Project record

Bapco wharf and pipeline repair term services

Participation
Not assessed
Project facts checked

Bahrain Tender Board's May 2026 report records a BHD 340,000 extension under tender T17600(65), following the May 2021 BHD 2,489,690 five-year award to Bahrain Maintenance and Diving Services; the extension duration and work orders remain undisclosed

Project sources

Bahrain Tender Board's May 2021 report names Bahrain Maintenance and Diving Services on tender T17600(65), Provision of Mechanical Services for Wharf Structure and Pipeline Repair Programs in the Company's Operating Area, at BHD 2,489,690 for a five-year time contract. Its May 2026 report records a BHD 340,000 extension under the same tender and with the same contractor. The two report month-ends are observation dates, not legal award or signing dates, and the extension duration, call-offs, asset locations and current delivery state are not published.

Aerial visualization of refinery-linked liquid-cargo wharf pipeline maintenance with a workboat

IMWO artist's impression of the published Bapco wharf and pipeline repair term services scope

Location

Bahrain / Middle East

Segment

Liquid-cargo terminal maintenance

Phase

Award / Confirmed

Last checked

11 August 2026

Coverage

Related sectors

Liquid-cargo terminal maintenance is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Bapco Refining (the historical 2021 report labels Bahrain Petroleum Company)
Delivery parties
Bahrain Maintenance and Diving Services - confirmed original award and May 2026 extension recipient, Mechanical, diving, marine-plant, fabrication, supply and other lower tiers - no organization disclosed
Contract route
Bahrain Petroleum Company placed a five-year time-contract award with Bahrain Maintenance and Diving Services under tender T17600(65), according to the May 2021 Tender Board report. The May 2026 report classifies a further BHD 340,000 action as an extension. The public rows do not expose an executed contract, extension instrument, bid schedule, rates, call-off mechanism or complete commercial ledger.
Execution window
The original award report states a five-year time contract, but does not publish the legal commencement date. The May 2026 report does not state the extension duration, effective date or expiry. Its report period end is an observation date only, not evidence of signature, mobilisation, a work order, physical progress or completion.
Works package
The controlled title covers mechanical services for wharf structure and pipeline repair programmes in the company's operating area. It does not publish the exact wharves, berths, pipelines, work-order list, inspection findings, quantities, repair methods, live-system tie-ins, shutdowns, marine spread, testing requirements or acceptance criteria.
Marine interfaces
Bapco's current operating context includes refinery-linked liquid-cargo export infrastructure and Sitra Wharf. That context explains why wharf, pipeline, marine-access, diving, hazardous-area, operating-continuity and return-to-service controls matter, but it does not prove that T17600(65) is confined to Sitra or that any specific berth, pipeline or call-off is active.
Commercial evidence boundary
The original BHD 2,489,690 award and later BHD 340,000 extension are separate award-side records under one tender number. Public evidence does not establish whether the extension changes duration, ceiling, rates or scope, nor does it publish call-off values, paid amounts, variations or final account. Summing the two values would manufacture a contract total that the sources do not state.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Original time-contract award

Mechanical services for wharf structure and pipeline repair programmes, tender T17600(65)

Named party
Bahrain Maintenance and Diving Services
Evidence status
Confirmed
Source position
Bahrain Tender Board's May 2021 report names the contractor, BHD 2,489,690 value and five-year time-contract form. Source
Extension action

T17600(65) extension

Named party
Bahrain Maintenance and Diving Services
Evidence status
Confirmed
Source position
Bahrain Tender Board's May 2026 report records a BHD 340,000 extension with the same contractor without publishing its duration or work orders. Source
Asset boundary

Wharf structures and pipelines in the company's operating area

Named party
Bapco Refining
Evidence status
Undisclosed
Source position
The tender title defines asset classes but neither award report identifies the wharf, berth, pipeline, location or quantity in any work order.
Lower-tier delivery chain

Mechanical, diving, marine-plant, fabrication and supply support

Named party
No lower-tier organization named
Evidence status
Undisclosed
Source position
The reviewed award-side records identify only the prime recipient and do not publish subcontractors, suppliers, workshare or assigned plant.
Execution and acceptance

Call-offs, repair delivery, testing and return to service

Named party
Bapco Refining and Bahrain Maintenance and Diving Services
Evidence status
Not evidenced
Source position
No reviewed source publishes a work-order date, mobilisation, installed quantity, current progress, completion certificate or owner acceptance.

Project timeline

Material developments

Dated events that changed scope, counterparties, delivery, commissioning or operating status.

Open this project in the Change Log

Monthly report observes a BHD 340,000 extension

The extension keeps Bahrain Maintenance and Diving Services under T17600(65), but does not expose duration, effective date, work orders or physical delivery.

Source

Monthly report records the original five-year award

The public row fixes Bahrain Maintenance and Diving Services, BHD 2,489,690 and a five-year time contract; month-end is not the legal award or commencement date.

Source

Evidence gap

What remains unverified

Outstanding evidence

  • Legal original-award and extension dates, instruments and effective periods
  • Call-off and work-order schedule under T17600(65)
  • Exact wharves, berths, pipelines and quantities
  • Inspection findings, repair methods and design responsibility
  • Shutdowns, live-system controls and operating continuity
  • Named subcontractors, suppliers, workshare and marine plant
  • Current mobilisation, progress and completed work orders
  • Testing, return to service, acceptance, payments and final account

Reporting status

Project phase
Award
Evidence confidence
Confirmed
Last checked
11 August 2026
Cited sources
6