Coverage focus
Water intake, treatment, conveyance, wastewater and marine-discharge systems
Sector intelligence
Water infrastructure from source and intake through treatment, pumping, conveyance, reuse and discharge, including desalination, wastewater, marine outfalls and coastal utility interfaces.
Projects retain their detailed work segment and may appear in more than one sector when the scope crosses delivery disciplines.
Water intake, treatment, conveyance, wastewater and marine-discharge systems
51 project records connected to this sector.
62 current analyses and briefs connect through governed project relationships.
28 public profiles connect through documented project roles.
System boundary
This sector follows the hydraulic system rather than assuming that every coastal water project contains marine works. Inland water and wastewater assets remain visible here, while the Marine utilities subject collection requires a documented coastal or offshore interface.
Define source reliability, hydrology or ocean conditions, intake geometry, screens, sediment and debris exposure, environmental constraints and the duty available to the first pumping stage.
Keep design flow, influent and product quality, process redundancy, residuals handling, reuse obligations and the boundary between civil, process and marine packages on separate evidence lines.
Track hydraulic grade, pump duty, surge and vacuum, rising mains or gravity routes, storage, crossings, tie-ins, isolation and access for inspection and repair.
For wastewater, brine and cooling returns, record outfall and diffuser geometry, discharge quality, critical ambient conditions, recirculation risk, compliance points and post-start monitoring.
Separate civil completion, pressure and leakage tests, process trials, first flow, rated output, water quality, environmental acceptance, handover, reliability and maintenance history.
Reference frame
AWWA organizes water-supply practice from source through treatment, storage and distribution, which is the broader system boundary used for this sector.
The narrower IMWO collection covers seawater intakes, outfalls, landfalls, marine pipelines, tunnels, diffusers and their operating evidence.
Project coverage
United Kingdom / Tidal surge barrier and downstream flood defences / Permanent reinforced-concrete foundations advancing; revised superstructure scheduled from early 2027
construction / Last checkedEgypt / Agricultural drain rehabilitation, bank protection and pumping stations / Drain and bank works reported in execution in January 2026; Samatay-Hamoul evaluation complete with award order in preparation in September, followed by an October procurement review
construction / Last checkedNigeria / Passenger jetties and shore charging civil infrastructure / EIB financing signed 11 December 2025; appraisal defines planned jetty, charging and maintenance scope with environmental and land-delivery conditions
planning / Last checkedVietnam / Riverbank embankment and urban flood outfall works / June 2026 government account reports embankment work and drainage-package mobilisation; subsequent reach acceptance and programme updates remain to be checked
delivery / Last checkedNigeria / Earth dam, spillway, intake and scour-outlet rehabilitation / IUFMP records commissioning on 29 May 2020; the World Bank's 2023 implementation report confirms completed rehabilitation; its 2025 review records the dam-maintenance assignment as pending
completed / Last checkedUnited States / Spillway-gate maintenance and reservoir operations / September 2026 owner plan schedules gate work and dam-road closure from 21 September to mid-January 2027
planning / Last checkedMalaysia / Cooling-water intake sediment removal / Marine circular defines a buoyed mud-removal work area for 7 October 2026-15 June 2027
planning / Last checkedAustralian Antarctic Territory / Seawater intake, water production and station services / Water-system modules dispatched in October 2026; V1 schedule plans Davis over-ice resupply for 4-13 November
mobilisation / Last checkedEgypt / Irrigation regulators and discharge-monitoring systems / Ministry reports barrages operational from 28 February 2026 and monitoring-system trials from 30 March
commissioning / Last checkedAustralia / Wastewater bioreactor foundations and commissioning / Excavation completed in June; August owner plan schedules foundation pours in October, November and December 2026
construction / Last checkedAustralia / Wastewater treatment and ocean-outlet capacity / Initial AUD 105 million committed to design, engineering and site preparation
planning / Last checkedUnited Kingdom / Flood-bridge replacement / Compound cabins installed by 30 October; temporary access and bridge workfaces are being established
construction / Last checkedUnited Kingdom / Tidal embankment and outfall adaptation / Detailed design, land discussions and environmental assessment; Full Business Case targeted for summer 2027
planning / Last checkedUnited Kingdom / Tidal outfall and flood-gate renewal / September flap installation reported 7 October; separate regulating-float repair planned by yearend
construction / Last checkedUnited Kingdom / Rock-armour coastal defence / Construction reported begun 14 October 2026; rock-delivery and installation programme extends into 2027
construction / Last checkedUnited Kingdom / Service-reservoir maintenance / Conditions-of-participation deadline passed 2 November 2026 at 23:59 UTC; next advertised stages are selection and ITT rounds
tender / Last checkedJordan / Pipeline bridge and hydraulic culverts / 16 November bids; document collection ended
tender / Last checkedUnited Kingdom / Service-reservoir maintenance / Planning history checked 31 October 2026 still contains only the 13 October notice; its expected 30 October formal notice is absent from that history
planning / Last checkedUnited Kingdom / Marine utilities / Pre-lay sand-wave clearance and separate post-lay protection workstreams
