Houston-headquartered Great Lakes Dredge & Dock operates a large U.S. dredging fleet across capital channel improvement, maintenance, coastal protection and restoration work.
Organization overview
Dredging, coastal protection and marine infrastructure contractor
Geographic footprint: Americas, United States, Atlantic Coast, Gulf Coast, Pacific Coast, Great Lakes, and International markets. Core marine roles: Capital channel-deepening contractor, Maintenance-dredging contractor, Trailing suction hopper dredge operator, and Cutter suction and mechanical dredge operator.
Project records5Last reviewed
Type
Dredging, coastal protection and marine infrastructure contractor
Active regions
Americas, United States, Atlantic Coast, Gulf Coast, Pacific Coast, Great Lakes, International markets
Marine works roles
Capital channel-deepening contractor, Maintenance-dredging contractor, Trailing suction hopper dredge operator, Cutter suction and mechanical dredge operator, Beach nourishment and coastal-protection contractor, Dredged-material placement and habitat-restoration contractor, Brazos Island Harbor FY24 maintenance-dredging prime contractor, Sabine-Neches Contract 6 prime contractor
Role in marine infrastructure
Houston-headquartered Great Lakes Dredge & Dock operates a large U.S. dredging fleet across capital channel improvement, maintenance, coastal protection and restoration work. Its official equipment register covers trailing suction hopper, cutter suction and mechanical dredges. Federal, owner and navigation records place the company on Sabine-Neches Contract 6, New Haven Harbor improvement dredging, the Ocean City and Peck Beach nourishment programme and the FY24 Brazos Island Harbor maintenance campaign, where the Coast Guard specifically named Padre Island. Project-specific records control those roles; corporate capability does not identify every assigned vessel or lower tier.
Related records 5
Sabine-Neches Waterway Channel Improvement ProjectProject record / United States / Callan Marine 44-foot package awarded; Great Lakes offshore Contract 6 in delivery; final 48-foot inland cut remains separate
Ocean City and Peck Beach 2026 Periodic NourishmentProject record / United States / USACE records September 7 completion; the city reports 1.6 million cubic yards placed; New Jersey requested storm-repair assistance on October 16
New Haven Harbor improvement dredgingProject record / United States / USACE DQM lists W912WJ26CA017 as active from 24 October 2026, naming Great Lakes and GL 58, GL 67 and GL 68.
Sabine-Neches Contract 6 offshore channel deepeningProject record / United States / Great Lakes holds the USD 219.108 million Contract 6 obligation; its USD 235.423 million potential value, April 2027 owner finish, production, assigned fleet and lower tiers remain to be confirmed
Brazos Island Harbor FY24 entrance and jetty maintenance dredgingProject record / United States / Great Lakes' Padre Island campaign was publicly scheduled from 20 October to 16 November 2024; an April 2025 final-quantity modification reduced the current federal obligation from USD 8.799 million to USD 7.456 million, while accepted quantities and formal closeout remain unpublished