Market signal
Dredged-material placement research visible
Sector intelligence
General waterside civil works, marine access, temporary works, quay interfaces, and specialist packages supporting coastal and port programmes.
This controlled sector is a parent research lens. Projects retain their detailed work segment and can appear in more than one sector where the documented scope crosses delivery disciplines.
Dredged-material placement research visible
77 project records connected to this sector.
85 current analyses and briefs connect through governed project relationships.
50 public profiles connect through documented project roles.
Project coverage
India / Dredging / Tender E.47/2026 remains open; bids due 6 August 2026 after two corrigenda
tender / Evidence reviewedNetherlands / Dredging / Named and launched on 3 October 2025; latest reviewed owner update still described construction as ongoing on 5 March 2026; delivery and service entry remain unconfirmed
delivery / Evidence reviewedBurundi / Marine infrastructure / Ongoing at programme level; March 2025 remains the latest quantitative Phase I physical-progress baseline
construction / Evidence reviewedUnited States / Port infrastructure / USACE lists four current federal-standard placement routes; Alabama Code Section 33-7-13 takes effect on 1 October 2026
delivery / Evidence reviewedUnited States / Dredging and waterways / IFB W912DS26BA027 open; 237,945 CY in the base dredging CLINs; bids due 31 July 2026; no award or mobilisation recorded
tender / Evidence reviewedAustralia / Port infrastructure / MGN Civil holds the surge-protection breakwater award; wider dredging, berth and tug-harbour packages remain separately unconfirmed
award / Evidence reviewedTonga / Port infrastructure / World Bank's revised procurement plan marks MOI-WK2-13 under implementation; contractor, contract value, notice to proceed and site mobilisation remain publicly unconfirmed
award / Evidence reviewedGermany / Port infrastructure / Sand reclamation is active behind the new quay line; phased terminal delivery runs through 2028
construction / Evidence reviewedNetherlands / Offshore wind foundations / DEME holds the transport and installation contract for 69 monopile foundations; offshore mobilisation has not been announced
award / Evidence reviewedBenin / Port infrastructure / The port authority reports 69% physical progress and 72% overall progress, while its published 2021-2024 delivery period is no longer current
construction / Evidence reviewedEgypt / Deep-water ports and container terminals / Commercial operations began on 14 February 2026; the terminal is moving through its 2026 ramp-up and the 3.3 million TEU figure remains final design capacity
commissioning / Evidence reviewedVietnam / Deep-water ports and container terminals / Investor consortium approved on 11 April 2026; environmental approval, land and water handover, marine works award and physical mobilisation remain unannounced
approval / Evidence reviewedGhana / Port infrastructure / PIDG capital committed; financial close and construction start still to be confirmed
financing / Evidence reviewedSingapore / Port infrastructure / Owner reports Phase 2 reclamation at 79.5% as of December 2025; its March 2026 target for handing six completed berths to PSA remains unverified, while current marine notices confirm active delivery
delivery / Evidence reviewedBrazil / Dredging and waterways / World Bank project is Active and Board Approved; the April 2026 procurement plan omits the Itajaí-Mirim main works package
approval / Evidence reviewedUnited States / Dredging / Three preliminary bids opened for MFP-364.003; evaluation and award remain pending
evaluation / Evidence reviewedUnited States / Dredging and waterways / Callan Marine dredging has reached the Gulf Intracoastal Waterway junction; the Navigation District says the next work front is the harbor and turning basin
construction / Evidence reviewedUnited States / Dredging and waterways / IFB amendment 0007 posted 16 July 2026; bids closed 17 July; no award or notice to proceed posted
tender / Evidence reviewedUnited States / Port infrastructure / Updated full-and-open RFP issued 15 July 2026; proposals due 14 August 2026; no award or mobilisation recorded
tender / Evidence reviewedNorfolk Island / Dredging and waterways / Rock revetment contractor appointed; the separate channel-dredging and pier-repair package was released to tender on 14 May 2026
