Peruvian port authority and dredging client

Autoridad Portuaria Nacional (APN), Peru

Aerial view of a tanker berth at Callao's mineral-concentrate and hydrocarbon terminal inside the breakwater, with port infrastructure and cranes beyond

Autoridad Portuaria Nacional, Callao port-development update, 3 February 2026

Autoridad Portuaria Nacional is Peru's technical port authority under the Ministry of Transport and Communications.

Organization overview

Peruvian port authority and dredging client

Geographic footprint: Americas, Peru, and Callao. Core marine roles: National port planning, Port investment and technical review, Operations and environmental oversight, and Callao dredging client.

Project records 1 Last reviewed

Type

Peruvian port authority and dredging client

Active regions

Americas, Peru, Callao

Marine works roles

National port planning, Port investment and technical review, Operations and environmental oversight, Callao dredging client

Role in marine infrastructure

Autoridad Portuaria Nacional is Peru's technical port authority under the Ministry of Transport and Communications. It plans the National Port System, promotes investment and coordinates public and private participants. Its Operations and Environment Directorate supervises port operations, infrastructure use, services and environmental performance; the Technical Directorate regulates port aquatic areas, reviews infrastructure and equipment files and supervises execution. APN reported more than 132 million tonnes handled in 2025. At Callao, APN procured the 2025-26 access-channel and inner-roadstead maintenance dredging, announced the campaign and published its environmental reports. Terminal concessionaires, Jan De Nul, survey and laboratory providers and maritime-safety authorities retain separate operating, delivery and statutory roles.

Sources used 7

Source collections