Colombian dredging and marine-works contractor; 20% Barranquilla consortium member

Panamerican Dredging

Panamerican Dredging marine works excavator operating from a barge in Barranquilla, Colombia

Panamerican Dredging corporate portfolio

SECOP II records Panamerican Dredging as the 20% member of Consorcio Dragado Puerto de Bquilla 2024-2025.

Organization overview

Colombian dredging and marine-works contractor; 20% Barranquilla consortium member

Geographic footprint: Americas, Colombia, Caribbean coast, and Barranquilla. Core marine roles: 20% legal participant in Consorcio Dragado Puerto de Bquilla 2024-2025, Dredging and hydraulic works capability, Bathymetric and topographic surveys, and Maritime and fluvial construction.

Project records 1 Last reviewed

Type

Colombian dredging and marine-works contractor; 20% Barranquilla consortium member

Active regions

Americas, Colombia, Caribbean coast, Barranquilla

Marine works roles

20% legal participant in Consorcio Dragado Puerto de Bquilla 2024-2025, Dredging and hydraulic works capability, Bathymetric and topographic surveys, Maritime and fluvial construction, Quay construction and repair, Outfalls, marine plant and waterborne transport, Contract-specific self-performance not disclosed

Role in marine infrastructure

SECOP II records Panamerican Dredging as the 20% member of Consorcio Dragado Puerto de Bquilla 2024-2025. Its official corporate site says the Barranquilla company has operated since 1996 across dredging, hydraulic and marine works, bathymetric and topographic surveys, quay construction and repair, outfalls, marine plant and transport. The legal 20% share does not prove that Panamerican self-performed 20% of this contract or operated the named dredgers.

Sources used 3

Source collections