Colombian engineering company and 10% Barranquilla dredging-consortium member

CFD Ingenieria SAS

CFD Ingenieria dredging consortium context aboard Xin Hai Ma during a Barranquilla access-channel project visit

Cormagdalena project context; not CFD Ingenieria-specific performance evidence

SECOP II records CFD Ingenieria SAS as the 10% member of Consorcio Dragado Puerto de Bquilla 2024-2025.

Organization overview

Colombian engineering company and 10% Barranquilla dredging-consortium member

Geographic footprint: Americas, Colombia, and Barranquilla. Core marine roles: 10% legal participant in Consorcio Dragado Puerto de Bquilla 2024-2025, Consortium-level responsibility for contract 0-525-2024, Project-specific engineering or field package not disclosed, and Self-performance and lower-tier responsibilities not evidenced.

Project records 1 Last reviewed

Type

Colombian engineering company and 10% Barranquilla dredging-consortium member

Active regions

Americas, Colombia, Barranquilla

Marine works roles

10% legal participant in Consorcio Dragado Puerto de Bquilla 2024-2025, Consortium-level responsibility for contract 0-525-2024, Project-specific engineering or field package not disclosed, Self-performance and lower-tier responsibilities not evidenced

Role in marine infrastructure

SECOP II records CFD Ingenieria SAS as the 10% member of Consorcio Dragado Puerto de Bquilla 2024-2025. The registered-provider dataset confirms an active Colombian company. The public records establish the legal share but do not identify a project-specific engineering, survey, environmental, vessel or dredging assignment and do not prove self-performance.

Sources used 3