Ghanaian shipyard developer, concessionaire and future dry-dock operator

Prime Meridian Docks

Prime Meridian Docks and PIDG representatives at the Ghana-UK Investment Summit in London on 1 June 2026

Private Infrastructure Development Group; PMD and PIDG representatives at the June 2026 funding announcement, not evidence of financial close or construction start

Prime Meridian Docks is the Ghanaian sponsor and developer behind Project Shiprite at the Port of Takoradi.

Organization overview

Ghanaian shipyard developer, concessionaire and future dry-dock operator

Geographic footprint: Africa, Ghana, Gulf of Guinea, and Port of Takoradi. Core marine roles: Project Shiprite sponsor and developer, Takoradi floating-dock asset company and concessionaire, Future ship-repair and dry-dock operator, and Civil EPC, dredging and floating-dock procurement counterparty.

Project records 1 Last reviewed

Type

Ghanaian shipyard developer, concessionaire and future dry-dock operator

Active regions

Africa, Ghana, Gulf of Guinea, Port of Takoradi

Marine works roles

Project Shiprite sponsor and developer, Takoradi floating-dock asset company and concessionaire, Future ship-repair and dry-dock operator, Civil EPC, dredging and floating-dock procurement counterparty, Rock-dredging, reclamation and jetty owner interface, Floating-dock tow-in, mooring and utility-integration owner, Lender environmental, social and dredging-control interface, Owner-side commissioning, dock trials and facility acceptance body

Role in marine infrastructure

Prime Meridian Docks is the Ghanaian sponsor and developer behind Project Shiprite at the Port of Takoradi. PMD AssetCo holds the project-company role under a 25-year concession with the Ghana Ports and Harbours Authority. The planned yard combines a floating dry dock, jetty, rock dredging, reclaimed working land and vessel-repair facilities. PIDG joined the capital stack in June 2026, but the reviewed public record does not confirm financial close or construction start.