tender / Evidence reviewedBangladesh / Port infrastructure / IDA financing effective since 8 December 2025; marine studies are nearing completion, but works and the terminal-operator RFP have not started
design / Evidence reviewedBrazil / Port infrastructure / Jan De Nul contract signed on 12 June 2026; official mobilisation, production and acceptance evidence remain ahead
award / Evidence reviewedIndia / Port infrastructure / Fifteen-year charter awarded on 30 June 2026; construction, delivery, port acceptance and service commencement remain ahead
award / Evidence reviewedAustralia / Port infrastructure / Owner-defined cutter-suction campaign scheduled from July to October 2026; contractor and mobilisation remain unconfirmed
approval / Evidence reviewedNauru / Port infrastructure / ADB still lists the project as active. Its July 2026 monitoring report records 78% dredging, 97% of the northern-yard interim apron complete and all buildings handed over at the end of June 2025, while the current project page still lists full dredging and buildings among awaited items
construction / Evidence reviewedIndonesia / Port infrastructure / Phase 1-1 is completed and partly operating; Package 5 car-terminal and Package 6 container-terminal works remained active through June 2025; Package 7 construction lacks a current owner or contractor mobilisation date
construction / Evidence reviewedUnited Kingdom / Dredging / Marine licence MLA/2026/00178 remains submitted and open for consultation; the principal-contractor participation stage closed on 6 February 2026 and no award notice is published in the reviewed procurement family
approval / Evidence reviewedIndia / Dredging / The Government of India reports Phase VI complete and Kamarajar operating at 18.0 metres draft; the post-dredge survey sheet and a first fully laden Capesize call are not published
completed / Evidence reviewedNigeria / Deep-water ports and container terminals / MSC signed a 45-year sub-concession and finalized the ITB/DEME EPC on 11 March 2026; the reviewed project sources do not record mobilisation
award / Evidence reviewedTonga / Port infrastructure / AIFFP and Ports Authority Tonga confirmed all marine and civil works complete and operational on 5 November 2025
completed / Evidence reviewedComoros / Port infrastructure / World Bank and AfDB implementation records confirm works are under way; the contractor's current target is 11 August 2027
construction / Evidence reviewedIndia / Dredging / The open tender closed on 16 March 2026; no award, work order or mobilisation is identified
tender / Evidence reviewedIreland / Port infrastructure / Marine construction is active; the 2026 harbour notice keeps the buoyed work zone in place through January 2027, while berth acceptance and service release remain open
construction / Evidence reviewedCanada / Port infrastructure / TerraMarine is preferred proponent; contract negotiations and development work precede any target-price design-build agreement, financial close or mobilisation
design / Evidence reviewedUnited States / Port infrastructure / USACE scheduled MURDEN to work through May 2026; measured production and completion remain unpublished
construction / Evidence reviewedUnited Kingdom / Port infrastructure / PQQ closed on 1 May 2026; no shortlist, ITT or award notice is present in the reviewed public chain
prequalification / Evidence reviewedUnited States / Port infrastructure / Curtin Maritime's DB Avalon was operating in the Patapsco River on 16 June 2026
construction / Evidence reviewedUnited States / Port infrastructure / Mechanical dredging began in late May 2026 and is scheduled to continue through August
construction / Evidence reviewedUnited States / Port infrastructure / USACE reports the first phase nearing completion and a 450-foot second phase continuing through November 2026
construction / Evidence reviewedBelgium / Dredging / 22,000 m³ TSHD ordered; China hull build, Singapore completion, trials, and 2029 delivery remain pending
delivery / Evidence reviewedUnited States / Port infrastructure / USD 14.9 million phase-two award confirmed; construction planned from summer 2026 through 2028
award / Evidence reviewedUnited States / Port infrastructure / USD 2.3 million Ryba award confirmed; field start scheduled from 18 July 2026
award / Evidence reviewedUnited Kingdom / Dredging / Award decision published to Boskalis Westminster; contract signature and start not evidenced
award / Evidence reviewedUnited States / Port infrastructure / Outer harbor dredging and ERDC placement monitoring active
