Dredging contractor

Dutch Dredging

Dutch Dredging dredging equipment working on a maintenance dredging campaign in a waterway

Dutch Dredging

International operating name of Baggerbedrijf De Boer, with trailing-suction hopper dredging, water-injection dredging and long-term maintenance work across ports, waterways and coastal assignments for public authorities, terminal operators and industrial clients.

Organization overview

Dredging contractor

Geographic footprint: Europe, Africa, Americas, and Asia Pacific. Core marine roles: Dredging contractor, Maintenance dredging contractor, Trailing-suction hopper dredger operator, and Water-injection dredging contractor.

Project records 2 Last reviewed

Type

Dredging contractor

Active regions

Europe, Africa, Americas, Asia Pacific

Marine works roles

Dredging contractor, Maintenance dredging contractor, Trailing-suction hopper dredger operator, Water-injection dredging contractor, Marine plant owner

Role in marine infrastructure

International operating name of Baggerbedrijf De Boer, with trailing-suction hopper dredging, water-injection dredging and long-term maintenance work across ports, waterways and coastal assignments for public authorities, terminal operators and industrial clients.

Sources used 5

Source collections