Sector intelligence
Marine pipelines, intake and outfall interfaces, subsea utilities, marine plant, access systems, and technically constrained waterside packages.
This controlled sector is a parent research lens. Projects retain their detailed work segment and can appear in more than one sector where the documented scope crosses delivery disciplines.
Capability-sensitive awards
44 project records connected to this sector.
53 current analyses and briefs connect through governed project relationships.
34 public profiles connect through documented project roles.
Project coverage
India / Dredging / Tender E.47/2026 remains open; bids due 6 August 2026 after two corrigenda
tender / Evidence reviewedNetherlands / Dredging / Named and launched on 3 October 2025; latest reviewed owner update still described construction as ongoing on 5 March 2026; delivery and service entry remain unconfirmed
delivery / Evidence reviewedUnited States / Dredging and waterways / IFB W912DS26BA027 open; 237,945 CY in the base dredging CLINs; bids due 31 July 2026; no award or mobilisation recorded
tender / Evidence reviewedAustralia / Marine utilities / Prepare EIS; the current concept fixes a 2.4 km intake tunnel and existing-outfall connection, but no construction decision or funding is public
planning / Evidence reviewedNetherlands / Offshore wind foundations / DEME holds the transport and installation contract for 69 monopile foundations; offshore mobilisation has not been announced
award / Evidence reviewedUnited Kingdom / Marine utilities / Three sub-seabed utility lines remain under an active harbour construction notice; the CDO and desalination pipe-pull notices have closed
construction / Evidence reviewedUAE / Marine utilities / EPC agreement signed on 7 May 2026; no notice to proceed or marine mobilisation is published
award / Evidence reviewedSaudi Arabia / Marine utilities / EPC performance test completed on 19 February 2026; SWPC commercial-operation confirmation remains unpublished
commissioning / Evidence reviewedOman / Marine utilities / Under construction; Nama PWP targets commercial operation in Q1 2027
construction / Evidence reviewedBrazil / Dredging and waterways / World Bank project is Active and Board Approved; the April 2026 procurement plan omits the Itajaí-Mirim main works package
approval / Evidence reviewedSenegal / Marine utilities / Plant remained under construction in February 2026; commissioning was expected later in 2026, while final marine handover evidence remains unpublished
construction / Evidence reviewedSolomon Islands / Marine utilities / ADB still lists bid-document preparation for the new marine works; Solomon Water's public plan carries competing three-outfall, two-new-outfall and NRH/Ranadi package definitions, with no works award disclosed
tender / Evidence reviewedUAE / Marine utilities / ACWA lists commercial operations from Q1 2024; the 200 MIGD plant is operating, while final as-built intake and outfall geometry is not publicly disclosed
completed / Evidence reviewedUnited States / Dredging / Three preliminary bids opened for MFP-364.003; evaluation and award remain pending
evaluation / Evidence reviewedUnited States / Dredging and waterways / Callan Marine dredging has reached the Gulf Intracoastal Waterway junction; the Navigation District says the next work front is the harbor and turning basin
construction / Evidence reviewedUnited States / Dredging and waterways / IFB amendment 0007 posted 16 July 2026; bids closed 17 July; no award or notice to proceed posted
tender / Evidence reviewedNorfolk Island / Dredging and waterways / Rock revetment contractor appointed; the separate channel-dredging and pier-repair package was released to tender on 14 May 2026
tender / Evidence reviewedUnited Kingdom / Dredging / Marine licence MLA/2026/00178 remains submitted and open for consultation; the principal-contractor participation stage closed on 6 February 2026 and no award notice is published in the reviewed procurement family
approval / Evidence reviewedBahrain / Marine utilities / Two bids were opened for Hawar's separate offshore intake and outfall EPC package on 25 December 2025; EWA still lists the wider desalination scheme as a future project and no award is published
tender / Evidence reviewedMexico / Marine utilities / Compras MX lists the invitation as current, with proposal opening deferred to 24 July 2026 and the ruling moved to 29 July; no award is published
tender / Evidence reviewedIndia / Dredging / The Government of India reports Phase VI complete and Kamarajar operating at 18.0 metres draft; the post-dredge survey sheet and a first fully laden Capesize call are not published
completed / Evidence reviewedIndia / Dredging / The open tender closed on 16 March 2026; no award, work order or mobilisation is identified
tender / Evidence reviewedPortugal / Marine utilities / Construction was released on 22 April 2026 and the site milestone was held on 8 July; offshore intake and outfall execution remains unverified
construction / Evidence reviewedSaudi Arabia / Marine utilities / Sharakat is qualifying developers across five planned seawater reverse-osmosis projects; no individual RFP, award or project-specific marine package is public
prequalification / Evidence reviewedIndia / Marine utilities / Four IFC advisory procurements define transaction preparation; the 100 MLD PPP, marine site, concession and works remain unawarded
planning / Evidence reviewedBelgium / Dredging / 22,000 m³ TSHD ordered; China hull build, Singapore completion, trials, and 2029 delivery remain pending
delivery / Evidence reviewedUnited Kingdom / Dredging / Award decision published to Boskalis Westminster; contract signature and start not evidenced
award / Evidence reviewedMexico / Dredging / Initial state dredging phase completed and a separate private berth stage is active; the federal 40 ha north-platform construction-dredging tender was declared void on 8 July 2026, with no rebid confirmed
tender / Evidence reviewedSingapore / Marine utilities / Nearshore outfall and Contract 1A permanent works were substantially completed on 14 August 2023; wider DTSS2 and Tuas WRP completion, commissioning and discharge acceptance remain open
