Castle Point Borough Council seeks an experienced contractor to dredge Canvey Lake in Essex. EPP0391 sets a £1 million budget excluding VAT and scores technical quality at 95% and social value at 5%. Current owner plans connect dredging to temporary lagoons, dewatering, off-site disposal and reinstatement.
Dredging is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.
Subject index
Related subjects
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Project anatomy
Contract scope and delivery roles
Client / authority
Castle Point Borough Council
Delivery parties
Contractor selection under EPP0391
Contract route
Castle Point uses a below-threshold open competition. UK4 notice 093052-2026, amended 1 October, sets 2 November 2026 at 12:00 UTC as the submission deadline. Technical quality 95%; social value 5%; three independent technical scorers followed by consensus. The current pack is on Open behind supplier login. The 1 October amendment moved the updated specification into that pack. The official mirror has a summary/body deadline discrepancy, leaving participation under review.
Execution window
FTS contract period: 4 January-4 October 2027, extendable to 4 January 2028 if needed to complete the works. The council expects dredging in January-March 2027, subject to Flood Risk Activity Permit approval, followed by April ground reinstatement.
Works package
Lake dredging within a fixed £1 million ex-VAT budget (£1.2 million including VAT). The owner proposes temporary on-site lagoons, dewatering and vacuum-tanker removal for off-site disposal. Its approximately 42,000 m³ survey estimate is whole-lake silt inventory; the current specification determines the selected removal extent. Water testing and aquatic planting have a separate £144,000 budget over three years and seven months.
Marine interfaces
This inland hydraulic work serves a lake created for flood management and fed by rainwater and surface runoff. Lagoon footprint, site access and temporary public-path closures connect sediment removal to the surrounding ground and drainage system. The council identifies dredging permit approval as a programme condition.
Commercial evidence boundary
AGA classifies the represented sediment as non-hazardous under code 17 05 06, while its tests fail the inert-landfill acceptance criteria for organic carbon, chloride and dissolved solids. Its recommended route requires a suitably permitted non-hazardous receiver and facility-specific acceptance. The fixed budget must accommodate material handling, wet loads and the agreed disposal route alongside excavation; the public notice gives no unit dredging rate.
Contract and delivery chain
Work packages and named roles
Published scope, named parties and supporting evidence for each workstream.
Procurement
EPP0391 fixed-budget dredging
Named party
Castle Point Borough Council
Evidence status
Confirmed
Source position
The amended UK4 record sets £1 million excluding VAT, technical quality 95%, social value 5% and a 2 November 2026 at 12:00 UTC submission deadline. Source
Material characterisation
Represented dredging spoil and facility acceptance
Named party
A.G.A. Group Consultancy Ltd
Evidence status
Confirmed
Source position
August WM3 classification assigns code 17 05 06 to represented sediment. July testing fails inert-landfill acceptance; the receiving non-hazardous facility must apply its own procedures. Source
Proposed delivery
Lagoons, vacuum-tanker removal and reinstatement
Named party
Castle Point Borough Council; delivery contractor to be selected
Evidence status
Confirmed
Source position
The current owner FAQ proposes temporary lagoons and dewatering before vacuum-tanker removal. It expects January-March dredging subject to FRAP and April reinstatement. Source
Evidence gap
What remains unverified
Outstanding evidence
Current Open tender pack, latest clarifications and confirmation of the submission deadline