African port terminal operator, concessionaire and brownfield marine-infrastructure investor

Marsa Maroc

Marsa Maroc bulk-handling cranes working at the existing Port of Nador; the photograph documents the operator's regional activity and is not a Nador West Med construction image

Marsa Maroc media library

Moroccan listed port operator with a current reported footprint of 34 terminals in 20 ports and more than 60 million tonnes of annual traffic.

Organization overview

African port terminal operator, concessionaire and brownfield marine-infrastructure investor

Geographic footprint: Africa, Morocco, Mediterranean, Nador West Med, Casablanca, and Jorf Lasfar. Core marine roles: Container-terminal concessionaire, Terminal developer and equipment investor, Port operations and maintenance provider, and Multipurpose-terminal owner-operator.

Project records 3 Last reviewed

Type

African port terminal operator, concessionaire and brownfield marine-infrastructure investor

Active regions

Africa, Morocco, Mediterranean, Nador West Med, Casablanca, Jorf Lasfar

Marine works roles

Container-terminal concessionaire, Terminal developer and equipment investor, Port operations and maintenance provider, Multipurpose-terminal owner-operator, Brownfield quay-strengthening and deepening investor, Berth-extension and mooring-system investor, Towing joint-venture participant, Terminal digital-systems operator, Cargo-handling and logistics-services provider

Role in marine infrastructure

Moroccan listed port operator with a current reported footprint of 34 terminals in 20 ports and more than 60 million tonnes of annual traffic. Its active marine portfolio now includes the Nador West Med container-terminal concessions, Casablanca's staged multipurpose-quay deepening and Jorf Lasfar's multipurpose berth-front extension. Marsa Maroc is the owner-operator and EBRD borrower for the Casablanca and Jorf programme; public evidence separates those civil packages from their crane acquisitions and from port-authority navigation and acceptance responsibilities.

Sources used 10

Source collections