Project record

Fox Island River channel-wall and marginal-wharf reconstruction

Aerial visualization of Fox Island River marginal wharf reconstruction with steel sheet piling, a reinforced concrete deck and reinstated shoreline protection

IMWO artist's impression of the published Fox Island River channel-wall and marginal-wharf reconstruction scope

Fisheries and Oceans Canada proposes to demolish and replace Fox Island River's northeastern marginal wharf. The federal record describes a steel-sheet-pile structure, reinforced concrete deck, parking-area renewal, shoreline protection, jib crane, light pole and electrical shed. The public-comment period has closed, but the assessment remains in progress and no delivery contract is public.

Project signal

Approval in Canada

Current status DFO-SCH's 2026 proposal remains in federal assessment after the public-comment period ended on 22 June 2026; no environmental determination, procurement, award, contractor, mobilisation or construction is evidenced Source confidence Confirmed

Location

Canada / North America

Segment

Small-craft-harbour marginal wharf and channel-wall renewal

Status

DFO-SCH's 2026 proposal remains in federal assessment after the public-comment period ended on 22 June 2026; no environmental determination, procurement, award, contractor, mobilisation or construction is evidenced / Confirmed

Last checked

9 August 2026

Coverage

Related sectors

Small-craft-harbour marginal wharf and channel-wall renewal is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Fisheries and Oceans Canada - Small Craft Harbours
Delivery parties
Future design, demolition, sheet-pile, concrete, electrical, crane and shoreline-protection parties - not identified, Marine Contractors Inc and R.J.G Construction Limited - confirmed only on separate earlier Fox Island River contracts; no 2026 role evidenced
Contract route
No works procurement or award was identified. The project is a federal-lands assessment led by Fisheries and Oceans Canada with Transport Canada as an authority. The public-comment period ran from 22 May to 22 June 2026; a determination and any subsequent procurement remain open.
Execution window
The assessment started on 22 May 2026 and the public-comment period closed on 22 June 2026. No determination date, tender programme, construction start, in-water window, completion target or handover date has been published.
Works package
The proposed project includes demolition, removal and replacement of the northeastern marginal wharf; replacement of the asphalt parking area; removal and re-installation of shoreline protection; and installation of a jib crane, light pole and electrical shed. The existing wharf is described as steel sheet-pile walls with tie rods, concrete blocks and rock fill. The replacement is expected to use a similar sheet-pile form topped with reinforced concrete slabs.
Marine interfaces
The future work must manage demolition beside an operating small-craft harbour, excavation of the existing wharf footprint and parking area, temporary removal and reinstatement of shoreline armour, sheet-pile and tie-rod installation, concrete deck construction, crane and electrical interfaces, navigation access and environmental controls. Temporary works, piling plant, berth closures and acceptance criteria are not published.
Commercial evidence boundary
The assessment page and navigation notice publish no budget, cost estimate, contract value, funding release, procurement reference or supplier. Any value or contractor attribution would be speculative.

Contract and delivery chain

Named roles and open packages

Named appointments are shown against the workstream they cover. Unallocated packages remain open until a project source identifies the responsible party.

Environmental review

Impact Assessment Registry project 90484

Named party
Fisheries and Oceans Canada - Small Craft Harbours
Status
Confirmed
Source position
The federal registry lists the assessment as in progress and records the public-comment period closing on 22 June 2026. Source
Wharf civil works

Northeastern marginal-wharf demolition and replacement

Named party
Not appointed
Status
Confirmed
Source position
The assessment describes replacement steel sheet piling, reinforced concrete slabs, parking-area renewal and shoreline protection but names no delivery contractor. Source
Harbour equipment and utilities

Jib crane, light pole and electrical shed

Named party
Not appointed
Status
Confirmed
Source position
The equipment and utility elements are in the official assessment scope; suppliers and detailed interfaces are not published. Source
Navigation review

Registry 15065 / NPP file 2026-217017

Named party
Fisheries and Oceans Canada and Transport Canada
Status
Confirmed
Source position
DFO's notice identifies a commercial-dock worksite at Fox Island River and invites navigation comments. Source
Construction delivery

Demolition, piling, concrete, shoreline reinstatement and commissioning

Named party
Not evidenced
Status
Not evidenced
Source position
No tender, award, contractor, mobilisation or physical progress record was found.

Project timeline

Material developments

Dated events that changed scope, counterparties, delivery, commissioning or operating status.

Open this project in the Change Log

Federal public-comment period closed

The assessment moved beyond public comments but remains in progress; a federal determination and delivery procurement are still open.

Source

DFO published the navigation notice

Registry 15065 and NPP file 2026-217017 fix the commercial-dock location and navigation-review identity but do not establish environmental approval, procurement or construction.

Source

Federal assessment and comment period opened

The federal assessment opened with a disclosed marginal-wharf, sheet-pile, shoreline, crane and electrical scope while contractor, value and delivery dates remained unset.

Source

Evidence gap

What remains unverified

Outstanding evidence

  • Federal environmental determination after the closed comment period
  • Reconciliation of the channel-wall title and marginal-wharf scope wording
  • Issued design and procurement reference
  • Budget, estimate, funding and contract value
  • Prime contractor and sheet-pile, concrete, crane, electrical and shoreline lower tiers
  • Temporary works, harbour access and navigation restrictions
  • Demolition and sheet-pile mobilisation
  • Owner acceptance, berth reopening and final account

Reporting status

Approval, confirmed confidence

Last checked 9 August 2026 across 4 cited sources. The dated timeline above carries the project events.

Last checked 9 August 2026 Cited sources 4

Sources and related records

Read featured analysis Methodology Submit a correction Project tracker

Project sources 4