Project record

Portsmouth Water service-reservoir maintenance framework

Participation
Planned procurement
Next notice (expected)
30 October 2026
Participation checked

Planning history checked 31 October 2026 still contains only the 13 October notice; its expected 30 October formal notice is absent from that history

Participation source

Portsmouth Water plans a maintenance framework for its concrete service reservoirs and raw-water storage. The 13 October planning notice expected a formal notice on 30 October; the history checked on 31 October still contains only that planning release.

Portsmouth Water service reservoirs and UVDB maintenance allocation chart showing the 13 October planning notice's expected 30 October date

IMWO original source-based portfolio and procurement chart; no site geometry or completed work depicted

Location

United Kingdom / Europe

Segment

Service-reservoir maintenance

Phase

Planning / Confirmed

Last checked

31 October 2026

Coverage

Related sectors

Service-reservoir maintenance is the primary work classification. Related sectors connect this record to adjacent marine delivery and market coverage.

Subject index

Related subjects

These subject pages bring together related projects, technical articles, reports, and evidence methods.

Project anatomy

Contract scope and delivery roles

Client / authority
Portsmouth Water
Procurement references
096621-2026; ocds-h6vhtk-0786b8
Delivery parties
Framework suppliers - appointments not disclosed in the planning notice
Contract route
Planning notice 096621-2026 identifies UVDB categories 4.1.6 and 4.1.6.2. It proposes two framework partners, direct allocation for planned and reactive minor works up to GBP 100,000, and a mini-competition between the partners for larger works. Supplier registration and current category coverage require confirmation.
Execution window
The 13 October planning notice expected formal procurement on 30 October 2026. The history checked on 31 October contains no later release, submission deadline or framework service dates.
Works package
Inspection, draining, cleaning, condition assessment and remedial work across approximately 35 concrete service reservoirs, ranging from 0.1 to 45 ML, and a 135 ML raw-water reservoir. Planned and emergency maintenance have separate allocation provisions; site schedules and detailed repair specifications remain to be issued.
Marine interfaces
Reservoir isolation, continued water supply and independent chamber sampling link maintenance to network operations. Portsmouth Water's September 2023 investment proposal describes supply-continuity and sampling limitations; implementation and current arrangements at individual sites require project-specific evidence.
Commercial evidence boundary
The notice gives an estimate of GBP 5,756,450, with tax treatment unspecified in the structured value field. Minor-work allocation depends on performance, availability, programming and geography. Payment, acceptance, security and guaranteed workload require the framework documents.

Contract and delivery chain

Work packages and named roles

Published scope, named parties and supporting evidence for each workstream.

Procurement ownership

Service-reservoir inspection and maintenance framework

Named party
Portsmouth Water
Evidence status
Confirmed
Source position
The planning notice names Portsmouth Water as buyer and describes the reservoir portfolio and proposed maintenance allocation. Source
Framework appointments

Two planned partners for routine, emergency and larger repairs

Named party
Suppliers not identified in the planning notice
Evidence status
Not evidenced
Source position
The notice proposes the allocation mechanism; no supplier appointment or award is disclosed in this history.

Evidence gap

What remains unverified

Outstanding evidence

  • Formal notice and submission deadline
  • UVDB registration and category coverage
  • Reservoir isolation and chamber sampling arrangements
  • Call-off allocation, payment and acceptance terms

Reporting status

Project phase
Planning
Evidence confidence
Confirmed
Last checked
31 October 2026
Cited sources
5

Sources and related records

Project changes Methodology Email a correction Project tracker

Project sources 5