Victorian statutory coastal and local-port authority

Great Ocean Road Coast and Parks Authority

Port of Apollo Bay harbour with its commercial fishing fleet, marina berths, wharf and breakwater

Great Ocean Road Coast and Parks Authority; Port of Apollo Bay operating context, not evidence of C26-0068 seawall construction progress

The Great Ocean Road Coast and Parks Authority is Victoria's dedicated statutory manager for approximately 170,000 hectares and 355 kilometres of coastline, including three local ports: Apollo Bay, Port Campbell and Lorne.

Organization overview

Victorian statutory coastal and local-port authority

Geographic footprint: Asia Pacific, Australia, Victoria, Great Ocean Road, Apollo Bay, Port Campbell, and Lorne. Core marine roles: Statutory coast-and-parks manager, Port manager for Apollo Bay, Port Campbell and Lorne, Apollo Bay waterway manager and harbour-master function holder, and Harbour dredging and navigation-aid maintenance authority.

Project records 1 Last reviewed

Type

Victorian statutory coastal and local-port authority

Active regions

Asia Pacific, Australia, Victoria, Great Ocean Road, Apollo Bay, Port Campbell, Lorne

Marine works roles

Statutory coast-and-parks manager, Port manager for Apollo Bay, Port Campbell and Lorne, Apollo Bay waterway manager and harbour-master function holder, Harbour dredging and navigation-aid maintenance authority, Wharf, marina, mooring, boat-ramp and slipway asset manager, Coastal protection and marine-infrastructure client

Role in marine infrastructure

The Great Ocean Road Coast and Parks Authority is Victoria's dedicated statutory manager for approximately 170,000 hectares and 355 kilometres of coastline, including three local ports: Apollo Bay, Port Campbell and Lorne. It has managed, operated and maintained Apollo Bay since 1 July 2024. The Authority acts as port and waterway manager, performs harbour-master functions while no separate harbour master is appointed, and maintains the dredged channel, navigation aids, berths, moorings, boat ramp, wharf and slipway. Maintenance Concepts Pty Ltd holds the AUD 896,000 C26-0068 seawall package for a recorded 20 July to 21 September 2026 contract period. That period does not prove mobilisation, installed work, completion or acceptance.

Sources used 7

Source collections