Wesleyville and Brookfield floating-dock reconstruction
Participation
Not assessed
Project facts checked
Granite Management received DFO contract 4500013526 on 23 December 2021 for a two-site floating-dock package; the 2021-22 Public Accounts mark the contract completed, while physical acceptance records remain unpublished
DFO awarded Granite Management Ltd. contract 4500013526 under solicitation 30001281 on 23 December 2021. The ten-week package covered removal of the existing Wesleyville floating-dock facility and repairs to its retained timber boardwalk, plus a new Brookfield access road, HDPE culvert, armour and filter-stone protection, treated-timber approach crib, seabed dredging, gangway and two floating docks on chain-and-concrete-block moorings. CanadaBuys reports CAD 392,533.75, while the 2021-22 Public Accounts separately list CAD 393,285 as amount contracted and expenditure to date and apply note f, defined as a contract completed in the current year.
Fishing harbour wharf, dredging and shore protection
Phase
Completed / Confirmed
Last checked
13 August 2026
Coverage
Related sectors
Fishing harbour wharf, dredging and shore protection is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.
Subject index
Related subjects
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Project anatomy
Contract scope and delivery roles
Client / authority
Fisheries and Oceans Canada - Small Craft Harbours
Delivery parties
Granite Management Ltd. - construction prime under contract 4500013526, Dredging, timber, floating-dock, gangway, mooring, rock, civil and survey lower tiers - not named in the cited public records
Contract route
DFO ran solicitation 30001281 as an open competitive construction procurement. The tender closed on 14 October 2021 and required completion within ten weeks of notification of acceptance. Granite Management's award date was 23 December 2021, with CanadaBuys publishing the notice the next day.
Execution window
The invitation to tender required completion within ten weeks of notification of acceptance. In the 2021-22 Public Accounts, note f is applied and defined as a contract completed in the current year. No cited record gives the notice-to-proceed date, exact substantial-completion or acceptance date, return-to-service date or defects-closeout date.
Works package
At Wesleyville, the contract called for removal of the existing approach crib, floating docks, gangway, mooring chains and anchor blocks; partial timber-boardwalk removal; new timber bracing, rails and posts; and rockfill, geotextile, filter stone and armour stone where required. At Brookfield, it called for clearing and grubbing, a new granular access road, an HDPE culvert with riprap, filter and armour stone, a treated-timber approach crib scribed to hard bottom where needed, cribseat excavation, seabed dredging, two new floating docks, a gangway, mooring chains and concrete anchor blocks. The price form schedules 40 cubic metres of treated-timber cribwork, two floating docks, one gangway and 95 CMPM of dredging.
Marine interfaces
The package links shore access and drainage to a hard-bottom cribseat, dredged float basin, gangway and chain-moored floating docks. Brookfield required a floating silt curtain at the start of work, dredging around exposed bedrock and coordination of new armour and filter-stone protection with the access-road and crib interfaces. Wesleyville required removal beside retained boardwalk elements and reinstatement of timber and shoreline protection.
Commercial evidence boundary
CanadaBuys displays CAD 392,533.75 for the award record. The 2021-22 Public Accounts separately show CAD 393,285 in the amount-contracted, annual-expenditure and expenditure-to-date fields. No contract-specific source identifies the CAD 751.25 difference as tax, amendment, rounding or final adjustment. The two amounts therefore remain distinct source fields rather than values that can be combined.
Contract and delivery chain
Work packages and named roles
Published scope, named parties and supporting evidence for each workstream.
Construction prime
30001281 / 4500013526
Named party
Granite Management Ltd.
Evidence status
Confirmed
Source position
CanadaBuys records the 23 December 2021 open-competition award and CAD 392,533.75 reported value. Source
Wesleyville demolition and repair
Existing floating-dock facility removal and retained-boardwalk work
Named party
DFO and Granite Management
Evidence status
Confirmed
Source position
The official specification and drawings define removal of the approach crib, docks, gangway, chains and anchor blocks, plus boardwalk and shoreline work. Source
Brookfield new works
Access, culvert, protection, crib, dredging, gangway and floating docks
Named party
DFO and Granite Management
Evidence status
Confirmed
Source position
The bid package and drawings define the new road and marine layout, including two floating docks, one gangway, concrete anchors and 95 CMPM of dredging in the price form. Source
Contract completion and expenditure
Federal Public Accounts ledger
Named party
Fisheries and Oceans Canada and Granite Management
Evidence status
Confirmed
Source position
The 2021-22 Public Accounts list CAD 393,285 amount contracted and expenditure to date and apply note f, defined as a contract completed in the current year. Source
Physical acceptance and lower tiers
Accepted quantities, as-builts, reopening and subcontract chain
Named party
Undisclosed
Evidence status
Not evidenced
Source position
The reviewed official records establish contract completion but do not publish physical acceptance files, measured quantities or named lower tiers.
Project timeline
Material developments
Dated events that changed scope, counterparties, delivery, commissioning or operating status.
By fiscal year-end, the federal ledger reported CAD 393,285 amount contracted and expenditure to date with note f, closing contract status but not the physical acceptance chain.