Indian major-port authority and east-coast public port owner

Chennai Port Authority

Cruise vessel M.V. Empress alongside Chennai Port with the harbour water and working quay visible

Ministry of Ports, Shipping and Waterways via Press Information Bureau; GODL-India; West Quay operating context photographed 20 June 2026, not Berth 19A construction evidence

Chennai Port Authority is the statutory Board responsible for Chennai major port under India's Major Port Authorities Act 2021.

Organization overview

Indian major-port authority and east-coast public port owner

Geographic footprint: Asia Pacific, India, Tamil Nadu, Chennai, and Bay of Bengal. Core marine roles: Statutory major-port authority, Chennai port owner and public infrastructure client, Navigation channel, berthing and marine traffic administrator, and Bharathi, Dr Ambedkar and Jawahar dock asset owner.

Project records 1 Last reviewed

Type

Indian major-port authority and east-coast public port owner

Active regions

Asia Pacific, India, Tamil Nadu, Chennai, Bay of Bengal

Marine works roles

Statutory major-port authority, Chennai port owner and public infrastructure client, Navigation channel, berthing and marine traffic administrator, Bharathi, Dr Ambedkar and Jawahar dock asset owner, Berth reconstruction and civil engineering sponsor, Passenger, container, automobile and multi-cargo gateway

Role in marine infrastructure

Chennai Port Authority is the statutory Board responsible for Chennai major port under India's Major Port Authorities Act 2021. Ministry and PIB records identify the east-coast gateway's Bharathi, Dr Ambedkar and Jawahar dock system, navigation and marine-traffic responsibilities and 57.90 million tonnes of cargo handled in fiscal 2025-26. In January 2026 the Authority commissioned an indigenous vessel traffic monitoring system and new channel buoys. It is also the public client for Berth 19A at North Quay in Dr Ambedkar Dock, where IIT Madras is carrying out technical audit and detailed engineering through 31 December 2027. That INR 5.074 million consultancy is not a berth-construction contract: no construction tender, award, contractor, price, notice to proceed, mobilisation or acceptance is verified.

Sources used 9

Source collections