Port and maritime operator

AD Ports Group

Aerial view of AD Ports Group port infrastructure with breakwaters, terminal yards, quay cranes, and waterfront access

AD Ports Group

Abu Dhabi-based integrated ports, maritime, shipping, logistics, economic zones and digital group with a growing international terminal portfolio.

Organization overview

Port and maritime operator

Geographic footprint: Global, including Middle East, Africa, Asia Pacific, and Europe. Core marine roles: Port owner and operator, Terminal concessionaire, Maritime services provider, and Infrastructure developer.

Project records 2 Last reviewed

Type

Port and maritime operator

Active regions

Middle East, Africa, Asia Pacific, Europe, Global

Marine works roles

Port owner and operator, Terminal concessionaire, Maritime services provider, Infrastructure developer, Logistics operator

Role in marine infrastructure

Abu Dhabi-based integrated ports, maritime, shipping, logistics, economic zones and digital group with a growing international terminal portfolio. At Pointe-Noire it holds 51% of the Noatum Ports operating venture with CMA Terminals and awarded the 2026 marine, topside and crane packages for a separate new terminal concession.

Sources used 8

Source collections