Location
Italy / Europe
Project record
The Western Ligurian Sea Port Authority is moving Genoa's main breakwater seaward through a deep-water caisson system founded as far as 50 metres below sea level. Webuild reported the 24th caisson installed on 14 June 2026, five days after the works passed the first kilometre. Those are material production milestones, but the usable port-access outcome still depends on foundation completion, caisson and superstructure continuity, dredging, interfaces with the existing breakwater, and accepted navigation geometry.
Italy / Europe
Ports and coastal protection
24 caissons installed and the first kilometre passed; seabed foundation, superstructure, dredging, and navigation-opening gates remain active / Confirmed
15 July 2026
Coverage
Ports and coastal protection is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.
Subject index
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Project anatomy
Project timeline
Dated events that changed scope, counterparties, delivery, commissioning or operating status.
Open this project in the Change LogThe record advances the repeatable tow-out and controlled-sinking work front to 24 installed units, while foundation completion, caisson-line continuity, filling, armour, superstructure, dredging, and navigation acceptance remain separate gates.
SourceThe caisson alignment exceeded one kilometre while seabed consolidation continued. The milestone does not show proportional overall completion, an accepted entrance or an operational navigation route.
SourceThe update records 15 installed caissons, more than 50,000 gravel columns, reported 79 percent foundation-column progress and 87 percent seabed gravel placement at that date. Foundation monitoring and downstream structural and navigation gates remained open.
SourceThe owner record moves the project from caisson fabrication into offshore placement and documents the first completed tow, sinking, and positioning cycle, without proving repeat production, connected superstructure, or usable port access.
SourceThe Port Authority and consortium launch record marks the transition from award and executive design into construction. Its original scope and schedule statements remain dated baseline context rather than current completion evidence.
SourceEvidence gap