construction / Evidence reviewedMexico / Dredging / Initial state dredging phase completed and a separate private berth stage is active; the federal 40 ha north-platform construction-dredging tender was declared void on 8 July 2026, with no rebid confirmed
tender / Evidence reviewedDemocratic Republic of the Congo / Dredging / Easydredge 2700XL building contract signed; no yard, trial, delivery, acceptance, or Congo River deployment milestone published
delivery / Evidence reviewedSão Tomé and Príncipe / Marine infrastructure / AfDB financing signed and three site-level safeguard packages disclosed; design-supervision and works awards remain unverified
financing / Evidence reviewedJordan / Port infrastructure / DFBOT proposals due 17 August 2026
tender / Evidence reviewedBrazil / Dredging / Concession signed; 1 August operating transition remains scheduled, with the 13.3-metre baseline still controlling
mobilisation / Evidence reviewedUnited States / Port infrastructure / USD 11.7 million award confirmed; no 2026 field execution is documented
award / Evidence reviewedIndia / Port infrastructure / Greenfield port under construction; capital-deepening package awarded, mobilisation unconfirmed
award / Evidence reviewedCanada / Port infrastructure / Site preparation under way; a quay-wall crane is installed and the owner recorded a 13-15 July sheet-pile delivery window, but the works log still does not evidence pile driving, dredger mobilisation, or accepted vessel access
construction / Evidence reviewedUnited Kingdom / Port infrastructure / Construction contract awarded; site preparations commenced
construction / Evidence reviewedUnited States / Port infrastructure / USD 3.587 million award; July 2026 start expected but mobilisation remains unconfirmed
award / Evidence reviewedUAE / Port infrastructure / AED 84 million Newcastlemax upgrade agreed; design, package awards and delivery remain open
award / Evidence reviewedPanama / Dredging / Market survey closed; potential public procurement anticipated before end-2026
planning / Evidence reviewedPhilippines / Port infrastructure / AIIB loan approved; three terminal programmes active on separate schedules
construction / Evidence reviewedSyria / Port infrastructure / Operations active; modernisation equipment mobilising
early works / Evidence reviewedSpain / Port infrastructure / Main quay works under construction after the Q4 2024 start
construction / Evidence reviewedMadagascar / Marine infrastructure / IDA financing signed; marine packages are planned, under review, pending, cancelled, or absent from the reviewed plan
approval / Evidence reviewedArgentina / Port infrastructure / Concession signed; operating transfer complete and August maintenance mobilisation remains to be evidenced
mobilisation / Evidence reviewedAustralia / Port infrastructure / A$50 million dredging contract awarded; federal sea-dumping application remains an open evidence gate before September mobilisation
award / Evidence reviewedNetherlands / Port infrastructure / Phase A tug quay complete; Phase B inland-shipping quay started; Phase C dredging remains a post-2028 package
construction / Evidence reviewedSweden / Port infrastructure / Dredging contract signed for 2027 start
award / Evidence reviewedIndia / Deep-water ports, dredging and reclamation / The approximately 200-hectare nearshore reclamation and shore-protection EPC package is awarded; as of 15 July 2026, the owner tender page lists the offshore dredging, reclamation and protection-bund HAM package closing on 17 July and the Daman marine-sand investigation closing on 15 July, while no award or AOC is published for either package or for the 10.14-kilometre offshore breakwater
tender / Evidence reviewedDemocratic Republic of the Congo / Deep-water ports and container terminals / Phase-one marine and terminal works are under way; the DRC government was still pressing for acceleration in May 2026, so the previously stated 2026 delivery and first-vessel dates remain targets rather than evidence of accepted operation
construction / Evidence reviewedSenegal / Deep-water ports and container terminals / Marine works and container-terminal construction are active; the access channel, reclamation, quay and terminal packages remain under delivery, while 2028 is a government operating target rather than an accepted opening date
construction / Evidence reviewedBelgium / Port infrastructure / Quay-wall construction and marine works in progress
construction / Evidence reviewedDenmark / Germany / Immersed tunnels and marine crossings / Second tunnel element immersed and connected; serial immersion, backfill, systems integration, and a two-stage road-then-rail opening remain active
