Waterway, dredging, and navigation operator

La Congolaise des Voies Maritimes (CVM)

CVM dredging operator seated at a control console with bathymetric, navigation-channel, and vessel-system displays

La Congolaise des Voies Maritimes

Congolese maritime-waterway organization providing hydrographic and bathymetric studies, maintenance dredging, navigation marking, and maritime pilotage on the maritime reach of the Congo River.

Organization overview

Waterway, dredging, and navigation operator

Geographic footprint: Africa and Democratic Republic of the Congo. Core marine roles: Maritime-waterway maintenance operator, Hydrographic and bathymetric survey provider, Maintenance-dredging fleet owner and operator, and Navigation-marking and maritime-pilotage provider.

Project records 1 Last reviewed

Type

Waterway, dredging, and navigation operator

Active regions

Africa, Democratic Republic of the Congo

Marine works roles

Maritime-waterway maintenance operator, Hydrographic and bathymetric survey provider, Maintenance-dredging fleet owner and operator, Navigation-marking and maritime-pilotage provider, Dredger procurement, acceptance, and deployment client

Role in marine infrastructure

Congolese maritime-waterway organization providing hydrographic and bathymetric studies, maintenance dredging, navigation marking, and maritime pilotage on the maritime reach of the Congo River. CVM is the navigation-service operator, dredging-fleet owner, survey user and shipbuilding client supporting access to Banana, Boma and Matadi.

Sources used 4

Source collections