Oman eTender 441/2023/MAFWR/HQ-36 reached financial evaluation in Q3 2023, then a Recall-1 procedure closed on 19 December 2023; an awardee, value and mobilisation remain undisclosed
Tender 441/2023/MAFWR/HQ-36 launched a maintenance-dredging procurement for Liwa Fishery Harbour. The official Q3 2023 workbook placed the original procedure in financial evaluation. A subsequent Recall-1 listing set a 19 December 2023 deadline, so the earlier evaluation snapshot cannot establish a terminal award. A contractor, value, dredging quantity, target depth, sediment route, mobilisation, completion and acceptance remain undisclosed.
Operating fishing-port maintenance dredging is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.
Subject index
Related subjects
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Project anatomy
Contract scope and delivery roles
Client / authority
Oman Ministry of Agriculture, Fisheries and Water Resources
Delivery parties
Maintenance-dredging contractor - no public awardee named, Hydrographic survey, dredging plant, sediment transport and disposal lower tiers - not identified
Contract route
Open Oman eTender 441/2023/MAFWR/HQ-36 was published in June 2023 and recorded in financial evaluation in the official Q3 workbook. A Recall-1 listing subsequently set a 19 December 2023 deadline. The workbook predates the recall and contains no supplier or value; a later official award notice has not been located.
Execution window
The original notice was published in June 2023 with an August 2023 bid deadline. The recalled procedure closed on 19 December 2023. Evaluation completion, award, contract signature, notice to proceed, mobilisation, dredging start, survey dates, completion and acceptance remain unpublished.
Works package
The public title confirms dredging work at the operating Liwa Fishery Harbour. Published notices do not expose dredged volume, basin or approach extents, design depth, survey datum, sediment characteristics, disposal or beneficial-use destination, environmental controls, production method, plant requirements or acceptance tolerances.
Marine interfaces
Any maintenance campaign must be sequenced around operating fishing-vessel access, harbour-basin and entrance conditions, hydrographic control, navigation notices, sediment handling and owner acceptance. The public record does not identify closure windows, temporary navigation arrangements, environmental monitoring or the interface with the port's quays, pontoons and breakwaters.
Commercial evidence boundary
No tender estimate, bid range, award value, measured quantity, variation or final account has been disclosed. The original financial-evaluation status and recalled notice cannot be converted into an awarded contract, and historical construction values do not price the maintenance package.
Contract and delivery chain
Work packages and named roles
Published scope, named parties and supporting evidence for each workstream.
Original procurement
441/2023/MAFWR/HQ-36 dredging work at Liwa Fishery Harbour
Named party
Oman Ministry of Agriculture, Fisheries and Water Resources
Evidence status
Confirmed
Source position
The official Q3 2023 Oman eTender workbook records the open procedure in financial evaluation and names no winner or value. Source
Recalled procurement
441/2023/MAFWR/HQ-36 - Recall - 1
Named party
Oman Ministry of Agriculture, Fisheries and Water Resources
Evidence status
Confirmed
Source position
A public tender listing records Recall-1 with a 19 December 2023 deadline, superseding any assumption that the Q3 financial-evaluation status was terminal. Source
Award and delivery
Contract, mobilisation, dredging and acceptance
Named party
No contractor publicly verified
Evidence status
Not evidenced
Source position
An awardee, value, dredging scope, mobilisation, completion and acceptance have not been disclosed.
Evidence gap
What remains unverified
Outstanding evidence
Official Recall-1 notice, tender documents and reason for recall
Award, cancellation or retender decision
Contractor, signed value, duration and notice to proceed
Dredging quantity, design depth and hydrographic datum
Dredger, survey spread, support craft and lower tiers
Sediment testing, environmental controls and disposal route
Fishing-vessel access and temporary navigation plan
Completion survey, navigation release and owner acceptance