Government-owned energy developer and petroleum-port principal

Abu Dhabi National Oil Company (ADNOC)

Petroleum terminal waterfront with marine loading structures, conveyors and large storage domes

ADNOC Petroleum Ports Authority; official petroleum-port visual

ADNOC is Abu Dhabi's government-owned integrated energy group and the developer and client behind Ruwais LNG.

Organization overview

Government-owned energy developer and petroleum-port principal

Geographic footprint: Middle East, United Arab Emirates, and Abu Dhabi. Core marine roles: Ruwais LNG project developer and marine-works client, Access-channel dredging and navigation-aids procuring entity, Petroleum-port governance principal through the Petroleum Ports Authority, and Marine-notice, permission and harbour-acceptance framework owner.

Project records 1 Last reviewed

Type

Government-owned energy developer and petroleum-port principal

Active regions

Middle East, United Arab Emirates, Abu Dhabi

Marine works roles

Ruwais LNG project developer and marine-works client, Access-channel dredging and navigation-aids procuring entity, Petroleum-port governance principal through the Petroleum Ports Authority, Marine-notice, permission and harbour-acceptance framework owner, Owner-side environmental, survey, handover and marine-readiness counterparty, LNG commercial programme sponsor

Role in marine infrastructure

ADNOC is Abu Dhabi's government-owned integrated energy group and the developer and client behind Ruwais LNG. Its Petroleum Ports Authority governs Jebel Dhanna-Ruwais port waters, publishes marine notices and controls the port's regulatory framework; Abu Dhabi Petroleum Ports Operating Company (IRSHAD) is the named port operator. For the LNG project, NMDC Group holds the access-channel dredging and navigation-aids package, while the Technip Energies, JGC and NMDC Energy joint venture holds the separate plant EPC contract.

Sources used 8

Source collections