Dexter holds CAD 4.29 million CW2462474 for floating-dock and pipe-pile replacement, while Connors Diving holds CAD 1.27 million 4500109325 for Wharf 403 pile jackets and concrete repairs; both awards are active but mobilisation and progress are unverified
Meteghan Small Craft Harbour now has two distinct 2026 marine-construction awards. PSPC awarded Dexter Construction Company Limited CAD 4,292,100.00 contract CW2462474 to remove three floating-dock systems and associated pipe piles, except the middle set replaced in 2018, and install new docks and piles at the same location. DFO separately awarded Connors Diving Services Limited CAD 1,265,518.56 contract 4500109325 for Wharf 403 steel H-pile rehabilitation using concrete repairs and new fibre-reinforced polymer concrete jackets. The contracts have different owners of record, scopes and dates; neither published award proves mobilisation, installed units or acceptance.
IMWO artist's impression of the published Meteghan floating wharf and pile rehabilitation scope
Canada / Americas
Fishing harbour wharf, dredging and shore protection
Award / Confirmed
8 August 2026
Coverage
Fishing harbour wharf, dredging and shore protection is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.
Subject index
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Project anatomy
Contract and delivery chain
Published scope, named parties and supporting evidence for each workstream.
Project timeline
Dated events that changed scope, counterparties, delivery, commissioning or operating status.
Open this project in the Change LogThe CAD 4.29 million award closed the prime for removal and replacement of three dock systems and associated pipe piles, but not the fabrication or field-progress chain.
SourceThe separate CAD 1.27 million award placed concrete-removal, underwater repairs and FRP-jacket work under a named marine-diving prime through March 2027.
SourceThe notice fixed the registry identity and Meteghan worksite coordinates while leaving approval, procurement and construction as separate gates.