Italian private multipurpose port-terminal concessionaire and marine-infrastructure buyer

Terminal del Golfo (TDG)

Operational overview of Terminal del Golfo at La Spezia, a compact Mediterranean multipurpose terminal with container and Ro-Ro interfaces

IMWO profile illustration for Terminal del Golfo (TDG)

Terminal del Golfo S.p.A. is Tarros Group's private multipurpose port terminal at La Spezia and the buyer for the current Lot I expansion contract.

Organization overview

Italian private multipurpose port-terminal concessionaire and marine-infrastructure buyer

Geographic footprint: Europe, Italy, Ligurian Sea, Port of La Spezia, and Mediterranean. Core marine roles: Private terminal concessionaire and operator, Container and multipurpose cargo terminal operator, Quay-extension and terminal-expansion buyer, and Live-terminal interface owner.

Project records 1 Last reviewed

Type

Italian private multipurpose port-terminal concessionaire and marine-infrastructure buyer

Active regions

Europe, Italy, Ligurian Sea, Port of La Spezia, Mediterranean

Marine works roles

Private terminal concessionaire and operator, Container and multipurpose cargo terminal operator, Quay-extension and terminal-expansion buyer, Live-terminal interface owner, Berth, yard and cargo-handling asset operator, Ro-Ro, reefer, project and general-cargo handler, Rail, road and maritime intermodal interface, Owner-side procurement and contract counterparty

Role in marine infrastructure

Terminal del Golfo S.p.A. is Tarros Group's private multipurpose port terminal at La Spezia and the buyer for the current Lot I expansion contract. Tarros reports two 150 m berths, draft up to 12 m, a 75,000 m2 yard and handling above 110,000 TEU per year, with container, reefer, dangerous-goods, Ro-Ro, project and general-cargo capability. TDG's operating and procurement roles do not make it the construction contractor, port-authority dredging client or lower-tier package provider.