construction / Last checkedUnited Kingdom / Marine utilities / Two appraisal wells complete; evaluation and concept selection continue
feasibility / Last checkedAustralia / Marine utilities / First intake-to-tunnel connection complete; excavation towards the second riser continues
construction / Last checkedJordan / Marine utilities / October marine assessment adopts the existing SEPCO intake and a revised canyon outfall; financing approvals recorded, construction release unconfirmed
financing / Last checkedUnited Kingdom / Inland flood-alleviation and pumping infrastructure / Procurement terminated on 30 September 2026 by notice 092372-2026; a replacement process and the wider scheme's future remain unconfirmed
tender / Last checkedFiji / Marine utilities / CW02 prequalification applications closed on 30 September 2026; bidding invitations expected in December 2026
prequalification / Last checkedUnited States / Marine utilities / Agate named for outfall repair or extension and vehicle-ramp works; notice to proceed and mobilisation not confirmed
award / Last checkedMozambique / Water intake and treatment works / Jiangxi Water and Hydropower Construction Group signed the USD 17.985 million W-15/23 contract on 10 January 2024; ARA Norte documented work at the treatment, pumping and elevated-storage sites in September 2025, and no package completion or acceptance record follows the cited April 2026 target
construction / Last checkedSaudi Arabia / Marine utilities / EPC performance test completed on 19 February 2026; SWPC commercial-operation confirmation remains unpublished
commissioning / Last checkedUAE / Marine utilities / Block A in service; Blocks B and C remain in the 2026 delivery programme
commissioning / Last checkedSpain / Urban wastewater treatment, tertiary reuse and flood resilience / CHJ currently lists the Torrent adaptation works in execution under the Global Omnium Medioambiente-CICLAGUA-BECSA UTE; its 2025 delivery report fixes the site-start baseline at 19 September 2023 and records separate certified amounts for modification 1 and the post-DANA emergency workfront, while PLACSP's 10 August 2026 modification record adds zero price and zero duration
construction / Last checkedKiribati / Marine utilities / ADB records the three-outfall civil package completed in August 2018, testing and commissioning in Q2 2019, the wider project physically completed on 31 December 2019, and the financing operation closed
completed / Last checkedSpain / Urban wastewater treatment, tertiary reuse and renewable-energy integration / ACUAES selected the Aquambiente-COPASA-PESA consortium on 30 July 2026 at EUR 61,784,295.49 excluding VAT; the award notice was published on 4 August, while contract signature, notice to proceed and mobilisation remain unconfirmed
award / Last checkedUAE / Marine utilities / EWEC lists Taweelah RO as an existing 909,000 m3/day facility and records 297.16 million m3 of 2024 production; final as-built intake and outfall geometry is not publicly disclosed
completed / Last checkedMorocco / Marine utilities / Construction active; common marine, tunnelling, and electrical systems remain on the path to the February 2027 first-phase target
construction / Last checkedSouth Africa / Wastewater pump stations, rising mains and treatment-plant tie-ins / City of Cape Town tender 32Q/2026/27 is open for a new 1,100 L/s Rietvlei sewage pump station, twin 1,980 m DN710 HDPE rising mains and Bellville WWTW tie-in works; bids close at 10:00 local time on 2 November 2026 and no contractor is appointed
tender / Last checkedLesotho / Water intake and treatment works / The official LLWDP dashboard currently displays 85% overall progress under a malformed update date; the last fully dated World Bank restructuring paper recorded 65% physical completion after a 24 February 2026 flood compromised the temporary river diversion and cofferdam, delaying intake works
construction / Last checkedNamibia / Marine utilities / Toyota Tsusho feasibility study active; marine-site consultant, selected site and delivery awards remain unconfirmed
feasibility / Last checkedAustralia / Marine utilities / Prepare EIS; the current concept fixes a 2.4 km intake tunnel and existing-outfall connection, but no construction decision or funding is public
planning / Last checkedUnited Kingdom / Marine utilities / Three sub-seabed utility lines remain under an active harbour construction notice; the CDO and desalination pipe-pull notices have closed
construction / Last checkedUAE / Marine utilities / EPC agreement signed on 7 May 2026; no notice to proceed or marine mobilisation is published
award / Last checkedOman / Marine utilities / Under construction; Nama PWP targets commercial operation in Q1 2027
construction / Last checkedSenegal / Marine utilities / Plant remained under construction in February 2026; commissioning was expected later in 2026, while final marine handover evidence remains unpublished
construction / Last checkedSolomon Islands / Marine utilities / ADB still lists bid-document preparation for the new marine works; Solomon Water's public plan carries competing three-outfall, two-new-outfall and NRH/Ranadi package definitions, with no works award disclosed
tender / Last checkedBahrain / Marine utilities / Two bids were opened for Hawar's separate offshore intake and outfall EPC package on 25 December 2025; EWA still lists the wider desalination scheme as a future project and no award is published
tender / Last checkedMexico / Marine utilities / Compras MX lists the invitation as current, with proposal opening deferred to 24 July 2026 and the ruling moved to 29 July; no award is published
tender / Last checkedPortugal / Marine utilities / Construction was released on 22 April 2026 and the site milestone was held on 8 July; offshore intake and outfall execution remains unverified
