Malaysian container-terminal owner and transshipment operator

Port of Tanjung Pelepas

Port of Tanjung Pelepas, MMC Engineering and Antara Koh representatives after signing the Berth Zero development contract

MMC Corporation Berhad; exact Berth Zero client and civil-joint-venture signing event

Port of Tanjung Pelepas is Malaysia's major transshipment container terminal, owned 70% by MMC Group and 30% by APM Terminals.

Organization overview

Malaysian container-terminal owner and transshipment operator

Geographic footprint: Asia Pacific, Malaysia, Johor, and Strait of Malacca. Core marine roles: Container-terminal owner and operator, Marine civil works client, Dredging, reclamation and berth acceptance authority, and Quay-crane and yard-equipment procurement client.

Project records 1 Last reviewed

Type

Malaysian container-terminal owner and transshipment operator

Active regions

Asia Pacific, Malaysia, Johor, Strait of Malacca

Marine works roles

Container-terminal owner and operator, Marine civil works client, Dredging, reclamation and berth acceptance authority, Quay-crane and yard-equipment procurement client, Operating-port interface coordinator, Capacity and productivity programme owner, Berth Zero commissioning authority

Role in marine infrastructure

Port of Tanjung Pelepas is Malaysia's major transshipment container terminal, owned 70% by MMC Group and 30% by APM Terminals. It handled 14 million TEU in 2025 and is client for Berth Zero, a 360-metre dredging, reclamation, berth and yard expansion awarded to the MMC Engineering-Antara Koh joint venture.

Sources used 5

Source collections