Project record

Dunkirk port cathodic-protection replacement framework

Aerial view of Dunkirk Port quays, berth structures and harbour water

Dunkerque-Port; operating-port context, not identified as a 26ANI002 structure or progress photograph

Consultation 26ANI002 covers underwater works replacing cathodic-protection systems on multiple, unspecified Grand Port Maritime de Dunkerque structures. BOAMP records an open adapted procedure, a six-year single-provider framework, a EUR 1,500,000 excluding-VAT minimum and EUR 5,000,000 excluding-VAT maximum for the maximum term. Submission closes at 12:00 on 4 September 2026. The notice names no framework holder, diving contractor, cathodic-protection designer, anode supplier, inspection firm, vessel or structure-level call-off.

Project signal

Tender in France

Current status Grand Port Maritime de Dunkerque is procuring a six-year single-provider underwater-works framework with a EUR 1.5 million minimum and EUR 5.0 million maximum; bids close at 12:00 on 4 September 2026 and no holder is named Source confidence Confirmed

Location

France / Europe

Segment

Port structures and underwater asset maintenance

Status

Grand Port Maritime de Dunkerque is procuring a six-year single-provider underwater-works framework with a EUR 1.5 million minimum and EUR 5.0 million maximum; bids close at 12:00 on 4 September 2026 and no holder is named / Confirmed

Last checked

8 August 2026

Coverage

Related sectors

Port structures and underwater asset maintenance is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Grand Port Maritime de Dunkerque, the state-owned Port of Dunkirk authority
Delivery parties
Single framework holder - procurement open; no awardee named, Diving, inspection, cathodic-protection design, anode supply, marine plant, electrical testing and structure-specific lower tiers - not identified
Contract route
Open adapted procedure under internal consultation 26ANI002 and BOAMP notice 26-77562. The buyer describes a single-provider framework that may use follow-on contracts in the form of purchase orders, allows award without negotiation, prohibits variants and requires no mandatory visit. BOAMP flags the procurement as lotted but exposes only one lot description in the public notice; the controlled consultation documents should govern any finer lot boundary.
Execution window
A 72-month term would begin on the day after contract notification. The buyer may terminate at each anniversary with three months' notice and without compensation. No notification date, first call-off, mobilisation date, structure sequence or completion programme exists while the procurement remains open.
Works package
The published scope is underwater work to replace cathodic-protection systems on different Dunkirk port structures under CPV 45244000. The public notice does not identify the structures, corrosion survey baseline, steel areas, existing system type, anode composition or quantities, impressed-current equipment, cable and reference-electrode scope, coating interfaces, dive depth, access method, design life, testing method or acceptance criteria.
Marine interfaces
The opportunity sits at the submerged steel and electrical-protection interface of an operating port. Potential delivery gates include structure-specific condition verification, diving access and isolation, removal and installation methods, anode or impressed-current design, continuity and potential testing, navigation coordination and return of each asset to service. These are normal scope questions, not confirmed package allocations or methods in the cited notice.
Commercial evidence boundary
The EUR 1.5 million minimum and EUR 5.0 million maximum apply across the maximum six-year framework term. They do not identify annual spend, call-off count, structure quantities or allocation by diving, design, materials, marine plant and testing. Similar-work contracts may be procured under the stated legal route, but no such package, value or party has yet been published.

Contract and delivery chain

Named roles and open packages

Named appointments are shown against the workstream they cover. Unallocated packages remain open until a project source identifies the responsible party.

Framework procurement

26ANI002 underwater cathodic-protection replacement framework

Named party
Grand Port Maritime de Dunkerque
Status
Confirmed
Source position
BOAMP records an open adapted procedure, 72-month duration and 4 September 2026 submission deadline. Source
Commercial envelope

Six-year single-provider framework

Named party
Holder not selected
Status
Confirmed
Source position
The official notice fixes a EUR 1,500,000 excluding-VAT minimum and EUR 5,000,000 excluding-VAT maximum for the maximum term. Source
Physical works

Underwater replacement of cathodic-protection systems on port structures

Named party
Single framework holder to be selected
Status
Confirmed
Source position
The title and scope identify underwater cathodic-protection replacement on multiple port structures, while structure names and quantities remain unpublished. Source
Delivery chain and progress

Design, diving, materials, installation, testing and call-offs

Named party
No contractor or lower tier named
Status
Not evidenced
Source position
The procurement remains open and publishes no holder, structure-level call-off, mobilisation, installed quantity, test or acceptance record.

Evidence gap

What remains unverified

Outstanding evidence

  • Tender amendments and the 4 September 2026 submission gate
  • Framework awardee, contract notification date and any negotiation record
  • Clarification of the notice's lotted field and actual contract boundaries
  • First structure, call-off value and planned outage or access window
  • Existing cathodic-protection system, corrosion baseline and design responsibility
  • Named diving, anode, electrical-testing, survey and marine-plant parties
  • Installed quantities, potential measurements, continuity tests and acceptance
  • Framework call-off ledger, cumulative commitments and remaining ceiling

Reporting status

Tender, confirmed confidence

Last checked 8 August 2026 across 5 cited sources. The dated timeline above carries the project events.

Last checked 8 August 2026 Cited sources 5