Portuguese engineering contractor with marine, port, foundation and heavy-civil delivery capability

Teixeira Duarte - Engenharia e Construcoes

Porto Ingles open jetty and vessel-berthing context before Teixeira Duarte's consortium modernisation works on Maio

Teixeira Duarte Engenharia e Construcoes; Porto Ingles project context

Teixeira Duarte - Engenharia e Construcoes led the Porto Ingles consortium with a 37% share alongside SETH at 33% and Armando Cunha Cabo Verde at 30%.

Organization overview

Portuguese engineering contractor with marine, port, foundation and heavy-civil delivery capability

Geographic footprint: Europe, Africa, Cabo Verde, Portugal, Angola, Mozambique, and Algeria. Core marine roles: Marine consortium lead, Design-and-build port contractor, Piled Ro-Ro platform contractor, and Breakwater and coastal-protection contractor.

Project records 1 Last reviewed

Type

Portuguese engineering contractor with marine, port, foundation and heavy-civil delivery capability

Active regions

Europe, Africa, Cabo Verde, Portugal, Angola, Mozambique, Algeria

Marine works roles

Marine consortium lead, Design-and-build port contractor, Piled Ro-Ro platform contractor, Breakwater and coastal-protection contractor, Jetty rehabilitation contractor, Foundation and sheet-pile contractor, Logistics-platform and port-access contractor

Role in marine infrastructure

Teixeira Duarte - Engenharia e Construcoes led the Porto Ingles consortium with a 37% share alongside SETH at 33% and Armando Cunha Cabo Verde at 30%. The design-and-build scope included the existing jetty rehabilitation, piled Ro-Ro platform, detached breakwater, sheet-pile works, logistics platform and road access. Its role is supported by the contractor's award record, Cabo Verde's contract notices and a joint technical paper with SETH.

Sources used 6

Source collections