Croatian port operator and terminal concessionaire

Luka Ploce d.d.

Luka Ploce stacker-reclaimer operating across dry-bulk stockpiles at the new terminal

Luka Ploce d.d.; exact operating dry-bulk terminal equipment

Luka Ploce operates cargo terminals, storage and forwarding services at Croatia's Port of Ploce.

Organization overview

Croatian port operator and terminal concessionaire

Geographic footprint: Europe, Croatia, Adriatic, and Corridor Vc. Core marine roles: Port and terminal operator, Dry-bulk terminal concessionaire, Cargo-handling equipment investor and procurer, and Rail-linked cargo logistics provider.

Project records 1 Last reviewed

Type

Croatian port operator and terminal concessionaire

Active regions

Europe, Croatia, Adriatic, Corridor Vc

Marine works roles

Port and terminal operator, Dry-bulk terminal concessionaire, Cargo-handling equipment investor and procurer, Rail-linked cargo logistics provider, Storage and forwarding services provider

Role in marine infrastructure

Luka Ploce operates cargo terminals, storage and forwarding services at Croatia's Port of Ploce. At the New Bulk Cargo Terminal it is the concessionaire responsible for handling equipment and operations, while Port of Ploce Authority owns and delivered the basic infrastructure. Luka Ploce contracted CNBM International Engineering for the handling system, brought the terminal through trial operation and began regular service in February 2021.

Sources used 6

Source collections