Larrys River small craft harbour breakwater reconstruction

Participation
Not assessed
Project facts checked

Zutphen Contractors holds active CAD 2.75 million contract CW2455209 through 27 November 2026 for rubble-mound breakwater construction at Larrys River; award and scope are confirmed but mobilisation and physical progress are not

Project sources

Zutphen Contractors received CAD 2,752,396.62 contract CW2455209 from Public Services and Procurement Canada, acting on behalf of Fisheries and Oceans Canada, for rubble-mound breakwater construction at Larrys River Small Craft Harbour in Nova Scotia. The contractor must delineate the construction zone from the operating facility and complete the work within a 25-week timeline. DFO's official register classifies Larrys River as a core fishing harbour managed by the Harbour Authority of Larry's River. Breakwater dimensions, rock quantities, quarry and marine-plant chain, mobilisation and acceptance remain unpublished.

Armour rock placement inside a delineated construction zone during rubble-mound breakwater reconstruction at an Atlantic Canadian fishing harbour

IMWO artist's impression of the published Larrys River small craft harbour breakwater reconstruction scope

Location

Canada / Americas

Segment

Fishing harbour wharf, dredging and shore protection

Phase

Delivery / Confirmed

Last checked

7 August 2026

Coverage

Related sectors

Fishing harbour wharf, dredging and shore protection is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Fisheries and Oceans Canada, Small Craft Harbours, procured through Public Services and Procurement Canada
Delivery parties
Zutphen Contractors - prime contractor under CW2455209, Armour rock, quarry, haulage, crane or excavator, barge, survey and environmental lower tiers - not named in the cited public records
Contract route
Solicitation WS5665000094 was issued by PSPC on behalf of DFO as a Canadian construction tender and amended once. CanadaBuys records a 3 June 2026 award to Zutphen Contractors, active contract CW2455209 and a CAD 2,752,396.62 total. Bid ranking, priced quantities and subcontract awards are absent from the published fields.
Execution window
The tender requires completion within 25 weeks, and CanadaBuys records the contract from 3 June to 27 November 2026. The award date may also be the administrative start date, but no cited owner notice confirms site possession, mobilisation, quarry production, first rock placement or breakwater completion.
Works package
The work comprises general construction of a rubble-mound breakwater at Larrys River Small Craft Harbour and delineation of the construction zone from the rest of the facility. Public records do not state breakwater length, crest elevation or width, core and filter gradations, armour size, toe detail, quarry source, access method or temporary navigation controls.
Marine interfaces
Breakwater reconstruction must separate heavy rock delivery and placement from an operating core fishing harbour. Critical interfaces include construction-zone marking, vessel access, old-section stability, toe preparation, rock quality and gradation, land-versus-barge placement, survey control, weather downtime and reopening of the protected entrance.
Commercial evidence boundary
CanadaBuys reports CAD 2,752,396.62 as the base active contract amount under amendment 000. No value split separates quarry production, haulage, marine plant, placement, survey, environmental controls or harbour operations. Final quantities, changes, payment status, claims and a certified final account remain undisclosed.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Prime award

CW2455209 breakwater reconstruction

Named party
Zutphen Contractors
Evidence status
Confirmed
Source position
CanadaBuys records the 3 June 2026 award, CAD 2,752,396.62 value and 27 November 2026 end date. Source
Owner and harbour

Larrys River Small Craft Harbour

Named party
DFO via PSPC; Harbour Authority of Larry's River
Evidence status
Confirmed
Source position
The tender says PSPC acts on behalf of DFO, while DFO's official list identifies the core harbour and its local manager. Source
Marine scope

Rubble-mound breakwater and construction-zone delineation

Named party
Zutphen Contractors
Evidence status
Reported
Source position
The official description identifies the construction system and operating-boundary requirement but no dimensions or quantities. Source
Delivery and lower tiers

Rock supply, haulage, placement, survey and handover

Named party
Undisclosed delivery chain
Evidence status
Not evidenced
Source position
The cited records name no lower tiers and publish no field-progress or acceptance record.

Project timeline

Material developments

Dated events that changed scope, counterparties, delivery, commissioning or operating status.

Open this project in the Change Log

Zutphen Contractors received the breakwater award

Awarding the CAD 2.75 million contract placed rubble-mound reconstruction, harbour separation and construction-zone controls under one named prime contractor.

Source

PSPC published DFO's 25-week harbour requirement

The April tender fixed a rubble-mound system, operating-harbour separation requirement and planned 25-week window for delivery and handover.

Source

Evidence gap

What remains unverified

Outstanding evidence

  • Notice to proceed and first rock placement
  • Breakwater length, crest, toe and design section
  • Core, filter and armour quantities and gradations
  • Quarry source, haul route and rock testing
  • Land-based versus barge-based placement chain
  • Construction-zone and navigation controls
  • As-built survey and owner acceptance
  • Final account and harbour return to service

Reporting status

Project phase
Delivery
Evidence confidence
Confirmed
Last checked
7 August 2026
Cited sources
4

Sources and related records

Project changes Methodology Email a correction Project tracker

Project sources 4