construction / Evidence reviewedKiribati / Marine utilities / ADB records the three-outfall civil package completed in August 2018, testing and commissioning in Q2 2019, the wider project physically completed on 31 December 2019, and the financing operation closed
completed / Evidence reviewedDemocratic Republic of the Congo / Dredging / Easydredge 2700XL building contract signed; no yard, trial, delivery, acceptance, or Congo River deployment milestone published
delivery / Evidence reviewedBrazil / Dredging / Concession signed; 1 August operating transition remains scheduled, with the 13.3-metre baseline still controlling
mobilisation / Evidence reviewedPanama / Dredging / Market survey closed; potential public procurement anticipated before end-2026
planning / Evidence reviewedUAE / Marine utilities / PPA and EPC signed; cooling-water review and existing-plant tie-ins exposed, marine route unconfirmed
award / Evidence reviewedChile / Marine utilities / First desalinated water reached Radomiro Tomic during progressive commissioning; rated service and commercial operation remain open
commissioning / Evidence reviewedSaudi Arabia / Marine utilities / Project agreements, the L&T-Lantania EPC award and December 2025 financial close are evidenced, and ACWA's 3 March 2026 year-end report classifies the full 300,000 m3/day capacity as under construction; offshore mobilisation, installed intake or outfall geometry, first water and accepted production are not dated
construction / Evidence reviewedDenmark / Germany / Immersed tunnels and marine crossings / Second tunnel element immersed and connected; serial immersion, backfill, systems integration, and a two-stage road-then-rail opening remain active
construction / Evidence reviewedUnited States / Dredging and waterways / Callan Marine 44-foot package awarded; Great Lakes offshore Contract 6 in delivery; final 48-foot inland cut remains separate
construction / Evidence reviewedAustralia / Marine utilities / Intake tunnel and offshore piling complete; outfall tunnel and diffuser installation remained active after the original June 2026 marine-work window
construction / Evidence reviewedJordan / Marine utilities / Final technical and legal agreement signed; financial close still pending as of 7 July 2026
financing / Evidence reviewedMorocco / Marine utilities / Construction active; common marine, tunnelling, and electrical systems remain on the path to the February 2027 first-phase target
construction / Evidence reviewedFiji / Marine utilities / CW02 international prequalification open; Water Authority of Fiji lists a 28 August 2026 closing date
prequalification / Evidence reviewedJapan / Offshore energy / Design certification complete; base-port and offshore installation preparation active
construction / Evidence reviewedUAE / Marine utilities / Block A commissioned; remaining Phase 1 capacity in delivery
commissioning / Evidence reviewedCurrent research
Mumbai Port's INR 281.70 crore estimate covers three annual campaigns, not one production event. Each cycle has a 24-week completion clock and a 45-day TSHD mobilisation requirement, while the separate 2026-27 budget line, earlier Van Oord contracts, and historical quantities use different accounting and delivery boundaries.
Evidence updated
USACE dredging records are split between SAM.gov, the Navigation and Civil Works Decision Support Center, district engineering pages, DQM and local sponsor files. A solicitation, bid abstract, award, plant trace, hydrographic survey and acceptance record answer different questions.
Evidence updated
USACE's Newark Bay invitation for bids puts 237,945 cubic yards in six base dredging areas. Five optional areas add 196,485 cubic yards, while a separate option covers up to 300 short tons of debris.
Evidence updated
Central Coast Council's current Toukley concept keeps the seawater pump station beside the treatment site and sends a 2.4 km microtunnel to an intake about 1 km off Jenny Dixon Beach. Brine would use the existing Norah Head ocean outfall through a short connection.
Evidence updated
DEME will transport and install the 69 monopile foundations for Zeevonk's first 1 GW phase. Its contract also covers steel marshalling, intermediate monopile transport and a filter layer for scour protection. The owner still has to disclose the port, vessel spread and offshore start.
Evidence updated
An active harbour notice covers Sizewell C's treated-wastewater outfall and the temporary desalination intake and outfall. The CDO pipe pull was scheduled in April and the two desalination pipe pulls in June. Both operation-specific notices have since closed, while the wider three-line notice remains active.
Evidence updatedDelivery network
Federal port administrator and operator at Progreso / Port infrastructure owner and master-planning authority / Federal north-platform dredging and reclamation client
Evidence reviewed
Port of Southampton owner and operator / Statutory and competent harbour authority / Southampton VTS, pilotage and navigation-safety authority
Evidence reviewed
Regional water and wastewater utility / Toukley desalination planning owner and approval applicant / Prospective seawater-intake tunnel and offshore-caisson client
Evidence reviewed
Federal water authority and Rosarito project convener / First-module construction procurement and contracting authority / Client for seawater intake and brine-discharge works
Evidence reviewed
Hawar SWRO project owner and procuring authority / Offshore intake and outfall EPC client / Marine, treatment-plant and storage-package interface owner
Evidence reviewed
Ghubrah III project-company consortium lead and participant / Ghubrah III desalination-plant EPC contractor / Integrated intake, outfall, plant and commissioning delivery interface
Evidence reviewedSearch the public index for this delivery discipline, compare mapped projects, and use IMWO confidence labels before treating a signal as a tender, award, mobilisation, acceptance, or operating outcome.
Search Specialist marine works Open project tracker Open sector guide Review methodology