Integrated infrastructure, water, port and concession developer-contractor

ACCIONA

Rows of large white process pressure vessels at an ACCIONA reverse-osmosis desalination facility

ACCIONA

ACCIONA develops, designs, builds, finances and operates transport, water and concession assets.

Organization overview

Integrated infrastructure, water, port and concession developer-contractor

Geographic footprint: Africa, Asia Pacific, Middle East, Europe, and Americas. Core marine roles: Integrated infrastructure developer and contractor, Water design and construction contractor, Desalination EPC and commissioning lead, and Long-term water operations and maintenance provider.

Project records 4 Last reviewed

Type

Integrated infrastructure, water, port and concession developer-contractor

Active regions

Africa, Asia Pacific, Middle East, Europe, Americas

Marine works roles

Integrated infrastructure developer and contractor, Water design and construction contractor, Desalination EPC and commissioning lead, Long-term water operations and maintenance provider, Concession and PPP investor, Port and terminal civil works contractor, Breakwater and quay contractor, Floating caisson producer, Tunnelling and marine utility interface contractor, Alliance and joint-venture delivery partner

Role in marine infrastructure

ACCIONA develops, designs, builds, finances and operates transport, water and concession assets. At group level, its 2025 reporting records operations in 60 countries, 68,502 professionals and 1,632 active projects; Infrastructure closed the year with a EUR 30.354 billion global backlog, while the Water business reported a EUR 7.716 billion backlog. Water scope runs from abstraction, reverse-osmosis desalination and treatment through distribution, reuse and long-term operation. The transport business says it has designed and constructed more than 50 ports, supported by two operational Kugira floating docks for reinforced-concrete caisson production. The cited project records identify active ACCIONA delivery roles at Casablanca, Alkimos and Valencia. At San Antonio Puerto Exterior, Acciona-Hyundai is a prequalified bidder only. Corporate capability, consortium membership and in-house plant do not establish a lower-tier marine workshare, completed scope or owner acceptance without project-specific evidence.

Sources used 13

Source collections