Nigeria Snake Island Container Terminal concession and EPC

Aerial view of the existing Snake Island Port and free-zone waterfront in Lagos Harbour

Snake Island Integrated Free Zone

MSC has taken a 45-year sub-concession for a new container terminal at Snake Island Port in Lagos and finalized an EPC contract with ITB Nigeria and DEME. The stated design has a 910-metre quay, a 30-hectare yard and initial dredging to -16.5 m chart datum, with provision for a later -18 m depth.

Project signal

Award in Nigeria

Treat the March 2026 sub-concession and EPC as contract milestones, not evidence of construction. Keep the 30-hectare MSC container terminal separate from the earlier 85-hectare, three-terminal Snake Island Port masterplan, and do not combine ICRC's USD 974.19 million project cost with the separate USD 1 billion statements from NPA and MSC.

Current status MSC signed a 45-year sub-concession and finalized the ITB/DEME EPC on 11 March 2026; the reviewed project sources do not record mobilisation Source confidence Confirmed

Location

Nigeria / Africa

Segment

Deep-water ports and container terminals

Status

MSC signed a 45-year sub-concession and finalized the ITB/DEME EPC on 11 March 2026; the reviewed project sources do not record mobilisation / Confirmed

Evidence reviewed

18 July 2026

Controlled taxonomy

Related sectors

The detailed segment above is the primary work classification. These broader sector links connect the project to related delivery and market research.

Knowledge context

Related knowledge topics

Continue through the topic collections to compare this record with related projects, evidence guides, briefs, articles, reports, and performance records.

Project anatomy

Scope, counterparties, and execution logic

Client / authority
Nigerdock and Snake Island Integrated Free Zone, under Nigerian Ports Authority oversight
Delivery parties
ITB Nigeria Ltd., DEME Group
Contract route
Nigeria's Federal Executive Council approved the wider Snake Island Port PPP in May 2023 at a stated USD 974.19 million for 45 years, with Nigerdock and Snake Island Integrated Free Zone as concessionaire. NPA said in June 2025 that an agreement for the port's USD 1 billion development had been finalized. MSC then announced on 11 March 2026 that it had signed a 45-year sub-concession with Nigerdock for the container terminal and finalized an EPC contract with ITB Nigeria and DEME. The published record does not give the EPC value or show an open downstream procurement.
Execution window
The public timeline runs from federal PPP approval in May 2023 through NPA's development-agreement statement in June 2025 to MSC's sub-concession and EPC announcement in March 2026. The official material reviewed for this entry gives no notice-to-proceed date, mobilisation date, construction duration or opening target for the new container terminal.
Works package
MSC describes a 30-hectare container yard with expansion space, a 910-metre quay for ship-to-shore and mobile harbour cranes, barge and deep-sea vessel service, hybrid rubber-tyred gantries, initial dredging to -16.5 m chart datum and a scalable final depth of -18 m. This is a defined container-terminal package within the wider 2023 Snake Island Port plan, which ICRC described as 85 hectares, three terminals, 2.5 km of quay, six ship berths, nine barge berths and drafts ranging from 6 m to 16 m.
Marine interfaces
Snake Island already supports port, free-zone and shipyard activity across the channel from Apapa and Tin Can Island. The new terminal therefore has to join a live harbour system: capital dredging, quay construction, barges, deep-sea vessel access, yard formation and terminal equipment must be coordinated with existing traffic and the maintained navigation channel. Existing ship calls at Snake Island Port are not proof that the new MSC container terminal has been built or opened.
Commercial read
The concessionaire and EPC team are named, so this is no longer an open prime-contract pursuit. ITB, DEME, MSC, Nigerdock or NPA still need to publish subcontract notices, plant mobilisation, survey work, dredging and piling packages, equipment orders or a formal construction release. Until then, supplier positioning around hydrography, geotechnics, marine plant, piles, fenders, bollards, dredged-material management and terminal systems remains prospective rather than awarded work.
Next milestone
Obtain a project-specific notice to proceed or mobilisation record, then follow baseline bathymetry and geotechnical work, dredger and piling-plant assignment, environmental controls and the first accepted marine construction quantities.

Material change register

What changed, when, and what it proves

Only source-bound events that alter phase, scope, counterparties, delivery, completion, commissioning, or acceptance are listed. A change can advance the record without proving the next gate.

MSC signed the sub-concession and finalized the EPC

The container-terminal package now has a 45-year commercial structure, named EPC parties and defined design geometry. The announcement does not establish a work start or operating date.

Read controlling source

NPA reported the development agreement finalized

NPA placed the wider port development on an 85-hectare site and used a USD 1 billion development figure. No EPC value, construction programme or physical progress record was included.

Read controlling source

Federal Executive Council approved the wider port PPP

The approval established a 45-year, USD 974.19 million multipurpose-port framework for Nigerdock and SIIFZ. ICRC said projects would still proceed to commercial close before commencement.

Read controlling source

Delivery watch

Evidence needed next

Obtain a project-specific notice to proceed or mobilisation record, then follow baseline bathymetry and geotechnical work, dredger and piling-plant assignment, environmental controls and the first accepted marine construction quantities.

Decision watchpoints

  • Notice to proceed, construction programme and project-specific mobilisation
  • Baseline hydrography, geotechnical investigation and dredging quantities
  • Environmental permits and dredged-material disposal or reuse route
  • Quay foundation, piling, reclamation and yard formation sequence
  • Responsibility for the shared navigation channel and later -18 m deepening
  • Crane, RTG, power, barge and landside-system integration
  • Depth acceptance, berth commissioning and first sustained container service

Project availability status

This public project page is a tracked market record rather than a tender notice, contractual commitment, or commercial instruction. Use the status, confidence label, evidence-review date, and source note together when judging how much weight to place on the signal.

Read featured analysis Review methodology Submit stronger evidence or a correction Open project tracker

Record control

Evidence reviewed date is not a project-event date.

IMWO changes phase, participants, scope, completion, or acceptance wording only when a dated source establishes the change. The review date records when the evidence set was checked; it does not claim that physical work changed on that date.

Evidence reviewed 18 July 2026 Sources in this record 5

Source record

MSC controls the 11 March 2026 sub-concession, EPC parties and the 910-metre, 30-hectare, -16.5 m and -18 m design statements. ICRC controls the 2023 federal approval, USD 974.19 million cost and broader 85-hectare multipurpose-port geometry. NPA's June 2025 review describes a USD 1 billion development agreement, while MSC says the terminal forms part of its Nigeria infrastructure and logistics investments totaling more than USD 1 billion; those statements are source-specific and are not presented as one verified contract value. SIIFZ's current history distinguishes existing port operations from the 2026 container-terminal sub-concession. The available project record contains no notice to proceed, construction mobilisation, dredging production, quay progress, accepted depth or terminal opening.

Phase: award. Evidence reviewed: 18 July 2026.

Project sources 5