construction / Evidence reviewedItaly / Ports and coastal protection / 24 caissons installed and the first kilometre passed; seabed foundation, superstructure, dredging, and navigation-opening gates remain active
construction / Evidence reviewedUnited States / Dredging and waterways / Callan Marine 44-foot package awarded; Great Lakes offshore Contract 6 in delivery; final 48-foot inland cut remains separate
construction / Evidence reviewedIraq / Port infrastructure / Core marine assets built; terminal, tunnel, and commercial-operating interfaces remain under verification
construction / Evidence reviewedQatar / Port infrastructure / Owner reports 98% construction; full-system handover pending
construction / Evidence reviewedSweden / Port infrastructure / Quay construction active; port-side dredging awarded; optimized national fairway package in procurement for 2027-2028 delivery
construction / Evidence reviewedTunisia / Port infrastructure / Dredging contract signed; enabling and supervision sequence forming
award / Evidence reviewedAustralia / Port infrastructure / Marine reference design, investigations, environmental-review preparation, and construction planning active; Westport Bill remains before Parliament
design / Evidence reviewedTuvalu / Port infrastructure / Nui and Niutao harbour works completed and opened; operating performance and maintenance now under review
completed / Evidence reviewedCurrent research
Mumbai Port's INR 281.70 crore estimate covers three annual campaigns, not one production event. Each cycle has a 24-week completion clock and a 45-day TSHD mobilisation requirement, while the separate 2026-27 budget line, earlier Van Oord contracts, and historical quantities use different accounting and delivery boundaries.
Evidence updated
Mobile Harbor produces roughly 6 million cubic yards of dredged material in a typical year. USACE recognizes thin-layer placement inside its sediment strategy, while Alabama's law taking effect on 1 October counts public-water placement only when it forms part of shoreline restoration or marsh creation.
Evidence updated
USACE dredging records are split between SAM.gov, the Navigation and Civil Works Decision Support Center, district engineering pages, DQM and local sponsor files. A solicitation, bid abstract, award, plant trace, hydrographic survey and acceptance record answer different questions.
Evidence updated
USACE's Newark Bay invitation for bids puts 237,945 cubic yards in six base dredging areas. Five optional areas add 196,485 cubic yards, while a separate option covers up to 300 short tons of debris.
Evidence updated
Mid West Ports has awarded MGN Civil the surge-protection breakwater at Geraldton. The award sits ahead of the separately described dredging, reclamation, berth and tug-harbour works in the approved Port Maximisation Project.
Evidence updated
Tonga's current Nafanua Port package combines entrance-breakwater repair and extension, a new small-boat berth and a new passenger terminal. A revised World Bank procurement plan marks the package under implementation after earlier separate packages were cancelled.
Evidence updatedDelivery network
Federal port administrator and operator at Progreso / Port infrastructure owner and master-planning authority / Federal north-platform dredging and reclamation client
Evidence reviewed
Port of Southampton owner and operator / Statutory and competent harbour authority / Southampton VTS, pilotage and navigation-safety authority
Evidence reviewed
National maritime, inland-waterway and port authority / Bujumbura Port public owner and programme counterparty / Protective-dike, dredging, quay and marine-dock owner interface
Evidence reviewed
Damietta Port authority and common-infrastructure custodian / Entrance-channel, breakwater, basin and navigational-access authority / Container Terminal II quay-wall, excavation and dredging client
Evidence reviewed
Ardersier Energy Transition Facility owner and developer / Phase 2 dredging client and contracting authority / Quay-wall, quayside-civils and landside package sponsor
Evidence reviewed
Geraldton Port and Fishing Boat Harbour operator / Port-reserve, berth, channel and marine-asset custodian / Geraldton Port Maximisation Project proponent and works client
Evidence reviewedSearch the public index for this delivery discipline, compare mapped projects, and use IMWO confidence labels before treating a signal as a tender, award, mobilisation, acceptance, or operating outcome.