Manangareza's contractor chain is visible before its field start
Three World Bank contract records expose the delivery chain for Toamasina's Manangareza river-port station. ECH BTP holds the USD 1,272,815.07 works contract, while Bureau d'Etudes Da Vinci SARL and Cabinet d'Architecture A&C hold separate design and supervision appointments. Owner materials define one works lot and a passenger-goods operating concept, but they do not confirm notice to proceed, mobilisation, completed quantities or acceptance.
A signed works contract now completes the named delivery chain
World Bank records identify the prime, consultant roles, references, signed dates and values. PIC's tender and consultant materials define the one-lot boundary and intended terminal concept only. No cited source establishes mobilisation, physical progress, acceptance or lower-tier appointments.
Passenger and goods separation makes the terminal interface material
The award chain is unusually legible for a modest inland terminal: the public record identifies the works prime, design team and supervision team separately. That creates a practical watchlist for drawing release, supervision commencement, river-edge access and passenger-cargo segregation. It does not reveal awarded quantities, project plant, lower-tier suppliers, possession arrangements or verified construction progress.
Evidence conclusion
Contract visibility still stops before construction evidence
ECH BTP is the confirmed prime contractor under 031/T/PIC3/2025, not merely a likely bidder. Da Vinci/A&C hold the design and supervision roles rather than an installation subcontract. The consultant terms' nine-month forecast is a pre-award planning assumption, and the World Bank's 27 April 2026 no-objection field is administrative. Neither establishes a site start, works duration, completion or operating release.
Outstanding evidence
- Notice to proceed, site possession and actual mobilisation
- Approved drawings, bill of quantities and terminal dimensions
- Confirmed supervision commencement and staffing
- Passenger-goods separation and temporary boarding controls
- Named river plant, material suppliers and lower-tier contractors
- Measured progress, certificates, variations and extensions
- Completion, defects status and operational release
- Certified expenditure and final account
Subject index
Related subjects
These subject pages bring together related projects, technical articles, reports, and evidence methods.
Sources used 5
- Manangareza works contract award record 1882240 World Bank Contract Awards, Contract signed 28 November 2025; checked 10 August 2026
- Manangareza construction-supervision contract record 1815052 World Bank Contract Awards, Contract signed 8 November 2023; checked 10 August 2026
- Manangareza design-study contract record 1758021 World Bank Contract Awards, Contract signed 8 November 2023; checked 10 August 2026
- T-001/PIC3/2025 national open tender notice PIC Madagascar, 1 August 2025
- Terms of reference for Manangareza studies and supervision PIC Madagascar, Pre-award consultant terms checked 10 August 2026