Petit-Cap structure 403 wharf reconstruction

Participation
Not assessed
Project facts checked

Landco Construction's CAD 3.08 million contract ran from 2 November 2023 to 4 July 2024 for a Berlin-wall marginal wharf, harbour dredging and electrical reinstatement; CanadaBuys does not publish accepted completion or final quantities

Project sources

Landco Construction Ltd. received contract CW2335551 for reconstruction of structure 403 at Petit-Cap, New Brunswick through Public Services and Procurement Canada. CanadaBuys reports CAD 3,083,763.87 and an eight-month contract ending 4 July 2024. The 35-week requirement partially demolishes the timber-crib marginal wharf, dredges the harbour basin, builds a Berlin-wall replacement, installs electrical services and removes the cofferdam and environmental controls. Lower tiers, measured quantities, structural acceptance, commissioning and final account remain unpublished.

Structure 403 Berlin-wall wharf construction, old timber-crib demolition, cofferdam and harbour dredging in New Brunswick

IMWO artist's impression of the published Petit-Cap structure 403 wharf reconstruction scope

Location

Canada / Americas

Segment

Fishing harbour wharf, dredging and shore protection

Phase

Delivery / Confirmed

Last checked

6 August 2026

Coverage

Related sectors

Fishing harbour wharf, dredging and shore protection is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Fisheries and Oceans Canada, Small Craft Harbours, procured through Public Services and Procurement Canada
Delivery parties
Landco Construction Ltd. - prime contractor under CW2335551, Dredging, steel, infill, concrete, cofferdam, electrical, survey and environmental lower tiers - not named in the cited federal records
Contract route
PSPC tender WS4241747908 used lowest-price selection under the Canadian Free Trade Agreement. CanadaBuys records a 2 November 2023 award to Landco Construction Ltd., contract CW2335551 and a CAD 3,083,763.87 current total. The public history shows no listed amendment beyond the base award.
Execution window
The requirement called for completion within 35 weeks of acceptance. CanadaBuys records an eight-month contract from 2 November 2023 through 4 July 2024. Expiry establishes the scheduled commercial window only; no cited owner source confirms substantial completion, cofferdam removal, electrical commissioning or harbour release.
Works package
The project reconstructs structure 403 by partially demolishing the existing timber-crib marginal wharf, dredging the basin, constructing a Berlin-wall replacement, installing electrical services, maintaining environmental controls and a cofferdam, cleaning the site and demobilising. Public records do not provide wall length, pile schedule, infill quantity, dredged volume, disposal route, electrical load or as-built geometry.
Marine interfaces
Delivery combines partial demolition beside an operating fishing harbour with basin dredging, steel retaining construction, temporary cofferdam control, environmental barriers and utility reinstatement. Critical interfaces include old-crib stability, pile alignment and toe conditions, infill and cap inspection, sediment management, turbidity control, temporary access, electrical testing and safe berth release.
Commercial evidence boundary
CanadaBuys reports CAD 3,083,763.87 as the total value for CW2335551 and an eight-month term. The tender's CAD 1 million to CAD 5 million estimate is a pre-award range and must not be added to the contract. Variations, payment status, subcontract values, final quantities and a certified final account remain undisclosed.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Prime award

CW2335551 structure 403 reconstruction

Named party
Landco Construction Ltd.
Evidence status
Confirmed
Source position
CanadaBuys records a 2 November 2023 award and CAD 3,083,763.87 value. Source
Wharf replacement system

Berlin wall, dredging, electrical and environmental controls

Named party
PSPC, DFO and Landco Construction
Evidence status
Confirmed
Source position
The tender describes partial timber-crib demolition, basin dredging, a Berlin-wall replacement, electrical work and cofferdam removal. Source
Lower-tier supply chain

Steel, infill, concrete, dredging, electrical and survey

Named party
Undisclosed subcontractors and suppliers
Evidence status
Undisclosed
Source position
The official records name Landco as prime but no lower-tier participants.
Completion and acceptance

Structure 403, basin and electrical services

Named party
DFO, PSPC and Landco Construction
Evidence status
Not evidenced
Source position
The contract term ended without a cited owner completion, as-built or commissioning record.

Project timeline

Material developments

Dated events that changed scope, counterparties, delivery, commissioning or operating status.

Open this project in the Change Log

The recorded eight-month contract term expired

CanadaBuys carries 4 July 2024 as contract expiry but supplies no completion certificate, cofferdam close-out, electrical commissioning or final quantity record.

Source

Landco received the structure 403 contract

The CAD 3.08 million award converted the tendered Berlin-wall, dredging, electrical and environmental-control scope into a named prime contract.

Source

Evidence gap

What remains unverified

Outstanding evidence

  • Berlin-wall pile, infill and cap schedule
  • Dredged volume, sediment route and bathymetric acceptance
  • Cofferdam removal and environmental close-out
  • Electrical service testing and commissioning
  • Old timber-crib demolition quantities
  • Named steel, concrete, dredging and electrical lower tiers
  • Final account and change history
  • Owner handover and harbour operating release

Reporting status

Project phase
Delivery
Evidence confidence
Confirmed
Last checked
6 August 2026
Cited sources
4