Project record

CVM Congo River Easydredge 2700XL fleet renewal

CVM and Royal IHC representatives signing the Easydredge 2700XL contract at a table with organizational flags and project documents

Royal IHC

La Congolaise des Voies Maritimes has signed for a customised Royal IHC Easydredge 2700XL with an approximately 3,300 m³ hopper, Vietnam build and first-year operating support. The order follows an owner-reported 30-day FATSHI campaign that opened a new pass and stabilised an offered draft at 26 feet in 2023. That earlier campaign establishes the operating problem, not the new vessel's delivery or future Boma-Matadi access result.

Project signal

Delivery in Democratic Republic of the Congo

Current status Easydredge 2700XL building contract signed; no yard, trial, delivery, acceptance, or Congo River deployment milestone published Source confidence Confirmed

Location

Democratic Republic of the Congo / Africa

Segment

Dredging

Status

Easydredge 2700XL building contract signed; no yard, trial, delivery, acceptance, or Congo River deployment milestone published / Confirmed

Last checked

11 August 2026

Coverage

Related sectors

Dredging is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
La Congolaise des Voies Maritimes (CVM)
Delivery parties
Royal IHC as designer, integrator, service provider, crewing and training provider, Nam Trieu Shipbuilding Industry Corporation as planned partner yard in Vietnam, No named equipment suppliers or subcontractors in the reviewed contract record
Contract route
Direct building and service contract between CVM and Royal IHC, with construction planned at Royal IHC's Nam Trieu partner yard in Vietnam and Royal IHC retaining design, integration, first-year maintenance support, experienced crewing and training roles. Contract value, financing, payment milestones, securities, class, flag, final equipment suppliers, contractual delivery date and performance guarantees are not disclosed.
Execution window
Royal IHC announced the signed building contract on 10 March 2026. The release states Vietnam construction and first-year support but publishes no design-release, steel-cutting, keel-laying, launch, harbour-trial, sea-trial, dredging-trial, delivery, acceptance, crew-certification or Congo River deployment date.
Works package
Design and construction of one customised Easydredge 2700XL TSHD with an approximately 3,300 m³ hopper, greater autonomy, upgraded bow thruster and propulsion power, expanded accommodation, advanced automation and a first-year support package covering planned-maintenance software, technical assistance, experienced crewing and operational training. Royal IHC's standard Easydredge 2700 reference range lists 2,500-3,000 m³ hopper capacity, 5.5-metre maximum draught, 25-metre maximum dredging depth and a 700-millimetre suction tube; those figures are class context and are not assigned to the customised 2700XL unless its final technical particulars confirm them.
Marine interfaces
CVM's public mission covers hydrography, bathymetry, dredging, marking and pilotage on the maritime reach of the Congo River. The new vessel is intended for maintenance dredging and land reclamation supporting Boma and Matadi access. Its assigned reaches, pre-dredge surveys, annual quantities, material envelope, loading and discharge routes, placement sites, maintained dimensions, navigation windows and acceptance criteria are not published.
Commercial evidence boundary
The prime vessel and first-year support contract is committed, creating addressable design, shipbuilding, dredging-system, automation, propulsion, spares, planned-maintenance, technical-support, crewing and training work. The missing value, supplier split and delivery programme limit package-level commercial visibility. More importantly, the asset only becomes river capacity after accepted trials, trained crews, a funded maintenance programme, hydrographic control, disposal permissions and repeat production evidence.

Project timeline

Material developments

Dated events that changed scope, counterparties, delivery, commissioning or operating status.

Open this project in the Change Log

CVM and Royal IHC signed the customised 2700XL building contract

The contract commits an approximately 3,300 m³ TSHD, Vietnam build and first-year support for Congo River maintenance and land-reclamation duties. Construction start, final specifications, delivery, acceptance, deployment and navigation improvement all require later records.

Source

CVM reported a 30-day FATSHI campaign and 26-foot offered draft

CVM states that the separate existing TSHD opened a new pass and stabilised the offered draft at 26 feet for Banana, Boma and Matadi connectivity. This is owner-reported campaign history, not a current survey, independent acceptance or performance evidence for the new 2700XL.

Source

Evidence gap

What remains unverified

Outstanding evidence

  • Final technical particulars, class, flag, financing and supplier packages
  • Design release, steel cutting, keel laying, launch and Nam Trieu yard progress
  • Harbour, sea and dredging trials with disclosed acceptance criteria
  • Delivery, owner acceptance, crew certification and maintenance readiness
  • First funded Congo River campaign assigned to the new vessel
  • Reach-level surveys, quantities, soils, discharge and placement routes
  • Declared and independently supported navigation outcomes for Boma and Matadi

Reporting status

Delivery, confirmed confidence

Last checked 11 August 2026 across 6 cited sources. The dated timeline above carries the project events.