Mississippi River and Southwest Pass September hopper work programme

Participation
Not assessed
Project facts checked

Wheeler and Glenn Edwards operations scheduled from approximately 4 September with different end dates; actual vessel mobilisation and accepted output unconfirmed

Project sources

Two New Orleans District notices describe hopper dredging in the Mississippi River and Southwest Pass. Wheeler has a short September window, while the separately identified government-contract dredge Glenn Edwards has a longer programme; neither notice reports a completed work quantity.

Wheeler and Glenn Edwards programme interface around Head of Passes in the Mississippi River and Southwest Pass: vessel notices, passing coordination, actual activity and dated surveys

IMWO original Mississippi River and Southwest Pass programme-interface diagram from USACE notices and survey-information bulletin; no navigation or acceptance certification

Location

United States / Americas

Segment

Dredging

Phase

Planning / Confirmed

Last checked

3 September 2026

Coverage

Related sectors

Dredging is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
U.S. Army Corps of Engineers, Civil Works
Delivery parties
USACE New Orleans District operates Wheeler; the commercial operator of government-contract dredge Glenn Edwards is not identified in the cited notices
Contract route
Government-vessel operation for Wheeler and separately government-contract hopper operation for Glenn Edwards, as identified by the notices. No new award identifier, contract price or commercial contractor company is named in these documents.
Execution window
Wheeler: on or about 4 September through approximately 15 September 2026. Glenn Edwards: on or about 4 September through approximately 31 October 2026. Both notices specify planned 24/7 working, not observed working days or close-out dates.
Works package
Each notice covers Head of Passes to approximately 22 BHP in Southwest Pass and Head of Passes to approximately 13 AHP in the Mississippi River. These are potential work locations rather than a continuous 35-mile excavation. Cut volumes and target or accepted depth are not given.
Marine interfaces
Both dredges are to monitor VHF 16 and 67 for passing arrangements. The district asks mariners to minimise wake at the slowest safe speed and proceed cautiously after coordination. The notices do not announce a blanket channel closure or certify navigation depths.
Commercial evidence boundary
The two windows distinguish the short government-vessel campaign from the longer government-contract hopper programme. Overlap indicates a potential coordination interface, not simultaneous plant positions, confirmed production rates or a newly awarded combined contract. Material placement, final quantities and commercial value remain unspecified.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Government hopper programme

Wheeler / notice 214994

Named party
USACE New Orleans District
Evidence status
Confirmed
Source position
The 3 September notice schedules approximately 4-15 September in two Head of Passes work envelopes, with passing coordination. Source
Government-contract hopper programme

Glenn Edwards / Bulletin 26-85

Named party
USACE New Orleans District
Evidence status
Confirmed
Source position
The 1 September notice schedules approximately 4 September-31 October in the same envelopes; not a new named company award. Source

Evidence gap

What remains unverified

Outstanding evidence

  • Vessel-specific operational notices and changes to the approximate work windows
  • Actual work locations and dredge passing arrangements before a transit
  • Dated channel-condition surveys, distinct from scheduled dredging activity
  • Published production, placement and close-out information for each campaign

Reporting status

Project phase
Planning
Evidence confidence
Confirmed
Last checked
3 September 2026