Project record
Marsa LNG is developing a 1 mtpa LNG plant and bunkering hub at SOHAR Port through a USD 1.6 billion project owned by TotalEnergies (80%) and OQ Exploration & Production (20%). The marine works have crossed two different stages: Boskalis completed approximately 3.8 million cubic metres of dredging for the dedicated access channel, turning circle and berth pocket in April 2026, while BESIX continues construction of the LNG jetty, shore protection and drainage network. Current project imagery shows pile driving and prefabricated beam installation; it does not establish a complete jetty, installed loading arms, accepted berth or first LNG transfer.
Oman / Middle East
Deep-water ports and energy terminals
Access-channel dredging completed; LNG jetty, shore protection and drainage under construction / Confirmed
28 July 2026
Coverage
Deep-water ports and energy terminals is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.
Subject index
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Project anatomy
Project timeline
Dated events that changed scope, counterparties, delivery, commissioning or operating status.
Open this project in the Change LogBESIX and project-team updates show active piling, the Pauline jack-up platform and prefabricated beam installation, while reporting more than 1.5 million work hours without a lost-time injury. The evidence supports active construction, not structural completion or topsides handover.
SourceCompletion of the approximately 3.8 million cubic metre access-channel, turning-circle and berth-pocket package removed one marine access gate but did not complete the jetty or LNG transfer systems.
SourceThe award identified BESIX for the jetty, shore protection and drainage network on an approximately 16-month fast-track programme, separating that package from Boskalis dredging and the LNG plant EPC.
SourceTechnip Energies confirmed mobilisation and the start of plant execution, increasing the importance of the later port-to-topsides interface without proving marine completion.
SourceThe sponsors committed the USD 1.6 billion integrated LNG and solar project and a 2028 start-up objective, creating the delivery basis for the separate marine packages.
SourceEvidence gap