Egyptian public port authority and marine-infrastructure owner

Damietta Port Authority

Damietta Port harbour control tower and two harbour tugs moored inside the port

Egyptian Maritime Transport and Logistics Sector; Damietta Port operations image

Damietta Port Authority controls the port's marine base, including the entrance channel, breakwaters, harbour basin and common infrastructure.

Organization overview

Egyptian public port authority and marine-infrastructure owner

Geographic footprint: Africa, Egypt, and Eastern Mediterranean. Core marine roles: Damietta Port authority and common-infrastructure custodian, Entrance-channel, breakwater, basin and navigational-access authority, Container Terminal II quay-wall, excavation and dredging client, and Hydrographic, berth-depth and maintenance-dredging interface.

Project records 1 Last reviewed

Type

Egyptian public port authority and marine-infrastructure owner

Active regions

Africa, Egypt, Eastern Mediterranean

Marine works roles

Damietta Port authority and common-infrastructure custodian, Entrance-channel, breakwater, basin and navigational-access authority, Container Terminal II quay-wall, excavation and dredging client, Hydrographic, berth-depth and maintenance-dredging interface, Marine-platform handover counterparty for the terminal concession, Long-term quay, access and port-environment stewardship interface

Role in marine infrastructure

Damietta Port Authority controls the port's marine base, including the entrance channel, breakwaters, harbour basin and common infrastructure. At Container Terminal II, also known as Tahya Misr 1, the authority delivered the quay walls, excavation, access-channel and basin dredging, utilities and connections to the terminal boundary. Damietta Alliance Container Terminals financed, equipped and operates the separate terminal superstructure under its concession.

Sources used 6

Source collections