South Tarawa water, sewerage and power utility

Public Utilities Board (PUB), Kiribati

A sanitation specialist inspects a screened sewage-system unit beside the South Tarawa shoreline in Kiribati

Asian Development Bank; South Tarawa sewage-system rehabilitation photographed in July 2017, not evidence of current outfall construction or condition

Kiribati's Public Utilities Board operates water and sewerage services in South Tarawa.

Organization overview

South Tarawa water, sewerage and power utility

Geographic footprint: Asia Pacific, Pacific islands, Kiribati, and South Tarawa. Core marine roles: South Tarawa water and sewerage utility, Betio, Bairiki and Bikenibeu sewerage-system operator, Ocean-outfall pump, pipeline and diffuser asset custodian, and Saltwater flushing and sewer-network maintenance authority.

Project records 1 Last reviewed

Type

South Tarawa water, sewerage and power utility

Active regions

Asia Pacific, Pacific islands, Kiribati, South Tarawa

Marine works roles

South Tarawa water and sewerage utility, Betio, Bairiki and Bikenibeu sewerage-system operator, Ocean-outfall pump, pipeline and diffuser asset custodian, Saltwater flushing and sewer-network maintenance authority, Sewer cleaning, inspection, spares and preventive-maintenance planner, Discharge, plume and receiving-water evidence holder, Owner-side operating acceptance and asset-handover interface, Sanitation connections, billing and service-performance operator

Role in marine infrastructure

Kiribati's Public Utilities Board operates water and sewerage services in South Tarawa. That makes PUB the long-term custodian of the Betio, Bairiki and Bikenibeu systems rebuilt under the completed ADB programme, including the network and pumping interfaces that feed three ocean outfalls. MISE remains the implementing agency for the later World Bank sanitation project, while PUB carries the operating, maintenance and service-delivery role.

Sources used 6

Source collections