Location
Morocco / Africa
Project record
The Casablanca-Settat PPP is building 300 million m3/year of seawater reverse-osmosis capacity at Sidi Rahal in two phases, with the initial stage carrying the marine, tunnelling, and electrical systems shared by the full plant.
Morocco / Africa
Marine utilities
Construction active; common marine, tunnelling, and electrical systems remain on the path to the February 2027 first-phase target / Confirmed
15 July 2026
Controlled taxonomy
The detailed segment above is the primary work classification. These broader sector links connect the project to related delivery and market research.
Knowledge context
Continue through the topic collections to compare this record with related projects, evidence guides, briefs, articles, reports, and performance records.
Project anatomy
Material change register
Only source-bound events that alter phase, scope, counterparties, delivery, completion, commissioning, or acceptance are listed. A change can advance the record without proving the next gate.
ACCIONA's 2025 integrated report attributes part of Water's improved performance to faster-than-expected delivery of key projects including Casablanca. This is a current execution signal, not a measured marine-progress percentage, tunnel breakthrough, common-system acceptance, first water, or operating release.
Read controlling sourceACCIONA's Q1 statement says Water revenue growth and backlog execution were driven in part by construction at Casablanca. It confirms active contractor delivery through 31 March 2026 but does not identify completed marine structures, tunnel advance, wet testing, or owner acceptance.
Read controlling sourceThe owner describes Casablanca as in progress at the end of 2025 and retains the 300 million m3/year, clean-energy programme frame. This confirms owner-side construction status but provides no marine-package quantity, completion measure, acceptance certificate, or first-water evidence.
Read controlling sourceACCIONA identified the 50/45/5 consortium split, 80/20 debt-equity structure, MAD 6.5 billion investment, renewable-power supply and 27-year construction and O&M role. Financing removes a commercial gate; it does not prove marine mobilisation, physical progress or accepted output.
Read controlling sourceThe owner marked the start of project realization and set the two-phase capacity and programme. Construction launch moves the project into execution while leaving marine method, tunnel progress, permanent intake and discharge installation, integrated testing and operation as later evidence gates.
Read controlling sourceONEE records the PPP conclusion in November 2023 for design, finance, construction and more than 27 years of operation. The agreement establishes responsibility and delivery structure, not notice to proceed, construction start or marine-system definition and acceptance.
Read controlling sourceDelivery watch
Verify physical completion and acceptance of the common marine and tunnelling systems, energisation and integrated testing of the first 200 million m3/year stage, then owner confirmation of first water and commercial operation.
This public project page is a tracked market record rather than a tender notice, contractual commitment, or commercial instruction. Use the status, confidence label, evidence-review date, and source note together when judging how much weight to place on the signal.
Read featured analysis Review methodology Submit stronger evidence or a correction Open project trackerONEE records a November 2023 public-private partnership, the 10 June 2024 start of construction, and a first phase of 200 million m3/year followed by a 100 million m3/year expansion. ACCIONA's May 2025 financing announcement identifies the Al Baidaa Desalination Company consortium, MAD 6.5 billion of plant investment, a 27-year construction and O&M role, and 300 million m3/year of final production. ONEE's year-end 2025 profile keeps Casablanca under construction. ACCIONA's Q1 2026 statement names Casablanca among the projects driving Water construction activity, while its June 2026 integrated report describes faster-than-expected delivery across key water projects including Casablanca. A current project-team profile places first-phase completion in February 2027 and second-phase completion in August 2028, and says the first phase includes the common marine works, tunnelling, and electrical systems. ACCIONA's project profile gives 559,000 m3/day in the first stage plus 279,500 m3/day in the second. NOVEC's owner-side marine study covers bathymetry, geology, seawater quality, waves, currents, and pretreatment selection. Moroccan project reporting identifies two approximately 1.85 km seawater-intake lines and an approximately 2.5 km discharge outfall. The corporate execution signals confirm active delivery but do not establish tunnel breakthrough, installed intake or outfall geometry, accepted common systems, first water, or commercial operation.
Phase: construction. Evidence reviewed: 15 July 2026.