Breakwater Award
Zutphen holds Larrys River's 25-week breakwater contract
IMWO artist's impression accompanying this evidence brief, depicting rubble-mound breakwater
Zutphen Contractors holds CAD 2,752,396.62 contract CW2455209 for rubble-mound breakwater construction at Larrys River Small Craft Harbour through 27 November 2026. The 25-week requirement includes delineating the construction zone from the operating facility, but published records give no breakwater dimensions, rock quantities, quarry source or first-placement date.
The award assigns one breakwater prime
CanadaBuys establishes solicitation WS5665000094, contract CW2455209, Zutphen Contractors, the exact award amount, dates, rubble-mound scope and construction-zone requirement. DFO's directory establishes the core-harbour classification and local manager. Neither source identifies the quarry, rock schedule, lower tiers, mobilisation, placed quantities, as-built survey or owner acceptance.
Operating access constrains the rock sequence
Larrys River requires heavy rock delivery and placement beside a working core fishing harbour. Quarry approval, gradation testing, haul route, toe preparation, survey control and harbour-access separation can each change production. The contract identifies the prime without exposing which firms, plant or material sources carry those workstreams.
Evidence conclusion
First rock and survey define delivery
CanadaBuys fixes PSPC's on-behalf-of-DFO role, the prime, amount, 3 June award, 27 November end and rubble-mound scope. DFO fixes the core-harbour classification and local manager. Contract status alone cannot establish site possession, quarry production, first armour rock, as-built geometry, owner inspection or return of the entrance to unrestricted use.
Outstanding evidence
- Notice to proceed and first armour-rock placement
- Breakwater length, crest, toe and design section
- Core, filter and armour quantities and gradations
- Quarry source, haul route and rock testing
- Named placement, survey and environmental lower tiers
- As-built survey, owner acceptance and harbour release
Subject index
Related subjects
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Sources used 3
- WS5665000094 Larrys River tender and award search CanadaBuys / Government of Canada, Tender published 28 April 2026; contract awarded 3 June 2026
- CanadaBuys complete award-notice open data CanadaBuys / Government of Canada, Current file reviewed 7 August 2026
- DFO Small Craft Harbours listing for Larrys River Fisheries and Oceans Canada, Current directory reviewed 7 August 2026