Location
Panama / Americas
Project record
Market survey closed; potential public procurement anticipated before end-2026
The Panama Canal Authority has closed a non-binding market survey for one potential 3,500-4,300-cubic-metre trailing suction hopper dredger. The requirement would extend an owner-fleet strategy demonstrated by ACP's earlier cutter-suction and backhoe-dredger acquisitions, but no current tender, budget, supplier, shipyard, value, or delivery programme is public.
Damen Shipyards Group (representative TSHD class; no ACP supplier selected)
Panama / Americas
Dredging
Planning / Confirmed
16 July 2026
Coverage
Dredging is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.
Subject index
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Project anatomy
Project timeline
Dated events that changed scope, counterparties, delivery, commissioning or operating status.
Open this project in the Change LogThe RFI's submission deadline has passed, closing the stated market-input window. ACP has not publicly identified respondents or issued a formal solicitation, so the opportunity remains at planning rather than tender or award stage.
SourceThe revised document confirms a 3,500-4,300-cubic-metre hopper, one starboard pipe, 30-metre dredging depth, three discharge routes, dynamic positioning, and a current intended diesel-electric and azimuth-propulsion configuration, while preserving the non-binding procurement boundary.
SourceThe anniversary record places navigation-channel, floating-equipment, lock, and dam maintenance inside a preventive-maintenance programme backed by more than B/.2 billion over the preceding five years. It establishes operating context, not a TSHD budget or procurement approval.
SourceACP reported 3.2 million cubic metres removed using five authority-owned units alongside Jan De Nul and Boskalis dredgers, demonstrating that internal plant and contracted capacity can operate as complementary delivery routes.
SourceThe award to IHC Engineering Business added a purpose-built 18-metre-depth, minimum 11-cubic-metre-bucket unit to ACP's fleet. It is a historic procurement precedent and does not identify the route or value of the current TSHD concept.
SourceThe formal international procurement replaced the 1942-built Mindi with a 12,000-kilowatt cutter-suction dredger intended for expansion and continuing maintenance. It proves a long owner-fleet strategy, not a current TSHD replacement decision.
SourceEvidence gap