Project record

Dunkirk port cathodic-protection replacement framework

Participation
Requires review
Participation checked

The published 4 September 2026 bid deadline has passed; the latest buyer-profile result and framework holder remain unverified

Participation source

Consultation 26ANI002 covers underwater replacement of cathodic-protection systems on multiple Grand Port Maritime de Dunkerque structures. Its published deadline was 4 September 2026 at 12:00, with no time zone stated in the notice. The six-year single-provider framework specifies a EUR 1,500,000 excluding-VAT minimum and EUR 5,000,000 excluding-VAT maximum. The latest buyer-profile result, holder and structure-level call-offs remain unverified.

Aerial view of Dunkirk Port quays, berth structures and harbour water

Dunkerque-Port; operating-port context, not identified as a 26ANI002 structure or progress photograph

Location

France / Europe

Segment

Port structures and underwater asset maintenance

Phase

Tender / Confirmed

Last checked

15 October 2026

Coverage

Related sectors

Port structures and underwater asset maintenance is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Grand Port Maritime de Dunkerque, the state-owned Port of Dunkirk authority
Delivery parties
Single framework holder - latest award result unverified, Diving, inspection, cathodic-protection design, anode supply, marine plant, electrical testing and structure-specific lower tiers - not identified
Contract route
Open adapted procedure under internal consultation 26ANI002 and BOAMP notice 26-77562. The buyer describes a single-provider framework that may use follow-on contracts in the form of purchase orders, allows award without negotiation, prohibits variants and requires no mandatory visit. BOAMP flags the procurement as lotted but exposes only one lot description in the public notice; the controlled consultation documents should govern any finer lot boundary.
Execution window
The published 72-month term starts on the day after contract notification. The buyer may terminate at each anniversary with three months' notice and without compensation. The notification date, first call-off, mobilisation, structure sequence and completion programme remain unverified.
Works package
The published scope is underwater work to replace cathodic-protection systems on different Dunkirk port structures under CPV 45244000. The public notice does not identify the structures, corrosion survey baseline, steel areas, existing system type, anode composition or quantities, impressed-current equipment, cable and reference-electrode scope, coating interfaces, dive depth, access method, design life, testing method or acceptance criteria.
Marine interfaces
The opportunity sits at the submerged steel and electrical-protection interface of an operating port. Potential delivery gates include structure-specific condition verification, diving access and isolation, removal and installation methods, anode or impressed-current design, continuity and potential testing, navigation coordination and return of each asset to service. These are normal scope questions, not confirmed package allocations or methods in the cited notice.
Commercial evidence boundary
The EUR 1.5 million minimum and EUR 5.0 million maximum apply across the maximum six-year framework term. They do not identify annual spend, call-off count, structure quantities or allocation by diving, design, materials, marine plant and testing. The notice allows similar-work contracts under the stated legal route without identifying a specific package, value or party.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Framework procurement

26ANI002 underwater cathodic-protection replacement framework

Named party
Grand Port Maritime de Dunkerque
Evidence status
Confirmed
Source position
BOAMP records an open adapted procedure, 72-month duration and 4 September 2026 submission deadline. Source
Commercial envelope

Six-year single-provider framework

Named party
Holder unverified
Evidence status
Confirmed
Source position
The official notice fixes a EUR 1,500,000 excluding-VAT minimum and EUR 5,000,000 excluding-VAT maximum for the maximum term. Source
Physical works

Underwater replacement of cathodic-protection systems on port structures

Named party
Single framework holder unverified
Evidence status
Confirmed
Source position
The title and scope identify underwater cathodic-protection replacement on multiple port structures, while structure names and quantities remain unpublished. Source
Delivery chain and progress

Design, diving, materials, installation, testing and call-offs

Named party
No contractor or lower tier named
Evidence status
Not evidenced
Source position
The published deadline has passed. The latest buyer-profile result, holder, structure-level call-off, mobilisation, installed quantity, test and acceptance record remain unverified.

Evidence gap

What remains unverified

Outstanding evidence

  • Latest buyer-profile status after the published 4 September 2026 deadline
  • Framework awardee, contract notification date and any negotiation record
  • Clarification of the notice's lotted field and actual contract boundaries
  • First structure, call-off value and planned outage or access window
  • Existing cathodic-protection system, corrosion baseline and design responsibility
  • Named diving, anode, electrical-testing, survey and marine-plant parties
  • Installed quantities, potential measurements, continuity tests and acceptance
  • Framework call-off ledger, cumulative commitments and remaining ceiling

Reporting status

Project phase
Tender
Evidence confidence
Confirmed
Last checked
15 October 2026
Cited sources
5