construction / Last checkedSaudi Arabia / Marine utilities / Sharakat is qualifying developers across five planned seawater reverse-osmosis projects; no individual RFP, award or project-specific marine package is public
prequalification / Last checkedIndia / Marine utilities / Four IFC advisory procurements define transaction preparation; the 100 MLD PPP, marine site, concession and works remain unawarded
planning / Last checkedSingapore / Marine utilities / Nearshore outfall and Contract 1A permanent works were substantially completed on 14 August 2023; wider DTSS2 and Tuas WRP completion, commissioning and discharge acceptance remain open
construction / Last checkedUAE / Marine utilities / PPA and EPC signed; cooling-water review and existing-plant tie-ins exposed, marine route unconfirmed
award / Last checkedChile / Marine utilities / First desalinated water reached Radomiro Tomic during progressive commissioning; rated service and commercial operation remain open
commissioning / Last checkedSaudi Arabia / Marine utilities / Project agreements, the L&T-Lantania EPC award and December 2025 financial close are evidenced, and ACWA's 3 March 2026 year-end report classifies the full 300,000 m3/day capacity as under construction; offshore mobilisation, installed intake or outfall geometry, first water and accepted production are not dated
construction / Last checkedCurrent research
Bridgwater's revised tidal-barrier design puts the gate-drive equipment at the base of three towers while work advances on the permanent foundations. The Environment Agency announced the changes on 15 January 2026: towers approximately 15 m high, a 10 m reduction, with simpler shapes and lighter operational walkways. Somerset Council's October construction account reports reinforcement beneath the central pier and permanent concrete taking shape. The next interface is between the revised machinery arrangement and the concrete being cast. [1][2]
Updated
The Environment Agency reported completion of the Avon Water tidal-outfall replacement at Keyhaven Harbour on 13 October 2026. Significant corrosion had prompted renewal of a structure serving a flood-defence system that protects around 40 properties. Much of the structure is submerged for long periods: specialist divers carried out detailed inspections, and the tides governed the work [1].
Updated
Kitchener Drain's rehabilitation puts dredging crews beside bank-protection works. Egypt's water ministry reported on 11 January 2026 that two dredging and weed-removal work packages and two bank-rehabilitation packages were under way, including stone pitching and a retaining wall. The programme's October 2018 environmental summary identifies two controls for drain maintenance: avoid excavating beneath the submerged bank and keep saturated dredged material off its crest. Those requirements make the repaired bank's geometry part of the next cleaning operation. [1][2]
Updated
Lagos's Omi Eko electric-ferry programme brings a land problem into the jetty design. The environmental assessment identifies room for charging at Marina, Ikorodu, Badore, Bariga and Festac through parking reallocation. Falomo faces a tighter site with likely additional land requirements; Ebute Ojo, Liverpool, Oworonshoki and Baiyeku also require additional land in that assessment. EIB's June 2025 appraisal describes 25 jetties and stations, 12 charging and electricity-generation locations and two terminals equipped for daily or light maintenance. Each civil workfront needs enough shore space to make its waterfront usable. [2][3]
Updated
Nga Bay's riverbank and drainage works were proceeding on different programmes in Can Tho's June 2026 progress account. Package 1 covered embankments and Pham Hung green infrastructure, with completion then expected by 31 December 2026. Package 2 covered storm drainage, sewer collection and wastewater treatment, with completion expected in November 2027. Across the scheme, about 3.1 km of new banks along Xeo Vong, Cai Con and Soc Trang connect to a planned stormwater system with 22 outlets and to works at Xang Thoi Lake. That combination makes the drainage connection a specific handover question for each completed bank reach. [1][2]
Updated
The World Bank's 28 February 2025 completion report for the Ibadan Urban Flood Management Project recorded Eleyele Dam's maintenance responsibility as still pending. The dam had been commissioned on 29 May 2020 after spillway, embankment, intake and outlet rehabilitation. The project owner's account names CGC-CHWE JV as works contractor and Tractebel Engineering, with SGI Consulting, for design and supervision. This completed civil-work package needed an operating handover covering both flood release and raw-water supply. [1][2]
UpdatedDelivery network
National public water and wastewater utility / Kinoya treatment-plant owner and existing operator / CW02 employer, procuring agency and contract-management counterparty
Last checked
Federal navigation project owner / Coastal and inland navigation asset manager / Planning, design, construction and operations-and-maintenance authority
Last checked
State hydraulic-infrastructure promoter / Public works contracting authority and client / Water-supply, sanitation and wastewater-treatment delivery
Last checked
Government water-infrastructure project implementation / Bulk-water intake, treatment and transmission programme coordination / Procurement and contract administration
Last checked
Integrated infrastructure developer and contractor / Water design and construction contractor / Desalination EPC and commissioning lead
Last checked
Independent water project developer / Infrastructure investor / Project company shareholder
Last checkedSearch the public index for this delivery discipline, compare mapped projects, and use IMWO confidence labels before treating a signal as a tender, award, mobilisation, acceptance, or operating outcome.
Search Water infrastructure and marine systems Open project tracker Open sector guide Review methodology