2026; no notice to proceed or marine mobilisation is published
award / Last checkedUAE / Deep-water ports and energy terminals / Ruwais LNG remains under development for 2028 commercial operations; a February 2025 port notice placed the access-channel dredging in phased 24-hour execution, but no final marine acceptance record has been published
construction / Last checkedOman / Marine utilities / Under construction; Nama PWP targets commercial operation in Q1 2027
construction / Last checkedBahrain / Marine utilities / Two bids were opened for Hawar's separate offshore intake and outfall EPC package on 25 December 2025; EWA still lists the wider desalination scheme as a future project and no award is published
tender / Last checkedSaudi Arabia / Marine utilities / Sharakat is qualifying developers across five planned seawater reverse-osmosis projects; no individual RFP, award or project-specific marine package is public
prequalification / Last checkedSyria / Port infrastructure / Operations active; modernisation equipment mobilising
early works / Last checkedUAE / Marine utilities / PPA and EPC signed; cooling-water review and existing-plant tie-ins exposed, marine route unconfirmed
award / Last checkedSaudi Arabia / Marine utilities / Project agreements, the L&T-Lantania EPC award and December 2025 financial close are evidenced, and ACWA's 3 March 2026 year-end report classifies the full 300,000 m3/day capacity as under construction; offshore mobilisation, installed intake or outfall geometry, first water and accepted production are not dated
construction / Last checkedJordan / Marine utilities / Final technical and legal agreement signed; financial close still pending as of 7 July 2026
financing / Last checkedIraq / Port infrastructure / Core marine assets built; terminal, tunnel, and commercial-operating interfaces remain under verification
construction / Last checkedQatar / Port infrastructure / Owner reports 98% construction; full-system handover pending
construction / Last checkedCurrent research
Bahrain Tender Board's May 2021 report names Bahrain Maintenance and Diving Services on tender T17600(65), a BHD 2,489,690 five-year time contract for mechanical services across wharf structures and pipeline repair programmes. Its May 2026 report records a separate BHD 340,000 extension under the same tender and with the same contractor, without publishing duration, call-offs, asset locations or current progress.
Updated
Kuwait's Ministry of Public Works and CCCC signed the Phase I EPC for Mubarak Al-Kabeer Port in December 2025. CCCC values the water-transport contract at RMB 28.43 billion. The award is confirmed; the executing subsidiary, detailed marine scope, subcontractors, mobilisation, construction quantities and completion schedule are not.
Updated
EGA's dedicated Khalifa Port berth already received fully laden Capesize vessels after approach-channel works entered service in June 2019. AD Ports Group and EGA now confirm an AED 84 million Newcastlemax upgrade for August 2028. Two current China Harbour Engineering Company staff profiles independently identify the matching EPC and active live-berth refurbishment, while the owner releases still do not name the contractor.
Updated
ACME's Duqm export package is a four-buoy Conventional Buoy Mooring for refrigerated green ammonia. EIL holds the offshore engineering consultancy, Bluewater the CBM agreement and Straatman the delivered control package. An industry source identifies Masirah Marine as the most likely selected installation contractor. Masirah's Oman portfolio supports the attribution through relevant buoy, anchoring, pipeline, diving, survey and construction-barge experience, although no public ACME-, Bluewater- or Duqm-specific award confirms it. Bluewater's ACME release describes system delivery, while the company's wider literature records experience delivering and installing CBM systems. That leaves Masirah's main-contract or subcontract position unresolved. Masirah's fleet page lists twin-screw tugs rather than ASD units, and an Imodco/SBM Offshore study calls for two ASD tugs during Khareef connection operations. The tug provider remains an undisclosed part of the offshore spread.
Updated
DEWA commissioned Hassyan Block A, 60 MIGD, by the end of March 2026. The wider marine installation is already sized for the planned 240 MIGD complex: eight intake risers feed four 3 m pipes, while two 3 m outfalls discharge through modelled diffusers outside the Ramsar boundary. Blocks B and C still have to turn that EPC configuration into sustained plant and receiving-water performance.
Updated
Taweelah C's developer-side staffing now exposes two owner-review interfaces inside the 2.6 GW execution chain: cooling-water systems in mechanical and piping oversight, and existing-plant tie-ins, permits, surveys and commissioning in BOP management. Those role descriptions still do not identify a seawater intake, discharge route, pipeline, dredging, cofferdam or marine-civil package.
UpdatedDelivery network
Integrated infrastructure developer and contractor / Water design and construction contractor / Desalination EPC and commissioning lead
Last checked
Independent water project developer / Infrastructure investor / Project company shareholder
Last checked
Capital and maintenance dredging contractor / Port, waterway and reclamation contractor / Coastal defence, riverbank and hydraulic-infrastructure contractor
Last checked
Port engineering, procurement and construction / Dredging and reclamation group capability / Marine and transport-infrastructure design and construction
Last checked
Marine contractor / Dredging contractor / Reclamation contractor
Last checked
Port operator / Terminal operator / Concessionaire
Last checkedSearch the complete public index for this geography, compare the tracker records, and use IMWO confidence labels before treating a signal as a tender, award, mobilisation, acceptance, or operating outcome.
Search Middle East Open project tracker Review methodology