Townsville MSQ Base wharf fender-pile replacement

Participation
Not assessed
Project facts checked

Queensland TMR awarded MSQ26005 to Pacific Marine Group on 11 May 2026 for AUD 423,687; no public milestone establishes mobilisation, pile quantities, installation method, completion or acceptance

Project sources

Queensland's Department of Transport and Main Roads awarded Pacific Marine Group contract MSQ26005 for the 2026 Townsville Maritime Safety Queensland Base wharf fender-pile replacement. TMR discloses an open procurement, 11 May 2026 contract date and AUD 423,687 value. Technical quantities, fender type, removal method, coatings, diving scope, assigned plant, delivery programme and closeout state remain unpublished.

Wharf fender structures undergoing refurbishment in a Pacific Marine Group maintenance project

Pacific Marine Group; exact company marine maintenance image showing wharf structures relevant to fender pile replacement, from a separate Defence project and used only as capability context, not evidence of MSQ26005 mobilisation or progress

Location

Australia / Asia Pacific

Segment

Wharf maintenance, fender piles and marine asset renewal

Phase

Award / Confirmed

Last checked

6 August 2026

Coverage

Related sectors

Wharf maintenance, fender piles and marine asset renewal is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Queensland Department of Transport and Main Roads / Maritime Safety Queensland
Delivery parties
Pacific Marine Group Pty Ltd - confirmed prime contractor under MSQ26005, Fender-system supplier, steel-pile fabricator, coatings, diving, survey, lifting and other lower-tier parties - not publicly identified
Contract route
The Queensland TMR 2025-26 contract disclosure records an open procurement and a contract date of 11 May 2026. The public resource provides the award title, buyer, contractor and AUD 423,687 value but no tender estimate, offer count, contract form, variation, payment or final-account information.
Execution window
No project-specific start date, marine work window, completion target, navigation notice, practical-completion date or acceptance record is publicly available as of 6 August 2026.
Works package
The controlling award title limits the evidenced physical scope to replacement of fender piles at the Townsville MSQ Base wharf. It does not state the pile count, diameter, length, material grade, fender arrangement, extraction or driving method, protective treatment, cathodic protection, deck or service interfaces, temporary works, testing or reinstatement requirements.
Marine interfaces
The work is a live-water wharf-maintenance package that may require access around an operating MSQ facility, removal and installation at the berth face, lifting, pile handling, diving or inspection and reinstatement of a vessel-contact system. Those activities are reasonable interface questions, not confirmed MSQ26005 methods or allocations. Pacific Marine Group's nearby Townsville facility and published fleet demonstrate mobilisation capacity but do not prove which assets, if any, are assigned.
Commercial evidence boundary
The disclosed MSQ26005 value is AUD 423,687. That amount covers the named fender-pile replacement contract, not a whole-site programme, paid-to-date figure or certified final account. No public variation, payment milestone, provisional sum, quantity schedule, subcontract value or final expenditure is available.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Prime works award

MSQ26005 Townsville MSQ Base wharf fender-pile replacement

Named party
Pacific Marine Group Pty Ltd
Evidence status
Confirmed
Source position
The Queensland TMR 2025-26 contract disclosure records an open award dated 11 May 2026 for AUD 423,687. Source
Relevant contractor capability

Fender, pile, diving, fabrication and marine-plant capability

Named party
Pacific Marine Group
Evidence status
Confirmed
Source position
Pacific Marine Group publishes a Townsville marine base, fender and piling services, and completed projects involving fender-system replacement, fender piles, diving, fabrication, barges and cranes. These are capability references, not MSQ26005 delivery evidence. Source
Project-specific technical scope

Pile schedule, fender design, installation method and supply chain

Named party
Not publicly identified
Evidence status
Not evidenced
Source position
The reviewed award record does not publish quantities, specifications, methods, assigned plant, designers, suppliers or lower-tier contractors.
Delivery and closeout

Mobilisation, progress, testing, completion and final account

Named party
TMR / MSQ and Pacific Marine Group
Evidence status
Not evidenced
Source position
No cited project-specific record proves physical mobilisation, installed work, testing, owner acceptance, variations, payments or final account.

Evidence gap

What remains unverified

Outstanding evidence

  • Notice to proceed, mobilisation date and marine work window
  • Fender-pile count, dimensions, material, coating and design life
  • Existing-pile removal and replacement installation method
  • Assigned barge, tug, crane, pile hammer, diving and survey spread
  • Fender manufacturer, steel fabricator, coating and other lower-tier parties
  • Wharf operations, vessel access and navigation-control interfaces
  • Testing, commissioning, practical completion and owner acceptance
  • Variations, payment status and certified final account

Reporting status

Project phase
Award
Evidence confidence
Confirmed
Last checked
6 August 2026
Cited sources
5