New Zealand marine contractor and dredging-fleet operator

Johnson Bros Limited

Johnson Bros multipurpose barge Mahikuri carrying a long-reach excavator in sheltered New Zealand waters

Johnson Bros Limited; existing Mahikuri fleet capability, not the proposed regional-port dredging barge

Johnson Bros is a New Zealand-owned specialist marine contractor working in dredging, marine construction, pile driving, towing, salvage, pontoons and floating structures.

Organization overview

New Zealand marine contractor and dredging-fleet operator

Geographic footprint: Asia Pacific, New Zealand, and Northland and regional ports. Core marine roles: Shallow-water dredging contractor, Marine construction and pile-driving contractor, Multipurpose barge and tug operator, and Hydrographic pre-dredge and post-dredge survey interface.

Project records 1 Last reviewed

Type

New Zealand marine contractor and dredging-fleet operator

Active regions

Asia Pacific, New Zealand, Northland and regional ports

Marine works roles

Shallow-water dredging contractor, Marine construction and pile-driving contractor, Multipurpose barge and tug operator, Hydrographic pre-dredge and post-dredge survey interface, Dredged-material handling and consent-monitoring contractor, Towing, salvage and emergency marine-response provider, Private co-funder for the planned regional-port dredging barge, Future vessel procurement and operating-interface counterparty

Role in marine infrastructure

Johnson Bros is a New Zealand-owned specialist marine contractor working in dredging, marine construction, pile driving, towing, salvage, pontoons and floating structures. Its existing fleet includes the Mahikuri multipurpose barge, tugs and smaller transport and work barges. The company is the private co-funder identified for New Zealand's planned regional-port crane dredger hopper barge; that funding role does not establish a designer, shipyard, executed build contract or completed vessel.

Sources used 6

Source collections